Council archive · source document
08/0749 - Represenatations on Decision Notice conditions [As Published] · 142008.749
AS enon Amendment All disturbed and exposed areas of the dam 3 area are to be suitably Myon , ™ Y. . i ‘ Eh eas . ] stabilised by the planting of local native species, at separation distances of Sm between stems, within 20 metres of the full ponded : level of the southern dam on the lot, excluding 3 metre wide access ~ tracks "and dam walls. The plantings are not to affect the structural. . : "integrity, of the dam: a : ' . Justification The separation distance stipulated in the amendment td Condition 4 is . ca aS ty Sor ay age er s. in agreement with the Noosa Plan Planning Scheme Policy 3--: Landscaping Plants and Guidelines, and more importantly in, " 7, accordance with the clustering and amenity of the natural vegetation : species that surround the Dam 3 area as: shown in appendix 1.0. In addition, giver the succession of existing revegetation after24 0 . months, planting further species at spacings of 1m — as stipulated in i ‘the original conditions — is unwarranted and will result in excessive competition between plants, and may ultimately lead to the failure of - «» the areas rehabilitation. +. Amendment Sediment and erosion control measures shall be placed onsitein , accordance with current “best practice” guidelines (the Manual for Erosion and Sediment Control version 1.2 prepared by the Sunshine Coast Regional Council) during all operational works and maintained on site until the area has been suitably stabilised by the planting of local native species, turfing or grass seeding. ke Justification All areas disturbed by operational works of the Dam 1, 2 & 3 areas aga “4 oe . Justification The $2,000 bond stipulated in the original conditions is an excessive have been revegetated by tree planting and grass seeding, which has since matured and suitably stabilised the area as evidenced in appendicis 1.0 and 2.0. These areas have maintained full structural 24 integrity over four years of varying climatic conditions, including : through periods. of heavy rainfall, testament to the success of the ‘revegetation in stabilising the areas. eT F ‘Amendment ; A compliance bond of $250 is to be submitted to Council to ensure be 1 ib n a J , : ar that all conditions. of this approval are met. The bond monies shall be retained by Council for a period of 12 months or until all disturbed areas have undergone revegetation or are otherwise stabilised to the satisfaction of the Council’s Chief Executive Office. Such bond must be lodged by, and shall only be accepted from the Developer for the . works, ‘ financial burden given the timeframe for which it is to be detained and in consideration of the fact that revegetation has already been undertaken and successfully stabilised the area with native grass and tree species (refer to appendix 1.0 and 2.0). Whilst faster growing species have thrived, numerous slower growing species are currently establishing themselves in the area and additional revegetation efforts. are not considered necessary.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0749 - Represenatations on Decision Notice conditions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.