STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 398, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
pedestrian
traffic routes
19.25 Tower Crane Rescue
Planning Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, Management
hazard
identification, HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
resourcing, and Management
implementation
of controls
Site
Emergency EXTREME 5 For all emergency response & retrieval plans utilising the crane all workers involved must be inducted into the content of the Management
response Emergency Response Plan (ie jump form retrieval, use of man box etc.)
process Contract Partner
Assess if any workers are trapped or injured and only respond if safe to do so. Contact Emergency Services Site
HIGH 5 Management
Only trained and competent person to perform rescue.
Contract Partner
Site
HIGH 4 Only licensed and competent workers with high-risk license to perform rescue Management
Contract Partner
Site
Use of specific Harness and HIGH 5 Equipment to be maintained and serviced, tagged 6 monthly Management
equipment rope rescue
equipment, Contract Partner
barricading
Site
List activities in Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Management
procedure e.g. unfamiliar with Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact
Evacuation to emergency details. Contract
route, isolate procedures and Partners
specific hazard, processes
Project Hazard/Risk Assessment / Page 156 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.