Council archive · source document
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads · OPW24/0125
Very large file (58.9 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 66, section 1. The text section number identifies this passage in the reader.
Document Set ID: 22512401 Version: 1, Version Date: 21/07/2023 [OCR of page images] This Deed is conditional upon the approval of the owner's request for a minor change in respect of the development on the Subject Site. 3. INFRASTRUCTURE CONTRIBUTION 3.1 Infrastructure Agreement overrides Development Permit This Deed applies to the extent of any inconsistency with any development permit and the Infrastructure Contribution payable hereunder is in additionto any conditions of, or payments required by, any development permit and/or any infrastructure charges notice given in respect of the development. 3.2 Infrastructure Contribution On and from satisfaction of clause 2.4, but only while the aged care facility is being operated on the Subject Site, the owner must at its cost: (i) construct the access track and causeway crossings / stormwater discharge points upgrades on the Council Land generally in accordance with drawings General Arrangement Plan STP220347 C102 A dated Jan 2023, Stormwater Layout STP22-0347 SKO1 dated 21.03.23, Earthworks / Track Layout STP22-0347 SKO3 dated 23.03.23, Causeway Crossing 1 STP22-0347 SKO5 dated 03.05.23, and Causeway Crossing 2 STP22-0347 SKO6 dated 03.05.23 prepared by STP Consultants; (ii) maintain the access track and causeway crossings / stormwater discharge points on the Council Land a minimum of: (A) Fire trail (including the track, causeway crossings and stormwater discharge); every 3 months (B) Fuel Reduction Zone (FRZ): every 3 years (C) Slashing/mowing: every 3 months (iii) maintain the vegetation buffer zone along the north-eastern and south- eastern boundary of the Subject Site on the Council Land, refer to RM2022/09056 dated 7 June 2022 and see also RM2020/53583 dated 7 October 2020: (A) north-eastern boundary: maximum total width of 20m comprising 15m as a fire access trail / fuel free zone width and 5m fuel reduction zone width; (B) south-eastern boundary: maximum total width of 15m comprising a 15m fuel free zone width. (iv) obtain the necessary owners’ consent and subsequent approvals (e.g. Operational Works) prior to accessing and undertaking works on the Council Land. (v) prepare a Maintenance Plan and Construction Management Plan for the works being undertaken on the Council Land to be approved by Council prior to the commencement of works. 7 of 12 Document Set ID: 22512401 Version: 1, Version Date: 21/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads.pdfRelated documentApplication case desk ↗
About this file
- File size
- 58.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.