Results - Existing Scenario (E01)
The TUFLOW hydraulic model been assessed for a range of flood events including the 63.2%,
39%, 10% and 1% AEP storm events. The assessment has considered a range of storm
durations to ensure that the critical storm is defined. The results of the hydraulic assessment
are presented as a series of flood maps to illustrate the flooding characteristics of the
overland flow path and the resulting flood behaviours including flooded depth, height,
velocities, hazard and afflux.
The flood maps are presented in Appendix D and Appendix G.
4.3.1. Existing Scenario
The existing scenario flood maps are shown in Appendix D. This details the existing flood
extent and behaviour in relation to the development site. The results of this have been used
as the basis for assessing the potential impacts that may result from the development.
4.3.2. Proposed Scenario
The proposed scenario flood maps are shown in Appendix E. This details the proposed flood
extent and behaviour in relation to the development site. An indicative lot plan is overlaid on
this map set to highlight how the development relates to the flood plain.
It is noted that the building envelopes of Lot 1 and 4 have been filled to achieve flood
immunity requirements, will some minor shaping of the land beside the Lot 1 building
envelope to manage afflux cause by flooding backing up behind the building envelope.
4.3.2.1. Peak Discharge
The assessment found the peak discharge at the site boundary are predicted to decrease
across all modelled events. This is shown in Table 4-3 which compares the Existing and
Proposed peak discharge at the site boundary for each event. As such it is considered that
a formal detention is not required to service this development as the design has achieved
the required non-worsening outcome.
Table 4-3: Existing and Proposed Peak discharge at the Site Boundary.
Design Critical Duration Existing Peak Proposed Peak Difference (m3/s)
Event (AEP) (min) / Temporal Discharge (m3/s) Discharge (m3/s)
Pattern
1% (2100) 120 (TP3) 48.36 48.19 -0.18
1% 120 (TP6) 36.85 35.78 -1.07
10% 180 (TP8) 20.94 20.20 -0.74
39% 540 (TP5) 9.23 9.17 -0.07
63.2% 540 (TP5) 6.19 6.16 -0.02
4.3.2.2. Afflux
Afflux mapping has been undertaken for the 63.2%, 39%, 10% and 1% AEP to identify whether
there are any impacts resulting, and if so, whether an alternative development arrangement
needs to be investigated. Afflux maps have been provided in Appendix F.
The afflux mapping shows that there are no external impacts resulting to any adjoining
properties as a result of the development. An increase in flood levels of up to 330mm is
21-0288-FS001-V1 | Flood Investigation | 60 Glenridge Drive, Cooroibah |9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.