Original source · versioned page text
2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Noosa Construction News page (DRAFT)
A draft construction news information product has been developed for the Noosa Shire Council Works In Progress (WIP)
page. Please note that the final product will include relevant dates for the construction period.
Figure 18: DRAFT Project Noosa page ready for the construction phase
34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.