Original source · versioned page text
2022-04-12-P&E Agenda - Item 6 - Attachment 1 - TNC Noosa_Oyster Project _6_Monthly_Report
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Considerable savings have been made under the following budget lines:
- Hatchery and seeding – Bribie Island Research Centre offered TNC and excellent partnership rate for this work.
- Reef integrity and performance assessment - Monitoring in Year 2 will be funded from Reef Builder.
Savings made have been incorporated into the reef building budget to maximize the extent of the reef build.
Contracts
• NorthGroup Pty Ltd – Bathymetric and intertidal surveys at oyster restoration sites ($13,200) – final outputs
submitted. Payment pending.
• Ecological Service Professionals Pty Ltd - Seagrass and habitat mapping contract ($42,592) – outputs submitted.
Final report submitted. Final payment made.
• Integrated Coastal Management Pty Ltd – Engineering advice and RPEQ certifications ($37,290) – outputs
submitted. Final payment made.
• Integrated Coastal Management Pty Ltd – Permitting support (up to $10,000) - ongoing
• Resources Australia Ltd - Oyster shell transport (up to $10,000) - contract ongoing
• Griffith University PhD student sponsorship for Noosa River oyster research ($20,000). Payment made.
Contracts pending (under negotiation)
• Integrated Coastal Management Pty Ltd – Construction engineering oversight and certification
• Ecological Service Professionals Pty Ltd – Restoration monitoring and reporting (Year 1)
• M&J Marine Services Pty Ltd – Reef construction
• Government of Queensland – Bribie Island Research Centre – Oyster seeding
36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.