INTEGRATED PLANNING ACT 1997 (IPA)
_ Details of the application
Advice for completina OB
‘This Inforrration shoud be provided in sucha
* way as to best convey the inforration (Le. this
Tay involve either or both plan view and
elevation).
Advice for completing G9
An approval is required for taking quarry meteial
- (e.g. stone, gravel, sand, rock, clay, mud, silt or
‘Scil) that Is the property of the State. Refer to the
* EPA Qideline Allocation of quarry meterial on
the EPA Website
Advice for completing Q10
Hf the works are proposed within a canal, the
* EPAis not a concurrence agency for the wars:
‘and the application dees not require evidence of
resource entitlement and does nat require
nOtification under the Native Title Act 1993.
_ Note: Abutting?means having a carmen .
{ bountkry or ede; touching.

 

Part P, Version 1.1, 27 Merch 2006

Confirm, by ticking the applicable box(es), that the following details are provided in plans

supporting this application:

® "the location and dimensions of the proposéd tidal works in relation to the fol/s abutting
the proposed works and the tidal land on which the works are proposed to be. -
constructed;

(i) allother structures on the water frontage and within 20 metres of the proposed works;

JX1 ii) the current location of Lowest Astronorrical Tide (LAT), Highest Astronomical Tide
(HAT), and Mean High Water Spring (MHWS);

Bx] (iv) the slope angles of the beds and banks of the tidal area;

$<T(v) the structural components of the proposed works /

LO Wi) the engineering design standards of the proposed works;

RL (vi) the physical appearance of the structure inducing the materials used to construct the
work and the proposed colour of the wor

C1 Will) the engineering design specifications of the proposed works including references to the
relevant Australian Standards;

xT (ix) the finished levels of the proposed works;

(1 (x) details of the largest vessel to be moored at the structure;

 (X) if dredging or excavation is required, the volume and type of material to be removed
and the disposal area for the material being removed.

 

 

 

 

 

 

 

 

 

 

 

 

 

applicable)

Prior to issuing a developrnent permit for the
warks, the assessment manager is'required by
law to ®ight?an approved form, issued by

~ Cleave, which signifies that the PLSL levy under

the Bufiding and Construction industry
Long Service Leave) Act 1991 has been paid._|
3 For further information refer to
hito:/iwww.qleave.qid.gov.au

I"

M4

 

 

x

9. For works involving the removal of quarry material below high water mark, provide details of the
resource allocation permit nurrber. (ie. sand ar gravel removed and placed above mean high weter spring ticle)
10. 's the application within a canal as defined in the Coastal Protection and Management Act 1995?
BxTNo
0 Yes
Certification by a Registered 11. Have the design and safety provisions stated in the Prescribed Tidal Wark Code contained in the ‘
‘Professional Engineer Coastal Protection and Management Regulation 2003 been certified by a Registered
A Registered Profession Engineer of Professional Engineer of Queensland (RPEQ), or interstate equivalent?
Queensland (RPEQ), or the interstate equivalent
can certify that the proposed works comply with 0 No
_ Paces ant safety provers the DX YES 2 provice the deta below .
Note: The provision ofthe certification may Narre of RPEQor equivalent (in fur) LA. Dyes ons
rechoe he eppicatie application fee ere Contact meiling address 0-2. Aon FU GOD wast me CC hmaVth.
» regerting the applicatle fee Contact telephone'facsirrile nurber OF S56G CSCW’ UE
RPEQNO. or equivdert (PEA 2st
This is to certify that each plan, lodged in suppart of this application, has been aparopriately certified by
the above mentioned Registered Professional Engineer of Queensland (RPEQ), or interstate equivalent.
Portable Long Service Leave levy (if | 12. Is payrnent of a Portable Long Service Leave (PLSL) levy applicable to the proposal?

[INO 27013 148 15 conc apy

a development permit can be given for the works

 

[$_gh0

Receipt number
[A426 464

PLEASE NOTE

 

PART P of this form cannot be accepted by the assessment manager unless accompanied by PART A of the form. The assessment manager may refuse
to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1.

 

OFFICE: USE ONLY (arnicatie to asosorert merece)

 

 

DATE RECEIVED ||

 

 

COST CODE

REFERENCE NUVBER'S j
(oplicable fo EPA only

 

 

 

 

 

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0198 - Op Works - Prescribed Tidal Work - Retaining Wall [As Published].pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.