Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 392, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
Inadequate - Emergency lighting will be in accordance with AS/NZS 3012 requiring a minimum of 20 lux. Site
EXTREME 5 Management
temporary or - Sufficient battery powered lighting (minimum 1 hour capacity) will be installed in stairways, passageways and adjacent to
emergency switchboards to allow safe access to and egress from the area if there is insufficient natural “lighting” for the case of Contract Partner
light levels emergency.
- Emergency Lighting shall be verified by measurement using an appropriate light level meter with records of the test provided to
Woollam.
Emergency Lighting is to be provided in designated access and egress paths and directly above and in front of switchboards where
natural lighting requirements cannot be met using natural lighting.
Site
Use of specific Alarm system HIGH 5 Ensure emergency lighting is regularly checked by electrical contractor and tested in Evacuation drill. Management
equipment (not power
reliant) Contract Partner
emergency
lighting in
corridors and
common areas
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract
route, isolate procedures and Partners
specific hazard, processes
prevent spread
of contaminants Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
where possible unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details. Contract
Partners
Site
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Management
familiar with assembly point and pedestrian routes.
location of Contract
assembly Partner
point/s or
pedestrian
traffic routes
19.20 Roof Rescue
Project Hazard/Risk Assessment / Page 150 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.