Skip to the record
For the highest quality transcripts.

Council archive · source document

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125

of 492

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 402, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                  Residual
                                                                                                                 Proposed Controls                                                                            Responsible




                                     Rating
                                     Initial
                                      Risk




                                                                                                                                                                                                    Risk
                                                   HC
    Activity           Hazard                                                                                                                                                                                   Person
                                                                                      (1/Elimination 2/Substitution 3/Isolation 4/Engineering 5/Administration 6/PPE)


route, isolate     procedures and
specific hazard,   processes
prevent spread
of contaminants    Workers          EXTREME    5        All inducted personnel on the project shall be introduced to the project specific Emergency Preparedness and Response Plan.                           Site
where possible     unaware of                           Workers shall be informed of the Emergency Control Organisation team members and the location of displayed emergency contact                         Management
                   hazard                               details.

                   Workers not      EXTREME    5        All inducted personnel shall be informed of the emergency evacuation procedure and processes including location of emergency                          Site
                   familiar with                        assembly point and pedestrian routes.                                                                                                                Management
                   location of
                   assembly
                   point/s or
                   pedestrian
                   traffic routes




                                                                                                                                               Project Hazard/Risk Assessment / Page 160 of 160

Used in these records

About this file

File size
58.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdf · 58.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.