2576 - Civil Drawings (Feb 2026)
Attached to the e-mail Fw_ Email 2 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 2).msg.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
STAGE 5 STAGE 4 STAGE 1
BUILDING DRIVEWAY / PARKING
DESIGN SURFACE
BDY
50mm STEP TYP
FFL 125
0.91m
BDY
BULK EARTHWORKS ASSUMED
300mm BOXING FOR PAVEMENT
EXISTING SURFACE
BOUNDARY RETAINING TO BE ENTIRELY
WITHIN DEVELOPMENT SITE - TO BE
BUILT WITH BUILDING WORKS
SECTION 3 DRIVEWAY
SCALE HOR 1:200 C100 CROSSOVER
SCALE VER 1:40
STAGE 1
BIO RETENTION / DETENTION BASIN BUILDING
BOUNDARY RETAINING TO BE ENTIRELY BULK EARTHWORKS ASSUMED DESIGN SURFACE
WITHIN DEVELOPMENT SITE - TO BE
BDY
300mm BOXING FOR PAVEMENT
BUILT WITH BUILDING WORKS
FFL 124.40
EXISTING
0.91m
BDY
PMT
0.26m
2.60m
2.05m
EXISTING SURFACE
SL 121.15
SECTION 4
p:\2576-18 taylor ct, cooroy\02 design\01 acad\c100-c120 bulk earthworks plan.dwg
SCALE HOR 1:200 C100
SCALE VER 1:40
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DETAILS SCALE APPROVED PROPOSED INDUSTRIAL DEVELOPMENT
A 23.02.26 DRAFT FOR REVIEW GS DTB
Barlow Shelley Pty Ltd
ABN 29 679 702 599
AT 18 TAYLOR COURT, COOROY 2576
DATUM AHD
DESIGN DTB
................. 07 5443 8285 FOR RMD CAPITAL PTY LTD
PO Box 899
DRAWN GS
AS SHOWN Engineer: TIM BURKE Maroochydore 4558 DRAWING TITLE: DRAWING NUMBER REV
[email protected]
DESIGN CHECK TB
(RPEQ 25245)
barlowshelley.com.au
EARTHWORKS TYPICAL SECTIONS (SHEET 2 OF 2) C121 A
DRAWING STATUS
DATE FEB 2026 This drawing is not to be copied or amended without written permission from Barlow Shelley Pty Ltd
FOR APPROVAL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (2576 - Civil Drawings (Feb 2026).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.