Approved Decision Notice - DBW25 0013 (As Published) · DBW25/0013
Currency Period
2. This development approval lapses if the works have not substantially started by 9 April 2027
unless an application to extend the currency period is approved by Council.
Approved Plans
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table below.
Plan No. Rev. Plan/Document Name Date
200 A Proposed Site, prepared by Kelly Martin 12/01/2024
Architecture
201 A Proposed Ground Level, prepared by Kelly 12/01/2024
Martin Architecture
202 A Proposed First Floor, prepared by Kelly 12/01/2024
Martin Architecture
203 A Proposed Roof, prepared by Kelly Martin 12/01/2024
Architecture
300 A Proposed Elevations 1, prepared by Kelly 12/01/2024
Martin Architecture
301 A Proposed Elevations 2, prepared by Kelly 12/01/2024
Martin Architecture
Building Height
4. The maximum height of the development must not exceed 8 metres above the ground level,
including where excavation is undertaken the exposed portion of the external façade of the
building.
Car Parking
5. A minimum of 2 car parking spaces must be provided on site and made available and
accessible at all times for residents.
Environment
6. Sediment or any other material including building materials or waste products must not be
deposited or released into the road reserve, stormwater drain or adjacent properties.
Landscaping Works
7. The development site must be landscaped with soft landscaping. The soft landscaping must
be undertaken in accordance with the Approved Plans.
8. Existing trees on the site must be retained, except where required to be removed to
accommodate the approved dwelling alterations and extension. In this regard, the removal
of vegetation must not extend beyond 3 metres of the building footprint.
9. Existing vegetation in the road reserve must be retained, unless written authorisation from
Council is granted for the clearing.
10. Trees to be retained must be protected from clearing or construction activities by:
a. clearly marking vegetation to be retained with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
Page 2 of 6
Document Set ID: 23683931
Version: 4, Version Date: 11/04/2025