Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Site
Use of specific Retrieval MEDIUM 4 Ensure access to lift is clear of any obstructions and easily accessible Management
equipment equipment and
as provided by Contract Partner
Emergency
Services
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract Partner
route, isolate procedures and
specific hazard, processes
prevent spread
of contaminants Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
where possible unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract Partner
Site
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Management
familiar with assembly point and pedestrian routes.
location of Contract Partner
assembly
point/s or
pedestrian
traffic routes
19.17 Medical Emergency
Planning Activity HIGH Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, hazard Management
identification,
resourcing, and
HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
implementation
of controls Management
Use of specific First aid room HIGH Ensure first aid facility is maintained in good order with all first aid kits fully stocked and contents within expiry date Site
equipment First aid kits Management
Stretcher
Project Hazard/Risk Assessment / Page 147 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.