Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 352, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                              Residual
                                                                                                                                                                                                         Responsible




                           Rating
                           Initial
                                                                                                           Proposed Controls




                                     HOC
                            Risk




                                                                                                                                                                                                Risk
Activity       Hazards
                                                                              (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)                                              Person

                                           r. Professional engineer certification of non-proprietary equipment.
                                           s. Evidence that the formally conforms to Australian Standards.
                                           t. Vertical pour rates.
                                           u. Methods of securing single or multiple props
           Collapse of   EXTREME     5     Formwork drawings must explain:                                                                                                                               Formwork
           formwork                                                                                                                                                                                       Contract
                                           - Plans, elevations, and sections to show the general arrangement of the formwork and to identify and locate all members and                                   Partner/
                                               components including bracing.                                                                                                                              Engineer
                                           -   Wall and column form details
                                           -   The maximum point loadings to be applied.
                                           -   The component types and spacings.
                                           -   The maximum jack extensions.
                                           -   The bearer and joint timber type, the dimensions and spacings.
                                           -   The prop sizes and maximum extensions.
                                           -   The method for tying the structure together and spacing between ties (if required); and
                                           -   The form ply size

           Collapse or   EXTREME     5     Formwork must be designed by a competent person or an RPEQ certified engineer as per the table below referenced from the Formwork
           Formwork                        COP 2016.




                                                                                                                                           Project Hazard/Risk Assessment / Page 110 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.