STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 316, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                Residual
                                                                                                                                                                                                             Responsible




                                                              Rating
                                                              Initial
                                                                                                                             Proposed Controls




                                                                        HOC
                                                               Risk




                                                                                                                                                                                                  Risk
                Activity                   Hazards
                                                                                                (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                Person

                                     Undermining other       EXTREME    5     Where there are any excavations which may affect the stability of adjoining structures, a geotechnical report                      Site
                                     structures                               shall be compiled by a qualified engineer to identify the controls that are to be implemented to prevent                      Management
                                                                              exposure to health and safety from the collapse of all or part of the structure.                                             Contract Partner

                                     Collapse of             EXTREME    5     Daily inspections of trenches and excavations will be undertaken actioned and recorded on the Weekly                               Site
                                     excavation or trench                     Inspection Sheet.                                                                                                             Management
                                                                                                                                                                                                           Contract Partner
                                     Inadequate              EXTREME    5     A competent person will supervise all excavation work.                                                                             Site
                                     supervision                                                                                                                                                            Management
                                                                                                                                                                                                           Contract Partner
                                     Persons falling         EXTREME    5     Excavation areas will be signed as required.                                                                                       Site
                                                                                                                                                                                                            Management
                                                                                                                                                                                                           Contract Partner
                                     Confined spaces         EXTREME    5     Where an excavation meets the requirements as a confined space, the confined space requirements of the                             Site
                                                                              project risk assessment will apply.                                                                                           Management
                                     Build-up of exhaust                                                                                                                                                   Contract Partner
                                     fumes etc.

                                     Contact with            EXTREME    5     Any further information available to Woollam about ground conditions and risks such as contamination by                            Site
                                     chemicals                                hazardous substances etc. will be provided to each person who is to do excavation work.                                       Management
                                                                                                                                                                                                           Contract Partner
                                                                              (Note: Woollam Hazardous Substances procedures may apply in these cases)

                                     Collapse of             EXTREME    5     Excavations for basement walls to be as per engineer’s design and geotechnical engineer design.                                    Site
                                     excavation or trench                                                                                                                                                   Management
                                                                                                                                                                                                           Contract Partner

     12.2             Anchoring
Planning for the set up and use of   Ground conditions       EXTREME    3     Set up work platform for anchor rig is as per manufacturers specifications. Ensure the ground is suitable for                      Site
anchoring rig                        unsuitable                               set up and machine will not become unstable or collapse. Working platform and vertical excavations to be                      Management
                                                                              inspected after large rain events.                                                                                           Contract Partner

                                     Plant not being         EXTREME    5     All Contract Partner’s will provide a register for all equipment to be used on site and / or load equipment to                     Site
                                     maintained /                             Procore. This register will detail records of any tests, maintenance, inspections, commissioning, or alteration               Management
                                     serviced at required                     of the plant and must show when the next service is due for each item.                                                       Contract Partner
                                     intervals.

Use of anchor rig                    Plant and equipment     EXTREME    5     Mobile Plant Checklist located on Procore to be completed when an anchor rig is brought onto site. The                             Site
                                     not suitable for the                     initial plant prestart will be approved by Woollam site management, and a plant approved sticker provided.                    Management
                                     activity                                                                                                                                                              Contract Partner

                                     Activity planning and   EXTREME    5     All tasks involving the use of plant or equipment to have an approved SWMS in place.                                         Contract Partner
                                     hazard identification                    Contract Partner’s will ensure all persons involved in the stressing of anchors are provided with all available
                                                                              information relating to health and safety whilst working with stressing anchors.

                                                                                                                                             Project Hazard/Risk Assessment / Page 74 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.