Original source · versioned page text
Approved Plans OPW21-0250
The original of this document is very large (19.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn‘SLOPE TO PREVENT PONDING AT FRONT OF WALL ALL WALLS OVER 1.0m TO HAVE TEMPORARY SAFETY. ‘SURCHARGE TO BE LIMITED TO PEDESTRIAN TRAFFIC WITHIN 'H’ DISTANCE FROM BACK OF WALL 5° MAX, SLOPE TO PREVENT PONDING BEHIND WALL, ‘SLOPE NOT TO BE INCREASED UNLESS OTF 5 i GEOFABRIC TO 8E FOLDED OVER GRANULAR BACKFILL z| |___— PROVIDE 75mm-150mm NOM. NO FINES CRUSHED ROCK TO REAR eS Cal 3 iS} 7 CI _\ | BROUGHT TO SURFACE AT HIGHEST END AND CAPPED OFF. 05 eH" MIN STIFF TO HARD CLAY OR MEDIUM DENSE SANDS. MINIMUM SAFE BEARING CAPACITY AT BASE TO BE 100 KPa OR 150KP2 WHERE WALLS EXCEED 15m HIGH SANDSTONE BOULDER WALL DETAIL 1 NOTES THE SOIL AT THE FRONT BASE OF THE WALL SHALL BE LEVEL, SOUND NATURAL MATERIAL WITH AN ALLOWABLE MINIMUM BEARING CAPACITY OF 100 KPa. ANY ALTERATIONS OR EXCAVATIONS TO THE GROUND LEVELS IN FRONT OF WALL TO BE VERIFIED BY THE ENGINEER PRIOR TO ENSURE THE WORKS WILL NOT AFFECT THE WALL STABILITY. DESIGN BASED ON A RETAINED AND FOUNDATION SOIL INTERNAL FRICTION OF 25° MINIMUM, A BULK DENSITY OF S9KN/m?, A Ka OF 0.41 [S* RETAINED SLOPE) AND A K, OF 2.43 3. ALL STONE TO GE DENSE UNCRACKED ‘A’ GRADE OR ‘8’ GRADE SAW CUT SANDSTONE ROCK (S00mnW x 500mm H x 1500mm L MINJAPPROVED BY THE ENGINEER. ALTERNATIVE ROCK GRADES MAY BE SUBMITTED TO THE ENGINEER FOR APPROVAL. 4. NOLARGE VOLUMES OF WATER TO BE PERMITTED TO POND AT ANY LOCATION BEHIND THE WALL 5. TRENCH SPOIL IS NOT TO BE USED TO FILL SERVICE TRENCHES UNDER WALLS. TRENCHES TO BE FILLED TO SURFACE WITH MINIMUM CBR 15 GRAVEL OR MATERIAL AS DIRECTED. 6 FOOTINGS EXCAVATION TO BE INSPECTED AND APPROVED PRIOR TO WALL CONSTRUCTION, 7. GEOTECHNICAL TESTING - BORELOG SPACINGS TO BE TAKEN AT 20m MAX. SPACINGS AND WHERE WALL TERMINATIONS, om 8 DYNAMIC CONE PENETROMETER TESTING IN ACCORDANCE WITH AS1289-6.3.2 5. FOUNDING MATERIAL FOR WALLS Hem TO BE 100kP MINIMUM AND 150kP2 WHERE WALLS EXCEED H-15m 10, GEOTECHNICAL ADVICE TO BE REQUESTED WHERE GLOBAL STABILITY ANALYSIS, SETTLEMENT ISSUES OR SITE CONDITIONS DIFFER FROM THOSE SHOWN IN THE DESIGN. 11, PROVIDE TEMPORARY BARRIER SAFETY FENCE TO TOP OF WALLS OVER 1.0m IN HEIGHT 12. MEASUREMENTS ON CALCULATION SPREADSHEETS PROVIDED TO TAKE PRECEDENCE OVER VALUES SHOWN ON PLAN. OPW21/0250 21 JAN 2022 crs wR caer NORTH PONT [ome MAX WATTERSON +ASSOCIATES VANTRALIA PTY LTD RETAINING WALL DETAIL xray ang | 8 160-001 GHEGKED POEL Suey anno (ES) Engin pre ere. 2 PEARSONS ROAD sate “679 COOROY QLD 4563 une [160-001-211 [reusion] B [At
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.