Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Not less than one fire extinguisher to suit Class A, B and C fires and fires involving electrical equipment will be always provided on
each storey adjacent to each required exit or temporary stair or exit
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract
route, isolate procedures and Partners
specific hazard, processes
prevent spread
of contaminants Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
where possible unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract
Partners
Site
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Management
familiar with assembly point and pedestrian routes. Contract
location of Partners
assembly
point/s or
pedestrian
traffic routes
19.15 Heat Related Illness
Planning Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, Management
hazard
identification, HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
resourcing, and Management
implementation
of controls
HIGH 5 Assist casualty to air-conditioned amenities and administer immediate first aid to cool the injured worker. Site
Management
Use of specific General First MEDIUM 4 Ensure first aid facilities are maintained in good order and stocked as per first aid contents list and within expiry date. Site
equipment Aid equipment, Management
ice packs and
Project Hazard/Risk Assessment / Page 145 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.