Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 416, section 1. The text section number identifies this passage in the reader.
3. IMPLEMENTATION
3.1 RESOURCES – HUMAN, PHYSICAL AND FINANCIAL
Woollam management shall ensure, where necessary, that adequate resources are available, such as to maintain a high level
of Work health and safety standards and ensure that risk is managed at an acceptable level.
3.2 INTEGRATION
Woollam aims to benefit from the integration of the Work Health and Safety Management System in other Management
Systems, such as:
• Training and Development
• Communication and Reporting
• Resource Allocation
• Quality Assurance
• Design and ECI
3.3 ORGANISATIONAL CHART
Project related reporting routes within the company are as illustrated and associated responsibilities are detailed in section
3.4:
OHS Management Manual / 14/02/2024 / Page 12 Approved by - HSEQT Manager
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.