Original PDF page 400, section 1. The text section number identifies this passage in the reader.
Residual
Proposed Controls Responsible
Rating
Initial
Risk
Risk
HC
Activity Hazard Person
(1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)
prevent spread
of contaminants Workers EXTREME 5 All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan. Site
where possible unaware of Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact Management
hazard details.
Workers not EXTREME 5 All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency Site
familiar with assembly point and pedestrian routes. Management
location of
assembly
point/s or
pedestrian
traffic routes
19.27 Wet Weather and Flooding
Planning Activity HIGH 5 Woollam Emergency Control Organisation established. Each member shall complete the applicable training modules in ELMO. Site
planning, Management
hazard
identification, HIGH 5 Project specific Emergency Preparedness and Response Plan completed prior to work commencing on the project. Site
resourcing, and Management
implementation
of controls
Site
Failure to HIGH 5 Monitor current forecasts and warnings issued by Bureau of Meteorology consulting all workers in Daily Pre-Start Meetings Management
monitor
weather Contract
forecast during Partners
cyclone/ storm
season
Erosion and Sediment Control Plan (ESCP) to be designed by suitably qualified person. Site
Environmental HIGH 5 Management
Harm from Installation and maintenance of ESCP devices as per plan to be implemented and monitored as per instruction from suitably qualified
sediment in person. Contract
waterways Partners
Complete regular inspections on sediment and erosion plan and in consultation with the plan owner to adjust the sediment and
erosion controls as the site changes or an extreme weather event is forecast.
Project Hazard/Risk Assessment / Page 158 of 160
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.