STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 398, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                       Residual
                                                                                                                      Proposed Controls                                                                             Responsible




                                        Rating
                                        Initial
                                         Risk




                                                                                                                                                                                                         Risk
                                                      HC
     Activity            Hazard                                                                                                                                                                                       Person
                                                                                           (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


                     pedestrian
                     traffic routes


     19.25           Tower Crane Rescue
Planning             Activity          HIGH       5        Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO.                                Site
                     planning,                                                                                                                                                                                    Management
                     hazard
                     identification,   HIGH       5        Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project.                                           Site
                     resourcing, and                                                                                                                                                                              Management
                     implementation
                     of controls

                                                                                                                                                                                                                  Site
                     Emergency         EXTREME    5        For all emergency response & retrieval plans utilising the crane all workers involved must be inducted into the content of the                         Management
                     response                              Emergency Response Plan (ie jump form retrieval, use of man box etc.)
                     process                                                                                                                                                                                      Contract Partner

                                                           Assess if any workers are trapped or injured and only respond if safe to do so. Contact Emergency Services                                             Site
                                       HIGH       5                                                                                                                                                               Management
                                                           Only trained and competent person to perform rescue.
                                                                                                                                                                                                                  Contract Partner

                                                                                                                                                                                                                  Site
                                       HIGH       4        Only licensed and competent workers with high-risk license to perform rescue                                                                           Management
                                                                                                                                                                                                                  Contract Partner

                                                                                                                                                                                                                  Site
Use of specific      Harness and       HIGH       5        Equipment to be maintained and serviced, tagged 6 monthly                                                                                              Management
equipment            rope rescue
                     equipment,                                                                                                                                                                                   Contract Partner
                     barricading

                                                                                                                                                                                                                  Site
List activities in   Workers           EXTREME    5        All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan.                            Management
procedure e.g.       unfamiliar with                       Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to        emergency                             details.                                                                                                                                               Contract
route, isolate       procedures and                                                                                                                                                                               Partners
specific hazard,     processes




                                                                                                                                                    Project Hazard/Risk Assessment / Page 156 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.