INTEGRATED PLANNING ACT 1997

Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the IP Regulation. -

Unless you answered “none of the above’, the
application requires referral to the Environmental
Protection Agency as a concurrence agency.

IDAS Assessment Checklist, Version 18.0, 10 November 2006

25. The application involves: {tick the applicable box/es)—

Ci (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in —

(J (a) clearing of native vegetation over an area greater than 2500m?;

( (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2,

C1 (c)_ an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?;

(0 (ed) extracting gravel, rock or sand from an area greater than 5000m2,

(1 (e) excavating or filling an area greater than 5000m?;

CJ (f} additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and Ga.m. on the following day.

0 (i) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -

(J (a) an increased number of lots;
(CD (b) clearing of native vegetation over an area greater than 2500m?.

C1 (ii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.

C1 (iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use.
mentioned in (i) or reconfiguring a lot mentioned in {ii} above) that is not for a domestic activity
and wilt result in —

C1 (a) clearing of native vegetation over an area greater than 2500m?,
( (b) extracting gravel,-rock or sand from-an area greater than 5000m2;
wh (1 (c)_ excavating or filling an area greater than 5000m2.
(Vv

) none of the above.

 

Referral coordination

An information request requires referral coordination
if the application involves -
(i) 3 ormore concurrence agencies; or
(ii) a facility or area assessabte under a
planning scheme and prescribed in
schedule? or 8 of the (P Requtation; or
{iii) development which is subject to an
application for preliminary approval
mentioned in s3.1.6 of the IPA.

For more information go to Guide? and Guide 6.

26. Does the application trigger referral coordination?

NO
(1 YES, as the application: (tick the applicable box/es)
(i) triggers 3 or more concurrence agencies;

C1 (ii) _ involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;

C1 (iii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a fot, in an area prescribed in schedule 8 of the IP Regulation; -

O (iv) _ is fora preliminary approval mentioned in $3.1.6 of the IPA

 

Referral agency responses prior to
lodgement

Under s3.3.2 of IPA a referral agency may give a
teferral agency response on a matter within its
jurisdiction about a proposal before an application
for the proposal is made to [he assessment
manager.

This is commonly the case where an application
fequires referral to a building referral agency (eg.
Old Fire and Rescue Service).

 

27. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the

application was made to the assessment manager?

DNo

yes - altach a copy of the referral agency/s response/s

 

PLEASE NOTE:

The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checkiist (if applicable).

OFFICE USE ONLY (applicable fo assessment manager)

 

| _DATERECEIVED |

[REFERENCE NUMBERIS |

 

Page 9

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published].pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.