Author	Development Planner, Wilhelm Koschade
Development Assessment
APPLICATION DETAILS
Application No.	MCU18/0003
Applicant	Timothy James McGary
Proposal	Material Change of Use - Multiple Housing - Type 2 Duplex
Properly Made Date	12/01/2018
Information Request Date	29/01/2018
Information Response Date	28/02/2018
Decision Due Date	20/04/2018
Report Completed Date	06/03/2018
Number of Submissions	Not Applicable

PROPERTY DETAILS
Property Address	20 Nannygai St Noosaville Qld 4566
RP Description	Lot 36 RP 63879
Land Area	809 Square Metres
Existing Use of Land	Detached Dwelling

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Locality	Noosaville Locality
Zone	Semi Attached
Overlays	Natural Hazards Overlay (Flood Hazard & Acid Sulfate Soils)
Assessment Type	Code
PROPOSAL
The application seeks approval for a Material Change of Use for Multiple Housing Type 2 - Duplex for 2 x 4 bedroom dwelling units. Each dwelling unit has a similar internal configuration including 4 bedrooms upstairs and living areas downstairs. Each dwelling includes double garage and pool/recreational areas to the rear. The external appearance of each dwelling unit is however different through the incorporation of an alternative roof form, building material and varying finishes.
A locality and proposal plans are provided below.

Site Description
The subject site comprises a rectangular parcel of land located at 20 Nannygai Street Noosaville and described as Lot 36 on RP63879. The site is relatively level and has an existing dwelling located to the front of the site and a shed to the rear. Amenity landscaping is located along the front of the site with a number of mature trees in the centre.
Surrounding Land Uses
Land uses adjoining comprise of various multiple dwelling developments and a residential dwelling to the west.
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Noosaville Locality Code;
Residential Uses Code;
Engineering Works Code; and
Landscaping Code.
The subject site is located in the Noosaville Locality and is zoned Semi-attached Housing. The proposed use is defined as consistent use and is required to follow a code assessable application process.
The application has been found to generally comply with all applicable statutory instruments. The pertinent issues arising out of the assessment are discussed below:
Criteria	Planning Scheme	Proposal	Complies
Population density	8.08	6.6 persons	
Plot ratio	364m² max	359m² max	
Site cover	40% max	39.7%	
Landscaped open space Soft landscaping Landscaping Setbacks	264m² min min 60% of total	332m² >60m²	
Building height storeys metres	2 storeys max 8 metres	2 storeys 8.15 metres	X
Boundary setbacks Frontage Side (south) Side (north) Rear	6 metres min 1.5 & 2.0 metres min 1.5 & 2.0 metres min 6 metres min	7.4 metres 2.0/2.0/3.0 metres 2.1/2.1/2.1 metres 7 metres	X
Length of wall	15 metres max	9.6 metres	
Carparking	2 covered min 1 uncovered min	4 covered	
Roof Form	5 degree roof pitch Eaves to 75% min	7 degrees Eaves >75%	
setback
The application seeks approval for a minor setback encroachment to the northern side boundary where a setback of 2.5m is required for the dwelling exceeding a vertical height of 7.5m. The diagram below details the extent of the encroachment in blue which is limited to the eave of the dwelling.
The proposed setback encroachment is considered minor and will not adversely impact on the amenity of the adjoining lot to the north. The building design is well articulated with appropriate mix of materials and finishes and will not present an appearance of excessive bulk. The encroachment is limited to the northern eave and largely comes as a result of the required fill to achieve minimum floor levels.

building height
Probable Solution S8.1 of the Noosaville Locality Code seeks a maximum building height of 8.0m relative to the finished and natural ground level. The maximum height is sought to ensure buildings and structures are low rise and have a visual bulk and architectural scale consistent with structures on adjoining land.
The application seeks approval for a building height of 8.15m in lieu of 8.0m. The extent of the encroachment is limited to the roof form and comes as a direct result of the minimum floor level required in the area. The figure below shows the extent of the encroachment.
The location of the building height encroachments are centrally located on the development along the ridgelines of the roof form. The proposed height will not result in the development visually dominating the street or surrounding spaces. Each dwelling is well articulated with strong design elements to provide visual interest and off set building bulk. The proposed encroachment is unlikely to impact on adjoining lots and raises no concern.

cONSULTATION
Other Referrals
The application was forwarded to the following internal Council officers:
Development Engineer
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No MCU18/0003 for a Material Change of Use - Multiple Housing - Type 2 Duplex situated at 20 Nannygai St Noosaville Qld 4566 and described as Lot 36 RP 63879, it is recommended the application be approved in accordance with the following details for the Decision Notice:
application details
Application No:	MCU18/0003
Street address:	20 Nannygai St Noosaville Qld 4566
Real property description:	Lot 36 RP 63879 No related Land
Planning Scheme:	The Noosa Plan (3 July 2017)
Decision details
Council decided to issue the following type of approval:
Development Permit for Material Change of Use - Multiple Housing - Type 2 Duplex
CURRENCY PERIOD of approval
The currency period for this development approval is 6 years starting the day that this development approval takes effect.
assessment manager conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
-	02	Site Plan, prepared by Mercury Design	12.03.2018
-	02	Ground Floor Plan, prepared by Mercury Design	12.03.2018
-	02	First Floor Plan, prepared by Mercury Design	12.03.2018
-	02	A/B Roof Plan, prepared by Mercury Design	12.03.2018
-	02	A-South Elevation & A/B-West Elevation, prepared by Mercury Design	12.03.2018
-	02	A-North Elevation & A/B-East Elevation, prepared by Mercury Design	12.03.2018
-	02	B-North Elevation & B-South Elevation, prepared by Mercury Design	12.03.2018
Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice.
Building Height
The maximum height of the development must not exceed 8.0 metres above the finished ground level and the natural ground level, except along the ridgeline of Dwelling A where the vertical height must not exceed a RL 9.96 metres and in the south-western corner of Dwelling B where the skillion roof must not exceed RL 9.7m.
Certification must be submitted to Council from a Licensed Surveyor which certifies that the buildings do not exceed the maximum height requirement of this Decision Notice.
Performance Bond
Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Building Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions.
Water & Sewer Connections
An underground connection to reticulated water and sewerage must be provided to the development site in accordance with the standards and requirements of Northern SEQ Distributor–Retailer Authority (Unitywater).
A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater) must be submitted to Council that certifies an underground connection to reticulated water and sewerage has been provided to the development site.
Building Appearance
All air conditioning units or other mechanical equipment must be located at ground level, or otherwise fully enclosed or screened such that they are not visible from the street frontages nor adjoining properties.
All deck and balcony areas above ground floor must not be enclosed by permanent fixtures such as shutters, louvres, glass panelling or the like, except where required to satisfy any privacy condition of this Decision Notice.
Fencing and Walls
Any street fencing must be set back an average of 1 metre from the front property boundary. Any fencing on the front boundary and articulated to provide visual interest by stepping the design at maximum 5m intervals.
The area of land between the fence and the front property boundary must be densely landscaped to screen any fencing from the street.
Clothes Drying Areas
Each dwelling unit must be provided with access to an outdoor clothes line which is screened from public view.
Protection of Privacy
To ensure privacy is protected between adjoining properties, all windows located internally on the northern elevation of proposed Dwelling A and southern of proposed Dwelling B must either:
be fitted with translucent glazing
be fitted with a fixed external screen
Community Management Statement
Any proposed Community Management Statement required for the development pursuant to the Body Corporate and Community Management Act 1997 must be submitted to Council for endorsement at the same time as submission of the Building Format Plan (or similar) to Council for compliance assessment.
ENVIRONMENTAL HEALTH CONDITIONS
Building Demolition/Removal/Relocation
Where the development involves the removal, relocation or demolition of a building, a Waste Management Plan (construction and demolition) shall be submitted and approved by Council’s Environmental Health Officer prior to issue of a development permit for operational works for demolition, removal or relocation of any building other than a shed.
The purpose of the Waste Management Plan is to facilitate the segregation of waste for the effective reuse and recycling of such materials.  Segregated wastes attract significantly reduced disposal fees at the landfill with some items free.  Higher gate fees are charged for mixed waste.
Waste Management Plans (construction and demolition) are required to be submitted in accordance with Planning Scheme Policy 11, Waste Management Plans.
Waste storage areas are to provide for adequate separation of all reusable, recyclable and waste materials. These shall be located so that they are convenient and safe to use.
The Plan shall contain the following information:
The site area for the storage and separation of waste is to be shown on the plan drawings accompanying the application.
A waste management table as indicated below is to be completed showing how waste material is to be segregated - recycled – reused or disposed.
Table – Waste Management Table
MATERIALS ON-SITE	DESTINATION
	Re-use and Recycling	Disposal
Expected waste materials	Estimated volume(m³)	On-site            *specify proposed re-use or on-site recycling methods	Off-site              *specify contractor and recycling outlet	*specify contractor and landfill site or other disposal site
Excavation material				
Green waste				
Bricks				
Concrete				
Timber-please specify				
Plasterboard				
Metals - please specify				
Asbestos				
Other - please specify				
Note * If a demolition contractor is undertaking works, then the Waste Management table is to be completed by the demolition contractor.
Waste Storage
The developer must provide waste storage and disposal facilities in accordance with Planning Scheme Policy 9, Waste Management, including an external imperviously paved area correctly sized for all refuse and recycling containers and suitably screened from public places and neighbouring properties.
Noise
Written certification is required from a suitably qualified person confirming that sound pressure levels from all mechanical plant and equipment comply with the following :
Air-conditioning and Refrigeration
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable =  background + 3dB(A)
Pumps
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the equipment and prior to any occupation of the building.  All equipment should be operating at the same time to test the overall noise level created, with the measurement location at either the residential boundary or outside the most exposed part of an affected building - whichever is the closest to the plant/equipment.
The certification must be submitted to Council, which certifies that operational noise from any fixed plant and equipment complies with the requirements of this Decision Notice.
ENgineering
External Works
Nannygai Street must be upgraded for the length of its frontage to the subject site.  The works must be undertaken in accordance with an Operational Works approval and must include in particular:
construction of a pedestrian footpath in accordance with the conditions of this Decision Notice
removal of the existing property access and reinstatement of the kerb, footpath and verge area to match the balance of the site frontage, including the provision of topsoil and turf where the existing verge is grassed
Site Access and Driveways
A sealed access driveway must be provided from Nannygai Street to all parking and manoeuvring areas of the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular a driveway crossover in accordance with Council’s Standard Drawings RS-049 and RS-050
Car Parking
A minimum of 3 car parking spaces must be provided and marked on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular:
crossfalls and gradients in accordance with Australian Standard AS/NZS2890.1:2004 Parking Facilities
Pedestrian and Bicycle Facilities
Pedestrian and bicycle facilities must be provided for the development.  The works must be undertaken in accordance with an Operational Works approval and must include in particular a 2.0m metre wide footpath within the road verge for the entire length of the site’s frontage to Nannygai Street
Stormwater Drainage
The site must be provided with a stormwater drainage system connecting to a lawful point of discharge.  The works must be undertaken in accordance with an Operational Works approval and be generally in accordance with drawing number 27285-SW1 Revision A prepared by SCG Consulting Engineers and dated 23 February 2018
Electricity and Telecommunication Services
Unless otherwise stipulated by telecommunications legislation at the time of construction, the development must be provided with all necessary conduits, pits and pipes to accommodate the future connection of optic fibre technology telecommunications.
Certification must be submitted to Council from all relevant service providers which certifies that the development has met the requirements of this Decision Notice and all applicable legislation at the time of construction.
Easements
Unless otherwise agreed in writing by the relevant service provider, any public or third party infrastructure located on the subject site must be placed within an easement registered against the title of the property.
All easements must be designed in accordance with the planning scheme and granted at no cost to the Grantee.  Where the Grantee is Council or a service authority, the easement documentation must be in accordance with the Grantee’s standard easement terms.  Draft easement documentation must be submitted to Council for endorsement.
All works must be kept clear of any existing or proposed easements on the subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
All fill and associated batters must be undertaken in accordance with an Operational Works approval, and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
referral agencies
Not applicable.
Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
Equitable Access and Facilities
The plans for the proposed building work have NOT been assessed for compliance with the requirements of the National Construction Code - Building Code of Australia (Volume 1) as they relate to people with disabilities.  Your attention is also directed to the fact that in addition to the requirements of the National Construction Code as they relate to people with disabilities, one or more of the following may impact on the proposed building work:
the Disability Discrimination Act 1992 (Commonwealth);
the Anti-Discrimination Act 1991 (Queensland); and
the Disability (Access to Premises – Buildings) Standards.
Development Compliance Inspection
Prior to the commencement of the use, please contact Council's DA Planning Section to arrange a Development Compliance Inspection.
Infrastructure Charges
This Development Permit will trigger an “Infrastructure Charge Notice” to be issued in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue.
ENVIRONMENTAL HEALTH ADVICE
Building Works
Noise from residential building works shall comply with the following –
Limited to between 6:30am to 6:30pm Monday to Saturday.
All reasonable measures are taken to minimise noise emissions.
Not permitted on Sunday or public holidays.
Measurement of Noise
Measurement of sound pressure levels (adjusted for tonality and impulse) must be in accordance with either: (a) Australian Standard AS1055.1 “Acoustics–Description and measurement of environmental noise – General procedures”, or (b) The relevant “Noise Measurement Manual” as provided by the Department of Environment and Heritage Protection.
A qualified person is considered to be either: (a) a Registered Professional Engineer of Queensland, or (b) an environmental consultant with a minimum of 3 years current experience in the field of acoustics.
Acoustic Advice & Design
It is highly recommended that the developer seek the advice and design input of a qualified acoustic consultant at the plan development stage to ensure the development does not cause a noise nuisance under the Environmental Protection Act 1994.  Attention should be given to the following (but not limited to) :
building design and construction
design, selection and installation of fixed plant and equipment
the location of air conditioning and heating units, refrigeration plant, pumps, mechanical exhausts and plant rooms etc
the use of acoustic enclosures/screens around noisy plant and  equipment
operating times

Environmental Protection
The development should be undertaken in a manner that causes no unlawful environmental nuisance under the Environmental Protection Act 1994 by the creation of excessive noise, lighting, waste, atmospheric pollutants (including dust or odours) or other releases to the environment.
In accordance with the Environmental Protection Act 1994, all sand, silt, mud, paint, cement, concrete, builder’s waste or other prescribed contaminants should not to be released to or be placed where it could reasonably be expected to move into a roadside gutter, storm water drain or a watercourse.  On the spot fines apply for such offences.
ENgineering
Building and Construction Industry (Portable Long Service Leave) Levy
The QLeave levy must be paid prior to the issue of a development permit where it is required. Council will not be able to issue a Decision Notice without receipt of details that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
Additional application fees apply to Operational Work applications where the different aspects of the works are lodged separately. Significant savings in application fees will result if all works are lodged in a single application.
Preparation of a Preliminary Construction Management Plan
A preliminary Construction Management Plan must be submitted with the Operational Works application and must address the following:
appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD)
provision for safe pedestrian access across the frontage of the site both during daily construction and after daily construction has ceased.
it is acknowledged that the preliminary Construction Management Plan will be a draft document requiring finalisation upon appointment of the Principal Contractor employed to construct the works and a final document will be required to be submitted at the Pre-Start Meeting for the project.
Private Infrastructure
All private infrastructure for the development must be designed to meet the planning scheme requirements unless otherwise agreed by the relevant authority
property notes
Not applicable.
VARIATION approval
Not applicable.
further development permits required
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Operational Works	Access, carparking, landscaping, earthworks, stormwater drainage
Development Permit for Building Works	All Building Works
submissions
Not applicable.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
OTHER DETAILS
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.

[word/footer1.xml]
Page 11 of 15

[word/header1.xml]
3

[word/header2.xml]
DEVELOPMENT ASSESSMENT DELEGATED REPORT

[Attachment: image3.png (image text)]
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(G)_AIB-EAST ELEVATION


[Attachment: image4.png (image text)]
 

>

é
4
=~


[Attachment: image6.png (image text)]
 

 

 

 

 

 

 

 

(Northern Boundary

 

nut s

tion] ——

 

 

 

@) A/B-WEST ELEVATION


[Attachment: image7.png (image text)]
nt A
Po

 
Log in to download the original file

Delegated Report - Code - Planning MCU18 0003.docx · 2.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.