STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 354, section 1. The text section number identifies this passage in the reader.
Residual
Responsible
Rating
Initial
Proposed Controls
HOC
Risk
Risk
Activity Hazards
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE) Person
Falls from EXTREME 5 Formwork contractor will ensure that their work method complies with the COP for formwork 2016 with work at the leading edge always Site
height being protected by at least 1.8m of false work (catch deck) in all directions. Management
All timbers or proprietary systems must be laid from below to remove work at height risks.
Collapse of EXTREME 5 Formwork that is a “basic formwork system” will be designed by a formwork designer or professional RPEQ engineer. Site
formwork Management
Contract
Partner
Collapse of EXTREME 5 Formwork that is not a “basic formwork system” will be designed by a professional RPEQ engineer. Site
formwork Management
Contract
Partner
Collapse of EXTREME 5 Prior to any concrete pour, a qualified formwork engineer nominated by the form worker will inspect the formwork and back propping Site
formwork design to certify (through a signed inspection sheet) that the formwork is as per the certified design and AS 3610 and is ready for concrete Management
pouring. Contract
Partner
Collapse of EXTREME 4 Back propping will be required and designed by a professional engineer. Site
formwork Management
A copy of the back propping plan will be available on site to both Woollam and the Formwork Contractor. Contract
Partner
Collapse of EXTREME 5 A formwork assembly check and monitoring will be undertaken by the formwork contractor during the concrete pour, with hazards identified Site
formwork to be rectified or if necessary, the pour diverted or stopped to ensure the safe progression of the pour. Management
Contract
Partner
Falls from EXTREME 5 Fall from heights controls as required by the project risk assessment will be implemented as required for formwork tasks. Site
height Management
Contract
Partner
Fall from height EXTREME 3 External perimeter screens with mesh with openings of no more than 50mm x 25mm with 2.5mm diameter steel (or 50 x 50mm with Site
approved lining) will be erected to the full height of the building where formwork is erected, and the screens will extend at least one (1) Management
metre above the formwork prior to erection. Contract
Partner
Falls from EXTREME 5 Any formwork such as wall or column forms to be lifted by a crane will have an engineer’s certificate certifying the lifting points and lifting Site
height method. Management
Contract
Partner
Collapse of EXTREME 5 Slip and jump form will include additional details to address compliance with the Formwork COP requirements. Site
formwork Management
a. Provision of safe access to all working areas Contract
falling objects Partner
b. Control of risks associated with working at height.
noise and dust
c. Provision of sufficient working space and head room
manual tasks
Project Hazard/Risk Assessment / Page 112 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.