APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
Author	Coordinator Engineering, Mark Lewis
Development Assessment

APPLICATION DETAILS
Application No.	OPW20/0145.05
Development Approval	Development Permit for Operational Works – Drainage Works, Earthworks, Electrical, Telecommunications, Street Lighting, Landscaping, Roadworks, Traffic Signage, Stormwater and Clearing
Applicant	Stockwell NC P/L TTE
Request Received On	25 February 2022
Report Reviewed By	Amanda Turner
Decision Due Date	25 March 2022

PROPERTY DETAILS
Property Address	Noosa Civic 28 Eenie Creek Rd Noosaville Qld 4566Noosa Civic 28 Eenie Creek Rd Noosaville Qld 4566
RP Description	Lot 3 SP 246584
Land Area	31.7ha
Existing Use of Land	Vacant

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Zone	Innovation, Major Centre and Community Facilities
Precinct	Business Centre Precinct
Local Area Plan	Not applicable
Overlays	Acid Sulfate Soils, Biodiversity, Bushfire, Flood
Assessment Type	Minor Change to Development Approval

PROPOSAL
The applicant seeks approval to change to an existing development approval. The change relates to the proposed stormwater system (within the site and the discharge point) on western boundary adjacent to the southern side of Hofmann Drive
The locality and proposal plan are included below.

Figure 1 – Locality

Figure 2 – Site Plan

background
A development approval for Operational Works – Drainage Works, Earthworks, Electrical, Telecommunications, Street Lighting, Landscaping, Roadworks, Traffic Signage, Stormwater and Clearing has been issued with the most recent revision being issued on 11 January 2022.
During the construction of the civil works it was discovered that the originally approved design levels for the stormwater discharge would be below ground level and/or require extensive works within Covenant J and the drainage easement in the “Reserve” to construct a free flowing outlet. The extent of the required design changes have been discussed a number of times during site inspections and a number of versions have been reviewed. The submitted design achieves the required free flowing stormwater discharge while minimising the extent of clearing and other works.
It is noted that the works will require the removal of a small number of trees located either directly in the works area or directly adjacent. In response to Council’s questions regarding the long term viability of the particular trees the applicant has submitted an arborist report that address the relevant trees. Council’s Senior Environment officer has reviewed the report and provided additional conditions
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017; and
The Noosa Plan 2020.
Statutory Process
The applicant has requested to make a minor change to a development approval under s78 of the Planning Act 2016. An application for a minor change to a development approval can only be made in circumstances where a change would constitute a ‘minor change’.
The proposed change to the development approval requested by the applicant is determined to constitute a minor change
Applicant’s Request
The applicant has requested approval for the amended designs but has not specifically mentioned which conditions. It is expected that changes are required to the approved plans table to reflect the amended design
Assessment of Request
Council has assessed the design changes considers that the amended design achieves the necessary stormwater drainage outcomes while minimising the clearing and impacts on Covenant J and the “Reserve”.
Council’s Senior Environment office has provided additional conditions to rehabilitate the disturbed areas to the fullest extent possible.

It is recommended that Condition 1 be amended to read as follows:
Condition 1
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
EW02	A	Earthworks Notes Prepared by Barlow Shelley	19/02/2020
EW03	A	Earthworks Layout Plan 1 of 8 Prepared by Barlow Shelley	13/09/2019
EW04	A	Earthworks Layout Plan 2 of 8 Prepared by Barlow Shelley	13/09/2019
EW05	A	Earthworks Layout Plan 3 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	13/09/2019
EW06	B	Earthworks Layout Plan 4 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	11/12/2020
EW07	A	Earthworks Layout Plan 5 of 8 Prepared by Barlow Shelley	13/09/2019
EW08	B	Earthworks Layout Plan 6 of 8 Prepared by Barlow Shelley	11/12/2020
EW09	B	Earthworks Layout Plan 7 of 8 Prepared by Barlow Shelley	11/12/2020
EW10	A	Earthworks Layout Plan 8 of 8 Prepared by Barlow Shelley	13/09/2019
R31	E	General Notes Prepared by Barlow Shelley	23/11/2020
R33	E	Overall Works Layout Plan Prepared by Barlow Shelley	23/11/2020
R34	E	Access Management Plan Prepared by Barlow Shelley	23/11/2020
R35	G	Road Works Layout Plan 1 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R36	G	Road Works Layout Plan 2 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R37	F	Road Works Layout Plan 3 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	10/12/2020
R38	E	Road Works Layout Plan 4 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	23/11/2020
R39	G	Road Works Layout Plan 5 of 8 Plan Prepared by Barlow Shelley	14/12/2020
R40	G	Road Works Layout Plan 6 of 8 Plan Prepared by Barlow Shelley	14/12/2020
R41	E	Road Works Layout Plan 7 of 8 Plan Prepared by Barlow Shelley	23/11/2020
R42	E	Road Works Layout Plan 8 of 8 Plan Prepared by Barlow Shelley	23/11/2020
R43	F	Road A Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R44	E	Road A Cross Section Prepared by Barlow Shelley	23/11/2020
R45	F	Road B Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R46	E	Road B Cross Sections (Sheet 1 of 2) Prepared by Barlow Shelley	23/11/2020
R47	E	Road B Cross Sections (Sheet 2 of 2) Prepared by Barlow Shelley	23/1/2020
R48	F	Hofmann Drive Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R49	E	Hofmann Drive Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R50	E	Hofmann Drive Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R51	F	Road C Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R52	E	Road C Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R53	E	Road C Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R54	E	Lot 10-15 Driveway Longitudinal Section Prepared by Barlow Shelley	23/11/2020
R55	E	Lot 10-15 Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R56	E	Lot 10-15 Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R57	E	Walter Hay Drive / Road A Intersection Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	23/11/2020
R58	G	Road A / B / Hofmann Drive / Road C Roundabout Detail Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R59	E	Road B / Hofmann Drive Intersection Prepared by Barlow Shelley	23/11/2020
R60	F	Road C / Noosa Civic Access Road Roundabout Detail Plan Prepared by Barlow Shelley	10/12/2020
R61	E	Lots 23 Driveway Cross Sections Prepared by Barlow Shelley	23/11/2020
R62	E	Lots 23 Driveway Longitudinal Section Prepared by Barlow Shelley	23/11/2020
R63	E	Lots 23 Driveway Cross Sections Prepared by Barlow Shelley	23/11/2020
R64	G	Linemarking Layout Plan 1 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R65	G	Linemarking Layout Plan 2 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021 & 25/3/2022)	14/12/2020
R66	F	Linemarking Layout Plan 3 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
R67	E	Linemarking Layout Plan 4 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	23/11/2020
R68	G	Linemarking Layout Plan 5 of 7 Prepared by Barlow Shelley	14/12/2020
R69	G	Linemarking Layout Plan 6 of 7 Prepared by Barlow Shelley	14/12/2020
R70	E	Linemarking Layout Plan 7 of 7 Prepared by Barlow Shelley	23/11/2020
R71	E	Linemarking Typical Sections Prepared by Barlow Shelley	19/02/2020
SW02	E	Stormwater Notes Prepared by Barlow Shelley	26/11/2020
SW05	F	Stormwater Layout Plan 1 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	10/12/2020
SW06	F	Stormwater Layout Plan 2 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021 & 25/3/2022)	10/12/2020
SW07	F	Stormwater Layout Plan 3 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW08	E	Stormwater Layout Plan 4 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	26/11/2020
SW09	F	Stormwater Layout Plan 5 of 8 Prepared by Barlow Shelley	10/12/2020
SW10	F	Stormwater Layout Plan 6 of 8 Prepared by Barlow Shelley	10/12/2020
SW11	E	Stormwater Layout Plan 7 of 8 Prepared by Barlow Shelley	26/11/2020
SW12	E	Stormwater Layout Plan 8 of 8 Prepared by Barlow Shelley	26/11/2020
SW13	E	Stormwater Longitudinal Section Sheet 1 of 3 Prepared by Barlow Shelley	26/11/2020
SW14	E	Stormwater Longitudinal Section Sheet 2 of 3 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	26/11/2020
SW15	F	Stormwater Longitudinal Section Sheet 3 of 3 Prepared by Barlow Shelley	10/12/2020
SW19	F	Bio-Retention Basin Layout & Detail Plan Sheet 1 of 6 “Road A” Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	10/12/2020
SW20	F	Bio-Retention Basin Layout & Detail Plan Sheet 2 of 6 “Road C” Prepared by Barlow Shelley	10/12/2020
SW21	F	Bio-Retention Basin Layout & Detail Plan Sheet 3 of 6 “Road C” Prepared by Barlow Shelley	10/12/2020
SW22	F	Bio-Retention Basin Layout & Detail Plan Sheet 4 of 6 “Hofmann Drive” Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW23	F	Bio-Retention Basin Layout & Detail Plan Sheet 5 of 6 “Road C” Prepared by Barlow Shelley	14/12/2020
SW24	F	Bio-Retention Basin Layout & Detail Plan Sheet 6 of 6 “Typical Bio Basin” Prepared by Barlow Shelley	10/12/2020
SW25	F	Tree Pit Layout & Detail Plan Sheet 1 of 2 “Road B” Prepared by Barlow Shelley	10/12/2020
SW26	F	Tree Pit Layout & Detail Plan Sheet 2 of 2 “Road C” Prepared by Barlow Shelley	10/12/2020
SW27	E	Stormwater Outlet Detail Plan Sheet 1 of 4 (Structure 1/2 & 1/12) Prepared by Barlow Shelley	26/11/2020
SW28	F	Stormwater Outlet Detail Plan Sheet 2 of 4 (Structure 1/5) Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW29	E	Stormwater Outlet Detail Plan Sheet 3 of 4 (Lot 3) Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	26/11/2020
SW30	E	Stormwater Outlet Detail Plan Sheet 4 of 4 (Structure 1/19) Prepared by Barlow Shelley	26/11/2020
		Bushfire Management Plan  prepared by Queensland Bushfire Planning	December 2020
J23177	2	Arborist report prepared by Arbor Operations	July 2020
	1	Fauna Management Plan prepared by Australia Wide Environmental Consultant	September 2020
1 of 23	H	OVERALL SITE LAYOUT PLAN ED20265 OPW 01 prepared by element design	July 2020
2 of 23	H	SHEET LAYOUT PLAN ED20265 OPW 02 prepared by element design	July 2020
3 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 03 prepared by element design	July 2020
4 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 04 prepared by element design	July 2020
5 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 05 prepared by element design AS AMENDED IN RED by Council.	July 2020
6 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 06 prepared by element design AS AMENDED IN RED by Council	July 2020
7 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 07 prepared by element design	July 2020
8 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 08  prepared by element design	July 2020
9 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 09 prepared by element design	July 2020
10 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 10 prepared by element design	July 2020
11 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 11 prepared by element design	July 2020
12 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 12 prepared by element design	July 2020
13 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 13 prepared by element design	July 2020
14 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 14 prepared by element design	July 2020
15 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 15 prepared by element design	July 2020
16 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 16 prepared by element design	July 2020
17 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 17 prepared by element design	July 2020
18 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 18 prepared by element design	July 2020
19 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 19 prepared by element design	July 2020
20 of 23	H	BIO RETENTION BASIN PLAN ED20265 OPW 20 prepared by element design	July 2020
21 of 23	H	DETAILS PLAN OPW 21 prepared by element design	July 2020
22 of 23	H	PLANT SCHEDULE PLAN ED20265 OPW 22 prepared by element design AS AMENDED IN RED by Council.	July 2020
23 of 23	H	10m WIDE BUFFER & SPECIFICATION ED20265 OPW 1 prepared by element design	July 2020
STG-M000053677 Sheet 1 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 2 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 3 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 4 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 5 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
S1301229 Sheet 1 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 2 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 3 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 4 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 5 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 6 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 7 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 8 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 9 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
10651CSP Page 1	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 2	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 3	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 4	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 5	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 6	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 7	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
Additional Plans November 2021			
20-000713-410	B	Road C Amendments Layout Plan prepared by Calibre	20/10/2021
20-000713-416	B	Road C Additional Drainage Catchment Plans prepared by Calibre	20/10/2021
Additional Plans 26 November 2021			
20-000713-450		Road A Amendments Intersection Layout Plan prepared by Calibre	17/11/2021
20-000713-451	A	Road A Bio-Pods Layout Plan prepared by Calibre	17/11/2021
20-000713-452		Road A Amendments Intersection Layout Plan prepared by Calibre	Undated
ED 20265 OPW 01	C	Proposed Future Transit – Sheet Layout Plan prepared by Element Design	16/11/2021
ED 20265 OPW 02	C	Proposed Future Transit – Streetscape Planting Plan prepared by Element Design	16/11/2021
ED 20265 OPW 03	C	Proposed Future Transit – Details Plan prepared by Element Design	16/11/2021
ED 20265 OPW 04	C	Proposed Future Transit – Plant Schedule Plan prepared by Element Design	16/11/2021
ED 20265 OPW 05	C	Proposed Future Transit – Specification prepared by Element Design	16/11/2021
Additional Plans 25 March 2022			
20-000713-620	B	Stormwater Amendments New Line 5 Outlet Detail Plan prepared by Calibre	17/12/2021
20-000713-621	A	Stormwater Amendments New Line 5 Longitudinal Sections prepared by Calibre	14/12/2021
20-000713-623		Stormwater Amendments New Line 5 Outlet Amended Biopod Details prepared by Calibre	16/12/2021

Assessment of Request
As a result of the design changes the removal of a small number of trees is required. It is recommended that the following additional conditions be included:

Vegetation removal required for the pipe and headwall works and the swale drain works must occur in accordance with the approved Arborist Report (no. J28316 dated March 2022).
Trees to be removed are required to be offset at a ratio of 2:1 with final planting locations to be determined on site in accordance with Council’s delegate.
Offset replacement planting species must be a mix of species removed during the approved works including; Eucalyptus resinifera (Red Mahogany), Syncarpia glomulifera subsp. glomulifera (Turpentine), Corymbia intermedia (Pink Bloodwood), Eucalyptus robusta (Swamp Mahogany), Melaleuca quinquenervia (Broadleaf Paperbark) and Eucalyptus grandis (Flooded Gum) or other species approved by Council.
cONSULTATION
Referral Agencies
Not applicable
Internal Council Referrals
The application was forwarded to the following internal Council officers for review and/or comment:
Senior Environment Officer
conclusion & reasons for decision
The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval.
The report is provided in accordance with Section 63(5) of the Planning Act 2016.
RECOMMENDATION
With regard to Application No. OPW20/0145.05 , to make a minor change to an existing approval for Operational Works – Drainage Works, Earthworks, Electrical, Telecommunications, Street Lighting, Landscaping, Roadworks, Traffic Signage, Stormwater and Clearing situated at Noosa Civic 28 Eenie Creek Rd Noosaville Qld 4566 described as Lot 3 SP 246584, Council on 24 March 2022 decided to:
A.	Approve the change.
B.	Amend condition 1 to read as follows:
Plan No.	Rev.	Plan/Document Name	Date
EW02	A	Earthworks Notes Prepared by Barlow Shelley	19/02/2020
EW03	A	Earthworks Layout Plan 1 of 8 Prepared by Barlow Shelley	13/09/2019
EW04	A	Earthworks Layout Plan 2 of 8 Prepared by Barlow Shelley	13/09/2019
EW05	A	Earthworks Layout Plan 3 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	13/09/2019
EW06	B	Earthworks Layout Plan 4 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	11/12/2020
EW07	A	Earthworks Layout Plan 5 of 8 Prepared by Barlow Shelley	13/09/2019
EW08	B	Earthworks Layout Plan 6 of 8 Prepared by Barlow Shelley	11/12/2020
EW09	B	Earthworks Layout Plan 7 of 8 Prepared by Barlow Shelley	11/12/2020
EW10	A	Earthworks Layout Plan 8 of 8 Prepared by Barlow Shelley	13/09/2019
R31	E	General Notes Prepared by Barlow Shelley	23/11/2020
R33	E	Overall Works Layout Plan Prepared by Barlow Shelley	23/11/2020
R34	E	Access Management Plan Prepared by Barlow Shelley	23/11/2020
R35	G	Road Works Layout Plan 1 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R36	G	Road Works Layout Plan 2 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R37	F	Road Works Layout Plan 3 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	10/12/2020
R38	E	Road Works Layout Plan 4 of 8 Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	23/11/2020
R39	G	Road Works Layout Plan 5 of 8 Plan Prepared by Barlow Shelley	14/12/2020
R40	G	Road Works Layout Plan 6 of 8 Plan Prepared by Barlow Shelley	14/12/2020
R41	E	Road Works Layout Plan 7 of 8 Plan Prepared by Barlow Shelley	23/11/2020
R42	E	Road Works Layout Plan 8 of 8 Plan Prepared by Barlow Shelley	23/11/2020
R43	F	Road A Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R44	E	Road A Cross Section Prepared by Barlow Shelley	23/11/2020
R45	F	Road B Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R46	E	Road B Cross Sections (Sheet 1 of 2) Prepared by Barlow Shelley	23/11/2020
R47	E	Road B Cross Sections (Sheet 2 of 2) Prepared by Barlow Shelley	23/1/2020
R48	F	Hofmann Drive Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R49	E	Hofmann Drive Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R50	E	Hofmann Drive Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R51	F	Road C Longitudinal Section Prepared by Barlow Shelley	14/12/2020
R52	E	Road C Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R53	E	Road C Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R54	E	Lot 10-15 Driveway Longitudinal Section Prepared by Barlow Shelley	23/11/2020
R55	E	Lot 10-15 Cross Sections Sheet 1 of 2 Prepared by Barlow Shelley	23/11/2020
R56	E	Lot 10-15 Cross Sections Sheet 2 of 2 Prepared by Barlow Shelley	23/11/2020
R57	E	Walter Hay Drive / Road A Intersection Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	23/11/2020
R58	G	Road A / B / Hofmann Drive / Road C Roundabout Detail Plan Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R59	E	Road B / Hofmann Drive Intersection Prepared by Barlow Shelley	23/11/2020
R60	F	Road C / Noosa Civic Access Road Roundabout Detail Plan Prepared by Barlow Shelley	10/12/2020
R61	E	Lots 23 Driveway Cross Sections Prepared by Barlow Shelley	23/11/2020
R62	E	Lots 23 Driveway Longitudinal Section Prepared by Barlow Shelley	23/11/2020
R63	E	Lots 23 Driveway Cross Sections Prepared by Barlow Shelley	23/11/2020
R64	G	Linemarking Layout Plan 1 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	14/12/2020
R65	G	Linemarking Layout Plan 2 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021 & 25/3/2022)	14/12/2020
R66	F	Linemarking Layout Plan 3 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
R67	E	Linemarking Layout Plan 4 of 7 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	23/11/2020
R68	G	Linemarking Layout Plan 5 of 7 Prepared by Barlow Shelley	14/12/2020
R69	G	Linemarking Layout Plan 6 of 7 Prepared by Barlow Shelley	14/12/2020
R70	E	Linemarking Layout Plan 7 of 7 Prepared by Barlow Shelley	23/11/2020
R71	E	Linemarking Typical Sections Prepared by Barlow Shelley	19/02/2020
SW02	E	Stormwater Notes Prepared by Barlow Shelley	26/11/2020
SW05	F	Stormwater Layout Plan 1 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	10/12/2020
SW06	F	Stormwater Layout Plan 2 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021 & 25/3/2022)	10/12/2020
SW07	F	Stormwater Layout Plan 3 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW08	E	Stormwater Layout Plan 4 of 8 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL)	26/11/2020
SW09	F	Stormwater Layout Plan 5 of 8 Prepared by Barlow Shelley	10/12/2020
SW10	F	Stormwater Layout Plan 6 of 8 Prepared by Barlow Shelley	10/12/2020
SW11	E	Stormwater Layout Plan 7 of 8 Prepared by Barlow Shelley	26/11/2020
SW12	E	Stormwater Layout Plan 8 of 8 Prepared by Barlow Shelley	26/11/2020
SW13	E	Stormwater Longitudinal Section Sheet 1 of 3 Prepared by Barlow Shelley	26/11/2020
SW14	E	Stormwater Longitudinal Section Sheet 2 of 3 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	26/11/2020
SW15	F	Stormwater Longitudinal Section Sheet 3 of 3 Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW19	F	Bio-Retention Basin Layout & Detail Plan Sheet 1 of 6 “Road A” Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 26/11/2021)	10/12/2020
SW20	F	Bio-Retention Basin Layout & Detail Plan Sheet 2 of 6 “Road C” Prepared by Barlow Shelley	10/12/2020
SW21	F	Bio-Retention Basin Layout & Detail Plan Sheet 3 of 6 “Road C” Prepared by Barlow Shelley	10/12/2020
SW22	F	Bio-Retention Basin Layout & Detail Plan Sheet 4 of 6 “Hofmann Drive” Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW23	F	Bio-Retention Basin Layout & Detail Plan Sheet 5 of 6 “Road C” Prepared by Barlow Shelley	14/12/2020
SW24	F	Bio-Retention Basin Layout & Detail Plan Sheet 6 of 6 “Typical Bio Basin” Prepared by Barlow Shelley	10/12/2020
SW25	F	Tree Pit Layout & Detail Plan Sheet 1 of 2 “Road B” Prepared by Barlow Shelley	10/12/2020
SW26	F	Tree Pit Layout & Detail Plan Sheet 2 of 2 “Road C” Prepared by Barlow Shelley	10/12/2020
SW27	E	Stormwater Outlet Detail Plan Sheet 1 of 4 (Structure 1/2 & 1/12) Prepared by Barlow Shelley	26/11/2020
SW28	F	Stormwater Outlet Detail Plan Sheet 2 of 4 (Structure 1/5) Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	10/12/2020
SW29	E	Stormwater Outlet Detail Plan Sheet 3 of 4 (Lot 3) Prepared by Barlow Shelley (AS ANNOTATED BY COUNCIL 25/3/2022)	26/11/2020
SW30	E	Stormwater Outlet Detail Plan Sheet 4 of 4 (Structure 1/19) Prepared by Barlow Shelley	26/11/2020
		Bushfire Management Plan  prepared by Queensland Bushfire Planning	December 2020
J23177	2	Arborist report prepared by Arbor Operations	July 2020
	1	Fauna Management Plan prepared by Australia Wide Environmental Consultant	September 2020
1 of 23	H	OVERALL SITE LAYOUT PLAN ED20265 OPW 01 prepared by element design	July 2020
2 of 23	H	SHEET LAYOUT PLAN ED20265 OPW 02 prepared by element design	July 2020
3 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 03 prepared by element design	July 2020
4 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 04 prepared by element design	July 2020
5 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 05 prepared by element design AS AMENDED IN RED by Council.	July 2020
6 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 06 prepared by element design AS AMENDED IN RED by Council	July 2020
7 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 07 prepared by element design	July 2020
8 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 08  prepared by element design	July 2020
9 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 09 prepared by element design	July 2020
10 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 10 prepared by element design	July 2020
11 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 11 prepared by element design	July 2020
12 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 12 prepared by element design	July 2020
13 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 13 prepared by element design	July 2020
14 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 14 prepared by element design	July 2020
15 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 15 prepared by element design	July 2020
16 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 16 prepared by element design	July 2020
17 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 17 prepared by element design	July 2020
18 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 18 prepared by element design	July 2020
19 of 23	H	STREETSCAPE PLANTING PLAN ED20265 OPW 19 prepared by element design	July 2020
20 of 23	H	BIO RETENTION BASIN PLAN ED20265 OPW 20 prepared by element design	July 2020
21 of 23	H	DETAILS PLAN OPW 21 prepared by element design	July 2020
22 of 23	H	PLANT SCHEDULE PLAN ED20265 OPW 22 prepared by element design AS AMENDED IN RED by Council.	July 2020
23 of 23	H	10m WIDE BUFFER & SPECIFICATION ED20265 OPW 1 prepared by element design	July 2020
STG-M000053677 Sheet 1 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 2 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 3 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 4 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
STG-M000053677 Sheet 5 of 5	F	Pit and Pipe Layout prepared PE Consulting Engineers	08.12.2020
S1301229 Sheet 1 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 2 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 3 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 4 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 5 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 6 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 7 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 8 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
S1301229 Sheet 9 of 9	E	INSTALL NEW 500kVA PMT, 11kV & LV CABLE, CONDUITS, PILLARS, PITS & STREETLIGHTS prepared PE Consulting Engineers	06.01.2021
10651CSP Page 1	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 2	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 3	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 4	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 5	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
10651CSP Page 6	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L	01/11/2021
10651CSP Page 7	G	Clearing Staging Plan prepared by Norris Clarke and O’Brien P/L as annotated by Council	01/11/2021
Additional Plans November 2021			
20-000713-410	B	Road C Amendments Layout Plan prepared by Calibre	20/10/2021
20-000713-416	B	Road C Additional Drainage Catchment Plans prepared by Calibre	20/10/2021
Additional Plans 26 November 2021			
20-000713-450		Road A Amendments Intersection Layout Plan prepared by Calibre	17/11/2021
20-000713-451	A	Road A Bio-Pods Layout Plan prepared by Calibre	17/11/2021
20-000713-452		Road A Amendments Intersection Layout Plan prepared by Calibre	Undated
ED 20265 OPW 01	C	Proposed Future Transit – Sheet Layout Plan prepared by Element Design	16/11/2021
ED 20265 OPW 02	C	Proposed Future Transit – Streetscape Planting Plan prepared by Element Design	16/11/2021
ED 20265 OPW 03	C	Proposed Future Transit – Details Plan prepared by Element Design	16/11/2021
ED 20265 OPW 04	C	Proposed Future Transit – Plant Schedule Plan prepared by Element Design	16/11/2021
ED 20265 OPW 05	C	Proposed Future Transit – Specification prepared by Element Design	16/11/2021
Additional Plans 25 March 2022			
20-000713-620	B	Stormwater Amendments New Line 5 Outlet Detail Plan prepared by Calibre	17/12/2021
20-000713-621	A	Stormwater Amendments New Line 5 Longitudinal Sections prepared by Calibre	14/12/2021
20-000713-623		Stormwater Amendments New Line 5 Outlet Amended Biopod Details prepared by Calibre	16/12/2021
C.	Include additional conditions 86, 87 and 88.
Vegetation removal required for the pipe and headwall works and the swale drain works must occur in accordance with the approved Arborist Report (no. J28316 dated March 2022).
Trees to be removed are required to be offset at a ratio of 2:1 with final planting locations to be determined on site in accordance with Council’s delegate.
Offset replacement planting species must be a mix of species removed during the approved works including; Eucalyptus resinifera (Red Mahogany), Syncarpia glomulifera subsp. glomulifera (Turpentine), Corymbia intermedia (Pink Bloodwood), Eucalyptus robusta (Swamp Mahogany), Melaleuca quinquenervia (Broadleaf Paperbark) and Eucalyptus grandis (Flooded Gum) or other species approved by Council.

[word/footer1.xml]
Page 26 of 27

[word/header1.xml]
3

[Attachment: image2.jpeg (image text)]
~ SNR OY
Foueroucnang nN.
a

   
  
 
   
 
 

   

 

 

 

 

 

FOR APPROVAL

Fla ut

 

 

bee ee pee gs | STOCKWELLDEVELO

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 
Log in to download the original file

Minor Change Report OPW20 0145.05.docx · 333 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.