Original source · versioned page text
2019-09-16 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 16 SEPTEMBER 2019
Page 15 of 30
GENERAL COMMITTEE MEETING AGENDA 16 SEPTEMBER 2019
= Peregian Beach Community Association Inc.
} : ' y KY [email protected] - PBCAlorg - P.0.Box 312, Peregian Beach Qld. 4573
9 September 2019
The CEO,
Noosa Shire Council,
PO Box 141 Tewantin Qld 4565
ATT: Ms Kerri Coyle
[email protected]
Dear Ms Coyle,
Thomco (No 2087) Pty Ltd v Noosa Shire Council and PBCAI
P & E Appeal No 4066 of 2017
Pre-Request Response
This letter relates to a request by Thomco to vary an Order by the Planning and
Environment Court made by Consent as recently as 21 June 2019.
BACKGROUND:
The Thomco proposal for the site, now approved, obviously is guided by the aim of
maximising the rate of return and not by resident/visitor amenity. The amenity would
have been improved by fewer dwellings and a smaller Motel, as suggested by
Council and PBCAI, but resisted by Thomco.
Thomco’s priority has always been to build the dwellings for sale, preferably as
permanent accommodation, and the change to visitor accommodation was simply a
means to that end.
The fact that the dwellings are for short-term visitor accommodation is not being
clearly advertised, which may mislead purchasers seeking permanent
accommodation; and the dwelling density and high prices may also be deterring
persons who are contemplating residing here from purchasing.
COMPLIANCE WITH THE NOOSA PLAN:
As you are aware, the Noosa Plan required this land to remain for visitor
accommodation after the closure of the caravan park. The December 2016
application, which resulted in this appeal, was predominantly for permanent
accommodation in both the dwellings and the Motel. The land was also required to
provide low cost accommodation, but that was lost during the DA process.
The December 2016 application was for a Motel consisting of partly permanent and
partly visitor accommodation, which was to be built as Stage 2. The majority of the
land was proposed to be used for 26 dwellings for permanent accommodation.
Page 15 of 30See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.