                                                                                       2005/2200


4.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. These landscape
      plans required to be submitted are to denote areas of existing vegetation or existing trees
      proposed or required to be retained.
5.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the maximum
      allowable building height as required by either the conditions of approval or the Planning
      Scheme.
6.    Security in the form of a cash bond or trading bank guarantee to the sum of $15,000 must be
      submitted, to secure performance of all conditions of this approval, prior to the issue of a
      Development Permit for operational works. The cash bond or trading bank guarantee will be
      returned on performance of the conditions of approval less any costs incurred by Council in
      respect of enforcing performance of this permit.
7.    The requirements of this development approval are to be effected, prior to the use of the
      premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
      this approval to effect compliance with conditions.
8.    The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
9.    The Development Permit for a material change of use of premises lapses if the use has not
      happened by 27 February 2011, unless an application to extend the currency is approved by
      Council.
Building Services
10.   All building materials containing asbestos, including asbestos cement sheeting or roofing and
      lagging, must be removed from the building and disposed of in accordance with industry best
      practice.
11.   Waste generated during construction must be stockpiled in a centralised location and covered
      as required to prevent material being blown onto adjoining properties including the road
      reserve or food waste from generating vermin. All site waste must be disposed of to an
      approved waste disposal facility either directly or via an approved waste receptacle and
      collection service. Storage areas are to be located near the temporary access to the site so
      that access can be gained with out damage to infrastructure.
12.   Sediment and erosion control measures must be placed on site prior to the works
      commencing and shall be maintained until all works are complete. The erosion and sediment
      control measures shall be in accordance with the “Best practice guidelines for control of
      stormwater on building sites” prepared by Healthy Waterways (copy attached or available at
      www.healthywaterways.org <http://www.healthywaterways.org>).
13.   The transportation of all materials to and from the site must be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying out materials either to
      or from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
14.   There is to be no uncontrolled discharge of water onto the slope.
15.   Additional load due to fill, construction equipment or stockpiled materials should not be located
      on the dune slope.


                                                                                     Page 3 of 19

Used in these records

About this file

File size
572 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2005.00002200.003 [As Published].pdf · 572 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.