Council archive · source document
Decision Notice - Change to an Existing Approval - 010.2005.00002200.003 [As Published] · 132005.2200.03
2005/2200
36. Earthworks required on site shall be undertaken without the use of vibratory equipment and in
a manner does not compromise the stability of the site or adversely impact on the stormwater
drainage pattern and be in accordance with the recommendations of the geotechnical
investigation report Project 306-2512 dated December 2006 prepared by Soil Surveys
Engineering.
37. All excavations both temporary and permanent must be adequately retained to prevent the
occurrence of landslip and the retention works shall be carried under direct guidance and
supervision of a geotechnical engineer.
38. Earthworks carried out on site shall not affect the structural integrity of any of the existing
fences, services, road stability or structures that border the development site. Fences that are
affected shall be replaced prior to plan endorsement. In this regard any fences to be replaced
shall be clearly shown on the plans submitted for Operational Works approval.
39. The footings and foundation works shall be founded to a depth recommended by a
geotechnical engineer. Any shallow footings or ground bearing slabs design shall address the
potential of slope movement in detail.
40. Detailed design engineering plans of the foundation and retention works shall be submitted to
Council prior to obtaining the Development Permit for Operational Works. The design plans
shall be certified by a suitably experienced RPEQ.
41. A Geotechnical Engineer or similar qualified expert shall establish whether any measures are
required to protect the stability of adjoining buildings and/or structures, and make
recommendations on the type of foundation system(s) best suited for the proposed
development. This information shall be submitted to the Council for assessment and approval
prior to obtaining a Development Permit for Operational Works.
42. An existing Conditions Survey is to be carried out on adjoining buildings, structures, fences
and landscaping prior to any construction works taking place on site. If distress already exists,
a photographic survey shall be undertaken, the distress measured and a plan to monitor
changes to distress shall be implemented. A copy of this report is to be submitted to Council
within 5 business days of survey and prior to construction work proceeding.
Erosion and Sediment Control
43. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary. Giving the sensitivity of the site the type of
erosion control devices and the manner of their installation shall not compromise the integrity
of the sand dune and the steep slope.
44. In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
45. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
46. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
47. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Page 6 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2005.00002200.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 572 KB (small file)
- File type
No other editions are linked here.