Original source · versioned page text
2018-09-11 Planning & Environment Committee Agenda
The original of this document is very large (18.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
AGENDA
Planning & Environment
Committee Meeting
Tuesday, 11 September 2018
commencing at 9.30am
Committee Room, 9 Pelican Street, Tewantin
Committee: Crs Brian Stockwell (Chair), Jess Glasgow, Ingrid Jackson, Tony Wellington
“Noosa Shire – different by nature”
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 68 (of 95)
Section 2
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
TABLE OF CONTENTS
ITEM PAGE
ATTENDANCE & APOLOGIES -
PRESENTATIONS -
REPORTS FOR CONSIDERATION OF THE COMMITTEE 3
1 MCU18/0084 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
FOR VISITOR ACCOMMODATION TYPE 3 (RURAL CABINS) AT 340 POMONA
KIN KIN ROAD, PINBARREN 3
2 MCU17/0005 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION,
AMUSEMENT & FITNESS (PAINTBALL), 113 MARARA ST COOROY 22
3 MCU17/0046 PLANNING & ENVIRONMENT COURT APPEAL NO 2843 OF 2018
DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR DUPLEX
DWELLING AT 38 PARK CRESCENT, SUNSHINE BEACH 33
4 OPW17/0555 PLANNING & ENVIRONMENT COURT APPEAL NO 2760 OF 2018
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS FOR SIGNAGE AT 4-24
GIBSON RD, NOOSAVILLE 46
5 132006.1395.4 PLANNING & ENVIRONMENT COURT APPEAL NO 2995 OF
2018, REFUSAL OF EXTENSION TO RELEVANT PERIOD FOR 10 MULTIPLE
DWELLING UNITS AT 142 NOOSA DVE, NOOSA HEADS 48
6 COM18 0263 PLANNING & ENVIRONMENT COURT APPEAL NO 2881 OF 2018,
ENFORCEMENT NOTICE ISSUED TO NOOSA AIRFIELD, LAKE WEYBA DVE &
EENIE CREEK RD, NOOSAVILLE 51
7 CONSERVATION LAND GUIDELINES 57
8 REGISTER OF PREQUALIFIED SUPPLIERS FOR THE SUPPLY OF
ECOLOGICAL RESTORATION SERVICES 1718T077 87
9 LGAQ ANNUAL CONFERENCE PROPOSED MOTION - ELECTRONIC GAMING
MACHINES 91
10 ESTABLISHMENT OF TEEWAH AND COOLOOLA WORKING GROUP AND
APPOINTMENT OF COUNCILLOR REPRESENTATIVE 94
CLOSED SESSION -
Page 2 of 95
Section 3
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
REPORTS FOR CONSIDERATION OF THE COMMITTEE
1 MCU18/0084 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR
VISITOR ACCOMMODATION TYPE 3 (RURAL CABINS) AT 340 POMONA KIN KIN
ROAD, PINBARREN
DOCUMENT INFORM AT ION
Author Development Planner, Glen Conforti
Environment and Sustainable Development Department
Index ECM/ Application/ MCU18/0084
Attachment 1. Proposal Plans
APPLICATION DETAILS
Applicant Sarah Keating
Simon Marsh
Proposal Material Change of Use for Visitor Accommodation - Type 3 Rural
Properly Made Date 25 May 2018
Information Request Date 7 June 2018
Information Response Date 26 June 2018
Decision Due Date 2 October 2018
Number of Submissions 1
PROPERTY DETAILS
Property Address 340 Pomona Kin Kin Rd, Pinbarren
RP Description Lot 26 M 37911
Land Area 15.68 ha
Existing Use of Land Dwelling house
STATUTORY DETAILS
SEQRP Designation Regional Landscape and Rural Production
Locality Mary River Catchment
Zone Rural
Overlays Biodiversity Overlay – Riparian buffer
Natural Hazards Overlay – Bushfire hazard
Natural Resources Overlay – Agricultural land conservation area
Assessment Type Impact
Page 3 of 95
Section 4
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 September 2018 regarding Application No. MCU18/0084 for a
Development Permit for Material Change of Use - Visitor Accommodation - Type 3 Rural
(Cabins) situated at 340 Pomona Kin Kin Rd, Pinbarren Qld 4568, and
A. Approve the application in accordance with the following conditions:
PLANNING
When Conditions must be Complied With
1. Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the
use continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply
with the approved plans of development. The approved plans are listed in the
following table unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
A1 C Site Plan, prepared by Jim Morehead Building Design and 06/08/18
Drafting as annotated by Council
A2 B Site Plan – Aerial View, prepared by Jim Morehead 06/08/18
Building design and Drafting and as annotated by Council
A3 B Part Site Plan, prepared by Jim Morehead Building design 06/08/18
and Drafting and as annotated by Council
A4 A 2 Bedroom Cabin – Floor Plan & Elevations, prepared by 01/05/18
Jim Morehead Building Design and Drafting
A5 A 2 Bedroom Cabin, prepared by Jim Morehead Building 01/05/18
Design and Drafting
3. The development must be undertaken and operated in a manner that causes no
detrimental effect upon the amenity of the neighbourhood by reason of the creation of
excessive noise, lighting nuisance or other emissions.
Built Form
4. The cabins must be finished in colours that are muted/earth environmental tones that
blend with the natural environment.
5. Window hoods must be provided to all windows to provide weather protection.
6. Weatherboard cladding must be provided to at least 1 cabin in each Stage.
7. The maximum height of the development must not exceed that indicated on the
approved plans.
Performance Bond
8. Security in the form of a cash bond or trading bank guarantee to the sum of $3,000
must be submitted to Council prior to the issue of a Development Permit for Building
Works, to secure the carparking and landscaping conditions of this approval. The
cash bond or trading bank guarantee will be returned on performance of these
conditions of approval less any costs incurred by Council in respect of enforcing
performance of this permit. Council reserves the right to call upon the bond or
guaranteed sum to effect compliance with conditions.
Landscaping
9. Screening vegetation must be planted near the cabins in accordance with Council’s
Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. In this regard
screening trees must:
Page 4 of 95
Section 5
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
a. be planted to the north side and for the full length of the cabins and be setback
a minimum of 20m from the northern boundary;
b. be planted on the western side of Stage 1 cabins to screen the development
from the Pomona Kin Kin Road;
c. must have a minimum pot size of 75mm and consist of species Syzygium
smithii (formerly Acmena smithii), Waterhousia floribunda and Syzygium
francisii or similar native local species planted at a maximum spacing of 3 metre
centres; and
d. be planted as part of the first stage of development.
10. Landscaping must be provided in-between the cabins as they are constructed. The
landscaping must be in accordance with Council’s Planning Scheme Policy PSP 3
Landscaping Plants and Guidelines.
Staging
11. The development may be staged in accordance with the stages shown on the
Approved Plans. The development need not be completed sequentially in the stage
order indicated on the Approved Plans provided the landscaping and carparking area
to service the development and associated services are constructed as part of the
first stage.
Nature and Extent of Approved Use
12. The total number of cabins must not exceed 6 and a maximum of 2 bedrooms per
cabin.
13. The cabins must be used for short term visitor accommodation only. The cabins must
not be used for permanent accommodation.
Water Supply
14. The development must be provided with a potable water supply connected to each
cabin. The storage capacity of the potable water supply must be a minimum of 4000
litres per cabin.
Waste Water Treatment and Disposal
15. The development must be provided with an on-site waste water treatment and
effluent disposal system having a capacity sufficient for the use*.
*(Refer to Advisory Note)
Waste Storage
16. Waste storage and disposal facilities must be provided in accordance with Planning
Scheme Policy 9, Waste Management.
17. All refuse and recycling containers must be suitably screened from neighbouring
properties.
ENGINEERING
Site Access and Driveways
18. Approval from the Department of Transport and Main Roads for the final design and
construction of the site access and driveway works must be submitted in writing to
Council prior to the commencement of the use.
Car Parking
19. A minimum of 7 car parking spaces must be provided and marked on the site as part
of the first stage of development. The carparking area must be designed by a suitably
qualified person and must be constructed with:
Page 5 of 95
Section 6
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
a. a suitably bound surface that minimises the impacts of dust and noise on the
proposed development and the adjoining property;
b. dimensions, crossfalls and gradients in accordance with Australian Standards
AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant user class.
Stormwater Drainage
20. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks
21. All earthworks and associated batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The application seeks a Development Permit for Material Change of Use for visitor
accommodation in the form of 6 two bedroom cabins to be introduced in 2 stages. Stage 1
includes 3 cabins and should there be sufficient demand, another 3 cabins will be constructed as
Stage 2. The cabins measure 6.5m x 5.8m with a gross floor area of slightly less than 38m²,
consist of a saw tooth roof form and a covered front veranda. The external walls consist of
insulated sandwich panels which the applicant proposes to either paint muted environmental
tones or clad in a weather board type finish. The applicant has also indicated that window hoods
could be added. The cabins are less than 4m high. Figure 1 shows a typical floor plan and
elevations of a cabin.
Page 6 of 95
Section 7
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 1 – Floor plan and elevations
Setbacks are a minimum of 40m to the nearest boundary and approximately 174m – 200m from
the Pomona Kin Kin Road frontage. Landscaping is proposed in-between the cabins and
between the cabins and the northern boundary. Figure 2 below shows an aerial of the site
overlaid with the cabin location.
Page 7 of 95
Section 8
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 2 – Aerial view showing the cabin location
A gravel car parking area is proposed for 7 vehicles including a disabled space to be accessed
from the existing sealed driveway. A walking track to access the cabins is also proposed.
The applicant has provided the following business outline as part of their operational plan:
Our target market is young families who want to come and stay in a rural location and enjoy a
lifestyle farm setting. We will have a variety of small animals on site namely chickens, guinea
fowl, pygmy goats, Dexter cattle, sheep, and horses (2 of each breed except chickens where we
will have 6) and will encourage the families to help with feeding and collection of eggs.
We would also like to attract those who want to enjoy the wildlife we have here, such as the
many types of birds and butterflies, and will advertise on nature sites and forums. As we are
located just off the Noosa Trail Network we hope that this will be an incentive to those who would
like to go walking/hiking or mountain biking during the day and enjoy the Noosa countryside.
We will not allow any type of motorised vehicles such as trail bikes/motocross etc. on site (other
than the main car in the designated area) as this would scare the local wildlife and could become
a noise nuisance to other visitors, our neighbours and ourselves.
We think that the provision of cabins in this setting will be a wonderful opportunity for those
people who want a back to nature experience with the comfort of a self-contained cabin.
The application is before Council because of a detailed submission against the development.
2. SITE DETAILS
2.1. Site Description
The lot is generally rectangular in shape with the western 1.2ha (approx.) of the property severed
by Pomona Kin Kin Road as shown in Figure 3 below. Both sides of the Pomona Kin Kin Road
are low lying. A seasonal drainage line is centrally located longitudinally through the lot. The
southern boundary has frontage to the south end of Camphor Road. The lot slopes up from
Pomona Kin Kin Road to the eastern boundary. The dwelling house and associated sheds are
located behind a stand of native vegetation toward the centre of the lot. The dwelling house and
sheds are accessed by a sealed driveway from the Pomona Kin Kin Road. Figures 3 and 4 below
show an aerial view and locality plan of the lot.
Page 8 of 95
Section 9
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 3 – Aerial Plan. The perimeter of the lot shown in red
Figure 4 – Locality Plan
2.2. Surrounding Land Uses
The site is generally surrounded by pasture on small lot tenure similar in size to the subject lot.
Activities typically found on small rural tenure such as hobby farms, equine uses, small scale
cropping and some combined lots suitable for cattle grazing surround the lot. The lot is in close
proximity to Trail 2 of the Noosa Trail Network. Figure 5 below shows the subject site and
proximity to Trail 2 of the Noosa Trail Network.
Page 9 of 95
Section 10
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 5 – Subject site and Trail 2 of the Noosa Trail Network in yellow.
The cabins are proposed nearly 400m from the neighbouring dwelling to the north and around
300m to the neighbouring dwelling to the south.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
The Noosa Plan.
3.2. State and Other Statutory Instruments
State Planning Policy
The Noosa Plan is generally consistent with the State Planning Policy July 2017 (SPP) and the
SPP raises no further issues relevant to the proposed development.
South East Queensland (SEQ) Regional Plan
The site is located within the Regional Landscape and Rural Production area of the SEQ
Regional Plan. The proposal is consistent with the regional policies of the SEQ Regional Plan.
Planning Regulation 2017
The proposal is for a tourist activity which complies with the provisions for the Regional
Landscape and Rural Production Area outlined in the Planning Regulation 2017.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Page 10 of 95
Section 11
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Locality Provisions
The subject site is located in the Mary River Catchment Locality and is zoned Rural. The
proposed use is a consistent use within the zone and is required to follow an impact assessable
application process.
Overall Outcome 8.7.2 mm) of the Mary River Catchment Locality Code is relevant to the
assessment of this application and states:
mm) For the Rural Zone — rural land is protected and appropriately managed such that:-
i. agriculture and habitat protection are the dominant land uses;
ii. the scenic and environmental values, the distinct rural amenity and agricultural
productivity of the locality are preserved and are not adversely impacted as a
consequence of development on or adjacent to that land; and
iii. locally appropriate enterprises such as bed and breakfast accommodation, farmstays,
cabins, camping grounds, roadside stalls and home-based businesses enhance the
economic sustainability of the hinterland; and…
The property is a small rural tenure, designated as an Agricultural Land Conservation Area. The
cabins are 37.7m² each with a total combined footprint of 228m² which translates to the cabins
occupying less than 1% (0.15%) of the lot area. Given their small scale, the cabins are unlikely to
negatively impact on, constrain or alienate agricultural pursuits suited to the property.
The proposal will not affect any habitat along the riparian area of Pinbarren Creek being setback
between 300m to 500m from the creek.
Three of the 6 cabins are likely to be seen in the distance from the Pomona Kin Kin Road, as
shown in Figure 6 below. The applicant proposes to plant trees around the cabins to maintain the
rural scenic values.
Figure 6 – Location of cabins
In terms of preserving agricultural productivity or uses on adjoining land, the neighbouring
property to the north is currently utilised for equine activities. The cabins are a minimum of 40m
from the common boundary and approximately 65m – 70m to the nearest fenced paddock with 2
existing vehicle access roads between the cabins and the paddocks. The cabins are also
approximately 80m - 90m from the nearest farm shed and nearly 400m to the northern
neighbour’s dwelling house. It is considered that sufficient separation is proposed so to not
negatively impact any rural use on neighbouring land.
Furthermore, the applicant has provided the following as part of the original application
documentation:
Page 11 of 95
Section 12
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
As we are looking to attract the family market with young children we anticipate that there
will be no noise late at night as the children will be in bed. Each cabin will have its own
kitchen and bathroom so there is no need for people to be moving around outside the
cabins late at night. We are not allowing vehicles up to the cabins and so there will be no
additional noise if people return late at night.
The applicant is proposing cabins for visitor accommodation in a farm stay type format which
provides economic diversity for the land owner, could complement any agricultural pursuits that
may occur on the property and will generally support the economic sustainability of the
hinterland.
Land Use & Works Provisions
The application has been assessed against applicable codes. The pertinent issues arising out of
the assessment against the codes are discussed below:
Visitor Accommodation Code
Table 14-36 of the Visitor Accommodation Code for Type 3 – Rural Accommodation is relevant
and specific for the subject use.
Probable Solution 35.1 states:
S35.1 Rural accommodation does not exceed a site density of —
a) 2 cabins per hectare; or
b) 2 guest bedrooms per hectare, providing the overall number of cabins and guest bedrooms
does not exceed 6.
The subject site is 15.68ha and the proposed 6 cabins comply with the maximum quantity of
cabins for the lot size. However, the proposal seeks 12 guest bedrooms within the 6 cabins
rather than the maximum of 6 bedrooms set out by Probable Solution S35.1 b). Therefore the
cabins should be assessed against the corresponding Specific Outcome O35 which states:
O35 Rural accommodation is associated with rural production, agricultural pursuits and
promoting the natural environment and takes the form of farmstays, bed and breakfasts,
cabins, cottages or a small guest lodge.
The applicant has recently purchased the lot and is in the early stages of establishing small scale
agricultural pursuits as outlined in Item 1 of this report. The applicant seeks to take advantage of
the lot’s natural features such as Pinbarren Creek (adjoins the western boundary) and views of
Mt Pinbarren. It is also a short walk or ride to the northern section of Camphor Road where
Noosa Trail Network Trail 2 meets the Camphor Road carpark (See Figure 5 in Section 2.2
above). It is considered the cabins would be associated with and complement the small-scale
agricultural pursuits and will promote the natural environment of the lot, the surrounding area and
the Noosa Trail Network.
In terms of the number of bedrooms, each cabin is small being only 37.7m² with the applicant
advising that their focus is on attracting families. Having 2 bedrooms, albeit small bedrooms
(2.8m x 3.1m with no wardrobe), is beneficial for this purpose. While there may be 12 bedrooms
proposed, the cabins are very small and any additional patrons or vehicle movements are
unlikely to have a negative impact on the agricultural practices of the lot, adjoining properties or
the surrounding area. Furthermore, the additional bedrooms may not necessarily attract
additional vehicles when considering the target market being families with children.
Probable Solution 37.1 is relevant to the assessment and states:
S37.1 Buildings and other structures —
a) take the form of small separate buildings which are visually separated;
b) comprise a mix of lightweight (low mass) and textured external materials, such as timber
cladding and corrugated iron roofs;
Page 12 of 95
Section 13
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
c) reflect the line, form, colour and texture found in the existing landscape and do not replicate
artificial or imported themes;
d) use muted earth/environmental tones that blend with the rural and/or natural environment;
and
e) incorporate low reflective roofing.
The cabins do not have eaves to the side elevations but comply with S37.1 a), d), and e). The
applicant has not provided the colour of the cabins but has indicated, if approved, would accept a
condition which requires the cabins painted muted environmental tones, the incorporation of
window hoods and some cabins cladded in a weatherboard type finish. When these design
aspects are incorporated, the cabins would complement and blend into the rural and natural
character of the area and comply with the built form intent of the code.
Effluent treatment and disposal
The applicant has provided a site specific effluent disposal report which ensures appropriate
water treatment and land application area for the site can be achieved. The required plumbing
approval would ensure suitable effluent disposal area/s are provided, so no negative impact on
the natural environment is foreseen.
Bushfire
Some of the vegetation surrounding the centrally located drainage line is affected by Medium
Bushfire Hazard. See Figure 7 below.
Figure 7 – Aerial showing the extent of the Medium Bushfire Overlay.
The cabins are located well away from any mature vegetation and the lot is generally surrounded
by pasture and considered to be low risk. Nevertheless, each cabin is provided with a 4,000 litre
water tank in accordance with the Mary River Catchment Locality Code which can be
supplemented by the 2 existing dams on site. The applicant has provided an operational plan
which nominates an emergency evacuation route, a meeting point and proposes a notice in each
cabin detailing emergency procedures.
Carparking
One space per cabin and 1 one additional space has been provided in accordance with the
Planning Scheme. Should there be a need, there is sufficient space for more vehicles near the
proposed carparking area. The carparking area is proposed as gravel. To avoid noise and dust
concerns a condition could ensure the carparking area is a bound surface.
Page 13 of 95
Section 14
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
4. CONSULTATION
4.1. Referral Agencies
The application was referred to the following Referral Agency:
Department of Infrastructure, Local Government and Planning (SARA)
The Department is a referral agency for the application as the site is accessed directly from a
state-controlled road.
The Department has responded and approved the development subject to conditions to be
attached to the Decision Notice and advises that:
a. Adequate sight distance is available at the access location.
a. No adverse crash history exists at the access location.
b. The objective of the Transport Infrastructure Act 1994 (TIA) require the establishment of a
road regime that is safe and efficient.
c. The intensification of use of the access will not result in significant impacts to the safety or
efficiency of the road network.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
Ecology Officer
Engineering Officer
4.3. Public Notification
The application was publicly notified for 15 days business days in accordance with the Planning
Act 2016. One properly made submission was received from the northern adjoining property
owner. The following table provides a summary and assessment of the issues raised by
submitter.
Matters Raised Comments
The development application incorrectly The assessment of this application assumes agricultural
identifies my adjoining land as being a pursuits will be undertaken on rural land.
residential use and fails to acknowledge its
equine uses.
The proposal is more akin to detached motel The visitor accommodation structures meet the
villas (70m2 each) in a themed rural setting definition of a cabin in accordance with The Noosa
than a farm stay in eco cabins which are Plan.
ancillary to the continued operation of a farm The proposal is taking advantage of the natural features
as being claimed in the development of the area (Mt Pinbarren, Pinbarren Creek and the
application. Noosa Trail Network) and the applicant is in the start-up
phase of small scale agricultural pursuits.
The development application fails to As a response to the submission, the applicant has
acknowledge the potential for noise nuisance moved the closest cabins to the neighbouring use to the
on my equine use of the adjoining property west and provided a greater setback to avoid a
which is as close as 25 metres from the neighbour dispute. The closest cabin is proposed
proposed cabins. approx.65m – 70m from the nearest fenced paddock
and approx.80m - 90m from the farm shed.
There are examples in the Shire where detached
housing (far more intensive residential use than that
proposed) are adjacent to intensive equine uses and
generally exist in harmony.
Page 14 of 95
Section 15
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Matters Raised Comments
The proposed communal car parking area is The equine ‘round yard’ is greater than 150m away
not appropriately designed or positioned and from the car park. Council’s Engineering Officer has
as such will be a potential to create a nuisance provided comment and indicates a bound gravel
for my equine use of my rural property. surface is sufficient to mitigate noise and dust issues
and a condition could ensure it is constructed to the
relevant standards.
The development application fails to provide Landscaping is proposed between the cabins, the
adequate visual buffers to my rural property. northern property, and the Pomona Kin Kin Road. The
cabins are not sited on a ridge line and the proposed
and existing trees will provide a visual buffer.
Loss of Privacy and Loss of Amenity (including The cabins are oriented to the south (internally) and not
privacy of activities on the property) toward the submitter’s boundary. Landscaping is
proposed which will buffer the 2 uses.
The large dam and water ways so close to the There is no lawful requirement to fence a dam.
cabins is dangerous for small children.
The existing vehicular access into the site is The application was referred to the Department of
not considered suitable for the proposed Infrastructure, Local Government and Planning as a
development. concurrence agency (access off a state-controlled road)
who raised no concern with the access. Their
assessment forms part of this report.
Furthermore, the existing access is sealed and provides
access to the existing dwelling house and sheds.
The development application provides limited The applicant has provided an effluent disposal report
information on the two proposed land and can comply with all relevant standards.
application areas which are sited against my Furthermore, the applicant must submit a plumbing
boundary fence and uphill from the cabins, that application to Council’s Building and Plumbing
they service and within landscaped buffers. Department for approval, which will ensure compliance.
The development application fails to provide The site is a low bushfire risk being surrounded by
sufficient information so as I can establish if pasture and the cabins are well away from any high risk
the proposal will increase the potential for mature vegetation. The cabins and proposed
bushfire hazards landscaping is unlikely to increase bushfire risk.
The proposal does not sufficiently identify The application material indicates 4,000 litres of water
where either the potable or non-potable water harvesting per cabin with 2 dams used as a backup.
supply.
The development application does not clearly The application documentation advises one refuse bin
indicate where the refuse bins/skip will be and one recycle bin will provided in each cabin and that
stored and whether any screening is proposed. waste will be disposed of at the local refuse point on
Louis Bazzo Drive or a refuse skip will be provided. A
condition could ensure refuse area/s are screened and
located appropriately in accordance with Planning
Scheme Policy 9.
The development application could There is a short section of the Pomona Kin Kin Road
compromise public safety by encouraging between the property and the northern section of
pedestrian access along a section of Pomona Camphor Road (Noosa Trail Network) where there is a
Kin Kin Road which is not suited to such narrow verge. The verge is still wide enough for
access. pedestrian movements if required and there are
adequate sightlines in this area.
The proposed development will increase my Surveillance of an area or building/s generally improves
current concerns that I have in relation to security.
security of my rural outbuilding.
Page 15 of 95
Section 16
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Matters Raised Comments
The proposed use may result in a reverse Adequate buffer distances are proposed to minimise
amenity situation whereby visitors in the this occurring.
adjoining non-rural use, if approved, may
complain that my current rural uses are
creating a nuisance.
There is a concern that the people visiting the This is not a relevant planning matter.
proposed motel villas could decide to enter my
property and as a result I will face increased
liability in the case of trespass.
Amended proposal without amending relevant The proposal plans were amended as a result of this
supporting documents submission to mitigate neighbour concerns and to avoid
disputes.
Council’s approval of the development An assessment of the application against The Noosa
application will be in conflict with the preferred Plan is provided in the body of this report.
outcome and strategies for the Rural Zone in
the Noosa planning Scheme
5. CONCLUSION & REASONS FOR DECISION
The proposal is for rural visitor accommodation in the form of 6 small, 2 bedroom cabins which
are a consistent use in the rural zone. Three cabins are proposed as Stage 1 and should there
be demand, 3 cabins as Stage 2. Being new land holders, the applicant seeks to introduce
agriculture pursuits over time which are suitable for a small rural holding. The patrons will take
advantage of the hobby farm practices, the rural views, the natural surroundings and the nearby
Noosa Trail Network. When some additional architectural features are incorporated into the
cabins they would comply with the relevant built form provisions. It is considered the proposal
has sufficient separation from and is unlikely to negatively impact on the neighbouring equine
use. The cabins raise no significant planning concerns and are recommended for approval
subject to conditions.
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services X Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
x
Design and Delivery
Page 16 of 95
Section 17
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 17 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Attachment 1
Line of trees
planted a minimum
of 20m from the
EXISTING boundary as part of
SEALED LAND APPLICA Stage 1 LAND APPLICATION AREA
DRIVEWAY REFER ASI REPORT 1800p 1A RAVEL REFER ASI REPORT 180061(A)
[ PARKING AREA 90°0'0"
5 a a -—— jo... sa ft
J sss Ee Nig oS] S&S) oS) TING SHED 62220
fo - ON ea © = go :
( D Wy . =
Qe TAM — \e ET ma |
S gy. & OULO Be |
= f : RD beeen |
2 Line of trees to be EDS DDD f ~
“<< lp planted as part of ~~ STAGE 2 EXISTING |
= lg Stage 1. th DAM |.
= i \ s,2
S S|. WATERWAY STAGE | EXISTING a8
OS'S A ~ T=
S g/ (A shep |
S jo
fh bya 1
1& <sS |
1g EXISTING ;
DB RESIDENCE APPROX |
hes WATERWAY |
a A | 2 ed
‘ ! 682600
CAMPHOR ROAD
NOTE: ADDITIONAL PLANTING TO BE PROVIEDED BETWEEN AND €} PROPOSED BUSHES FOR SCREENING
AROUND PROPOSED CABINS TO PROVIDE SCREENING AND PRIVACY & PROPOSED TREES FOR SCREENING
APPROPRIATE NATIVE SPECIES WILL BE PROPOSED IN
CONSULTATION WITH COUNCIL AND DISTRICT LANDCARE GROUP
SITE PLAN N
SCALE 1:2500
PROPERTY DESCRIPTION Ww E me SITE PLAN cd
— moc, PROPOSED DEVELOPMENT eas — fare
LOT 26 ON M37911 aes S.KEATING ere
AREA : 26.99 hA useess. 340 POMONA KIN KIN ROAD peel oesteeren Lox |
S PINBARREN
nr a PDRAWINGNO
| YNOENEAG - bullding sesgn tortng Bb mal ete an sd ak | 180404 —Ar [|
Page 17 of 95Section 18
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 18 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Po 2 . J ayy Of PS e
ae at eae ae
; F ; er ;
ri ; ;
yo 4 bt A i a _ Pr 3 Pe: *
Ea Ag ae a * ;
, y . 2 ‘ Seat _ 4, : 4 :
PY, a , eS : eree oe , 1 Fi f oe 4 3
a) 4q ws ec DS ri Tay : A’? i :
es af ¢ | be - i ei at eee,
a LF a ¥ rd Ate = yaad bs
ef = = We
7 . e y fi ~ ’ ‘
= is = = |) = 3 ,
- co - C ee iF 4 r ;
a = \ Br 7 ,
ae = | _ 4 = . : Te ;
i 7. 2 —
= : f a
=| 7 Ye a ee ee,
a O ff = oa . : Seamer Lb. vee
s = | z j y Z ye %
| e « } a Ry
a | { 4 ye ti eae
] odin ~ “ ee
iS ; 7 ca ie Ah?
jell | SESS oe a Sioa Fo bce Nd pre Se P ie
y > . a SES: : ae . YY. =. ne eee ie teind sia — k eciee A
a a hl enn i cs ee eee
y ; a Be ere ee alt , Ny i= ¥: a . if im ; = ay cee Meath ecu, Se
of n ay ees oe F & ‘ . 3 Fe: er
F 6 tong m2 Ps oh ‘ < : * E viva
4 et s i. eae See ss W ate See : a , P .
& a owe Bae el cM
, me SITE PLAN - AERIAL VIEW ET
prone PROPOSED DEVELOPMENT —s
ae S.KEATING Hf wsane sae [ra
avoress 340 POMONA KIN KIN ROAD few orscrenon | are |
Pca meee Deen re eee icos0e ae |
RTE TRS . ee : _ By) DRAwinG no
Page 18 of 95Section 19
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 19 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
\ & / »
| - s | | b
J \ 4
TYPE A TYPE A TYPE A . te TYPE A s
i l i [FR i TYPE A
~ || a
tT pi JR 000
Se lS , PROTERStn
PATHWAY {=
oe ( Le
20.7m 19M 23M
STAGE 1 \ \ STAGE 2
PART SITE PLAN
SCALE 1:500
TYPE A 2 BEDROOM CABIN
N
Te PART SITE PLAN ed
Ww E weoscr. PROPOSED DEVELOPMENT te} |}
ae —$.KEATING poy
sores: 340 POMONA KIN KIN ROAD faevi oesce non | are |
PINBARREN
s
re ae |ORAWINGNO, NO.
| moehead - buiaing design ¢ drafting _| BL. Je a Hf ve eedek 4 | 180404 —A3 | -A3 |B |
Page 19 of 95Section 20
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 20 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
a yay | 7] ws TTT TIT T Tt
PT Lo ES
ELEVATION A ELEVATION B
me | See SS LITTTIT TTI TTT th
7 SSS 7
YO PT
ELEVATION C ELEVATION D
ms g
Pom) |
BATH |
a
~ | [
ll |
||
225 6500
®
FLOOR PLAN
FLOOR AREA - 37.7 SOM
PATIO AREA - 13 SQM
me 2 BEDROOM CABIN - FLOOR PLAN & ELEVATIONS a
proxct’ PROPOSED DEVELOPMENT le}
ae S.KEATING te eres — fora
wwvess. 340 POMONA KIN KIN ROAD pater ——
PINBARREN
Page 20 of 95Section 21
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 21 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Be Mie |
4 fee ws nS 7 t -
J or he a at i rae
3 af t Zed
+ gl pm
ies a2 i — _ = re
2 ct . ve » a pare
o a a 4 j
_—_ i Me ie , DS) {
a | leet Nf a a
a ae - |e i —
—_ PN , = '
ie f Oa
~ | iat 3
EE
a a
EEE i
me 2 BEDROOM CABIN pfs
avoress 340 POMONA KIN KIN ROAD (Rev oescRenon CATE |
PINBARREN
PANO NCaA - isng sosgn toring Fal PS wal een aT a as del tL 180004 —A5 [A |
Page 21 of 95Section 22
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
2 MCU17/0005 DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE
ENTERTAINMENT AND DINING BUSINESS TYPE 2 RECREATION, AMUSEMENT &
FITNESS (PAINTBALL), 113 MARARA ST COOROY
DOCUMENT INFORM AT ION
Author Development Planner, Lisa Pienaar
Environment and Sustainable Development Department
Index ECM/Application/MCU17/0005
Attachments Nil
APPLICATION DETAILS
Applicant Hope Central Church
Proposal Development Application for Material Change of Use of Premises –
Entertainment and Dining Business Type 2 – Recreation, Amusement
& Fitness (Paintball)
Properly Made Date 10 January 2017
Information Request Date 8 February 2017
Information Response Date 10 August 2017
Decision Due Date 14 November 2017
Number of Submissions 3
PROPERTY DETAILS
Property Address 113 Marara St Cooroy
RP Description Lot 2 RP 225978
Land Area 23,500 m2
Existing Use of Land Place of Worship
STATUTORY DETAILS
SEQRP Designation Urban Footprint
Locality Cooroy & Lake McDonald
Zone Rural zone
Overlays Biodiversity Overlay – Environment Protection Area and Riparian
Buffer
Natural Hazard Overlay – Flooding and Bushfire (Potential Buffer and
High Potential
Koala Habitat Areas – Remnant Habitat
Assessment Type Impact
Page 22 of 95
Section 23
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 11 September 2018 regarding Application No. MCU17/0005 for a
Development Application for Material Change of Use of Premises – Entertainment and Dining
Business Type 2 – Recreation, Amusement & Fitness (Paintball) situated at 113 Marara St,
Cooroy and:
A. Refuse the application for the following reasons:
1. The proposed development is an inconsistent use in the Rural Zone and the increase
in traffic on Marara Street from the proposed development is not contemplated by
The Noosa Plan.
2. The proposed development is contrary to the Transport, Roads and Drainage Code
as the development will compromise the capacity and safety of Marara Street.
3. The current condition of Marara Street is not capable of safely accommodating any
increase in traffic from the proposed development and a satisfactory solution has not
been identified to address the constrained sections of Marara Street given the current
road formation and environmental constraints.
4. A number of properly made submissions have been received raising valid grounds of
objection.
B. Advise the applicant that an indoor play centre does require a further development
approval to operate from the site and such a use would significantly impact on the safety of
Marara Street were such a use to commence.
REPORT
1. PROPOSAL
The proposal is to accommodate outdoor paintball activities on the Hope Central Church Site in
Cooroy. The hours of operation for paintball activities are proposed to be run 5:30-10pm
Wednesday to Sunday with a maximum number of players of 20, plus 3 staff members. Games
are proposed to be completed by 9.30pm.
Paintball activities are proposed to be located within the existing cleared and lightly treed areas
of the grounds to the north of the northern car park and to the west of the existing auditorium.
The times specified for paintball activities cover the possible spread of opening hours depending
on bookings, with 1 session running per day. A session is 3 hours of multiple games with a
maximum of 20 players per session. A group of 20 players will play on one field at a time, rotating
between fields for different games.
Refer Figure 1 – proposed paintball fields and Figure 2 – general location of paintball
fields.
Page 23 of 95
Section 24
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 1 – Proposed paintball fields
Figure 2 – General location of paintball fields (outlined in blue – aerial).
Red hatching is an easement (environment).
Page 24 of 95
Section 25
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
2. SITE DETAILS
2.1. Background
Historical Application History
In 1991, Council approved a town planning consent application for a place of worship and manse
over the site. Conditions included the upgrading of Marara Street. This permit was not acted
upon and lapsed in 1996.
In September 1997, a new application was made for a place of worship and church activities
utilising an existing dwelling on site. The application was advertised, but the church did not
continue with the proposal.
In 1998 Council approved (11871 TC) a place of worship and activities relating to the conduct of
the church, new buildings over 3 stages as follows:
Stage 1 – hall seating up to 60 persons, kitchen, toilet and storage facilities having a gross floor
area of 169m2.
Stage 2 – larger auditorium/hall to seat up to 170 persons and convert the area subject to Stage
1 to 3 offices. The total gross floor area of 416m2.
Stage 3 – church auditorium providing seating for 250 persons. Upon completion of this stage,
Stage 2 hall to be used for Sunday School sessions and youth group meetings. Stage 3 totals
360m2.
The completion of all stages resulted in a single auditorium seating up to 250 persons, Sunday
School, youth group rooms, staff offices, kitchen, toilet and storage facilities, totalling 945m 2. The
single storey dwelling on site has been retained.
As part of this previous approval, Council conditioned the sealing of Marara Street to 4 metres on
the 8 metre wide formation, from the intersection of Marara Street and Mary River Road to the
furthest on site car park (north of building) and a contribution of $5,500 to the future upgrade of
the Marara Street/Mary River road intersection.
The applicant appealed these conditions. The appeal was settled out of court with Council
accepting the following requirements for roadworks:
Construction of a Type 1 intersection at the intersection of Marara St and Mary River Road;
An 8 metre wide sealed formation for the first 50 metres of Marara Street;
Construction of a 4 metre wide gravel road on the 8 metre formation with sufficient passing
places, varied to retain, where possible, all vegetation and drainage structures;
A 4 metre wide sealed formation for a distance of 100 metres along the frontage of the
dwelling house at 49 Marara Street; and
A monetary contribution of $5,500 to an intersection upgrade for Marara Street/Mary River
Road.
A total of 25 onsite car parks were conditioned as part of this approval. Council issued the
consent permit in December 1999.
Current Application History:
A development application was lodged by Hope Central Church for Paintball fields to be
developed behind the existing church at 113 Marara St, Cooroy in January 2017. In March 2017,
the applicant then changed their proposal to include an indoor play centre. This change was
made following a complaint received that ‘Kids world’ playmaze (indoor play centre) had
commenced without approval. The indoor play centre (playmaze) was operating out of an
existing building and included a small café to cater for patrons of the playmaze. Council advised
the Hope Central Church that the playmaze activities must cease and that an approval was
required for the playmaze. The existing approval for the church includes Condition 11 which
Page 25 of 95
Section 26
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
prohibits the premises to be used for ‘the holding of functions, wedding receptions or other uses
which are defined us function rooms, or indoor entertainment, under the provisions of the
Planning Scheme. Similarly the kitchen is not to be used for the commercial production of food’.
A playmaze would fall under the definition of indoor entertainment. Council officers confirmed in
writing to the church that this use is not permitted by the current development approval for the
site and requires a further development approval from Council to operate regardless of whether it
is a charitable arm of the church or a commercial venture. The play centre does not relate to the
conduct of the church with participants attending the play centre separately and unrelated to the
church’s activities of church gatherings, youth groups, bible study classes etc.
The church submitted again in July this year that they believed the playmaze did not require
Council approval as it was a not-for-profit run service. Because of this, and also in response to
the traffic concerns raised by Council officers, the applicant recently advised that they no longer
wished to include the playmaze in their application and formally changed their application to
exclude this use.
2.2. Site Description
The site is the home to the Hope Central Church and is accessed via Marara Street, a largely
unsealed road that formally begins with the Cooroy Library carpark as it intersects with Mary
River Road. Currently, the site has a regular church service on Sundays from 9:30am–1pm,
where up to 70 people may attend. In addition to the church service, a music lesson is held on
Thursday evenings from 7-8pm, with 4 people attending.
The beginning of Marara Road which also provides car parking for the library is sealed. There is
also a short sealed section on the frontage of No. 49 Marara Road, a residential property.
Refer to Figure 3 – First section of Marara Street - Cooroy Library Carpark intersecting with
gravel section of Marara Street.
Figure 3 – First section of Marara Street - Cooroy Library Carpark intersecting with gravel section of
Marara Street
The site is located adjacent to the North Coast rail line in a semi-rural area with significant
vegetation areas adjoining to the west and south. More than half of the site has significant
vegetation and a riparian area with a waterway running north/south through the site. Refer
Figure 4 – Aerial photo of subject site.
Page 26 of 95
Section 27
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 4 – Aerial photo of subject site
2.3. Surrounding Land Uses
The subject site is located west of the North Coast Rail line with bushland immediately to the
south and west of the site. The Cooroy township is located further south beyond the bushland.
Residential development is located opposite the site and on the other side of the rail line. To the
north of the proposed paintball fields is a rural property with a house located approximately 150m
from the northern most paintball field. A dwelling is built on No. 49 Marara St approximately
550m to the south from the southernmost paintball field.
3. ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of the
following statutory planning instruments to the extent they are relevant to the development:
State Planning Policies;
South East Queensland Regional Plan;
State Planning Regulatory Provisions:
Any Structure Plan or Master Plan in place for declared areas;
Any Preliminary Approval Overriding the Planning Scheme for the land;
The Planning Scheme for the local government area; and
Any Temporary Local Planning Instrument in place for the local government Sustainable
Planning Act Regulation 2009;
Page 27 of 95
Section 28
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
3.2. State and Other Statutory Instruments
State Planning Policy
The State Planning Policy has been deemed by the Minister for Local Government and Planning
as appropriately reflected in the Planning Scheme and therefore does not warrant a separate
assessment.
South East Queensland (SEQ) Regional Plan
The site is located within the Urban Footprint area of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
3.3. Statutory Instruments – Planning Scheme
The application must be assessed against the whole of the Noosa Plan to the extent the
provisions are relevant to the development.
Locality Provisions
The subject site is located in the Cooroy & Lake Macdonald Locality and is zoned Rural. The
proposed use is identified as an inconsistent use for land zoned Rural and is required to follow an
impact assessable application process. The Cooroy and Lake Macdonald Locality requires:
Rural land to be protected and appropriately managed such that agricultural and habitat
protection are the dominant land use, the scenic and environmental values, the distinct
rural amenity and agricultural productively of the locality are preserved and are not
adversely impacted, and locally appropriate enterprises such as farm stays, camping
grounds, roadside stalls etc. enhance the economic sustainability of the hinterland.
New uses to be located, designed and managed to be compatible with other uses, maintain
the safety of works and avoid significant adverse impacts on the amenity enjoyed by other
users of other premises.
The applicant states that ‘Cooroy has few recreational activities offered in the area and the
development of the paintball site would offer a unique day and night time event which allows
customers to avoid the heat in Summer at night.’ The applicant maintains that the proposed use
has minimal negative impact in the community and has the potential to offer a safe environment
for the youth. The applicant proposes a maximum number of people at any one time to limit
excess traffic on Marara Street.
The proposal does not directly compromise the zoning intent for the site given the existing use of
the site for a church, the site’s proximity to the Cooroy town centre, and the site’s limited
suitability for rural activities providing the proposal can maintain the amenity of the area for
nearby residents and access to the site is suitable. It also offers a potential alternative
recreational/entertainment activity for residents.
Noise & Lighting
The site is located in a rural area with 2 rural properties nearby. Paintball activities are located
outside and within the church grounds, on fields north and west of the existing buildings and have
the potential to impact on the 2 nearby residents.
The closest residence is approximately 150 metres away from the nearest paintball field. In
response to potential noise impacts, the applicant submitted a noise assessment to review the
potential noise impacts on nearby residents from the proposed paintball activities. The applicant’s
noise report recommended that the use of the horn be minimised and that activities be limited to
a maximum of 20 persons at any one time. The applicant has since advised that a horn will not
be used, but has not indicated how organisers would communicate with players with regard to
the commencement and conclusion of games. In this regard, Council’s Environmental Health
officer has advised that should the proposal be supported, that an alternative visual or other
remote personal signalling device be used to indicate start/stop times.
Page 28 of 95
Section 29
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
The site contains koala remnant habitat areas that align with the western portion of the site. The
proposed paintball activities are adjacent to these areas. It is proposed that outdoor lighting
associated with the use be angled towards the existing building and away from the bushland
area, so as to minimise impacts on fauna and neighbours to the north of the site.
Traffic and Access
Marara St is a narrow gravel single carriageway, servicing a small number of landholdings,
including the church and manse and 2 properties with dwellings. The road’s capacity is currently
significantly limited as it is very narrow in places, has limited to no sight line opportunities in
places, and is predominantly unsealed. Refer Figure 5 – Marara Road. The road is also
located in a bushland setting with a waterway running parallel to the road.
Residents living on this road (and submitters to this application) report safety issues associated
with the proposal and associated increased traffic, as was evident when the playmaze activities
commenced operations. The applicant states that they are not aware of any road safety
incidences on Marara Road associated with the use of their site. However, it is considered any
increase in use of this road beyond its current usage and in its current form is likely to cause
significant safety concerns for users.
These concerns were outlined in Council’s information request and the applicant was requested
to provide a traffic report to address the increase in traffic on Marara St. The applicant was also
requested to consider the existing formation, potential for impacts on residents, improvements of
the road necessary to cater for the proposed development and any other considerations, such as
an emergency management plan in high rainfall events.
A traffic report prepared by Road Pro Engineering was submitted by the applicant that
considered existing and proposed uses on site and results of a traffic survey. This survey over 7
days showed the highest peak demand generated by the existing church. The applicant’s traffic
report also submitted that this peak would increase to 40 vehicles per hour in the coming years
when the church patronage is expected to increase from an average of 70 to a maximum
capacity of 100 persons. In comparison, the proposed use will generate an estimated additional
maximum peak of 18 vehicles per hour. Due to the peaks occurring at different times, the
applicant’s traffic report submitted that the proposal would result in no net increase of peak traffic
from the site. On this basis, the applicant’s traffic consultant concluded that Marara Street would
not require upgrading (geometric improvements), sealing or the like to accommodate the
proposed uses. The applicant’s traffic consultant also recommended signage be installed along
Marara Street including ‘one lane’, ‘give way’ and ‘no stopping or passing’ signage at appropriate
locations along the road to support the proposal.
The applicant’s traffic report was peer reviewed by Council’s traffic consultant. Council’s traffic
engineer does not agree with the findings of the applicant’s traffic report and advises that
additional upgrade works are required to Marara Street to cater for the additional traffic
movements generated by the proposed development. The upgrades would including widening,
sealing and signage to address the valid and apparent safety issues that would result from the
proposal.
In an effort to address Council officer’s concerns in this regard, the applicant engaged an
engineer to undertake further investigation of the existing formation and prepare a design of the
necessary works. As part of the investigation, the applicant engaged a surveyor to locate and
identify levels of the existing road formation. The survey showed that part of the existing
formation (at the bend at the southern end and extending north for approximately 180 metres) is
located outside of the road reserve and within the adjacent Qld Rail land. In order to provide the
necessary width in the road reserve the formation would need to be relocated to the west and
this would require realigning a significant length of the creek bank. Due to the potential cost of
the necessary works and the potential impacts on the waterway and associated vegetation, it is
not considered feasible to undertake the works or reasonable to condition the applicant to
undertake the works. The option to widen and seal the existing formation without relocation
would require approval from Queensland Railway and may require a road opening.
Page 29 of 95
Section 30
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
The applicant has confirmed similarly that it is not within the church’s capacity to undertake the
improvements to Marara Street recommended by Council’s traffic engineer and submits that
Council should address the safety of the road. Such works are not currently within Council’s 5
year Capital Works program and are not identified as a priority for Council given the limited
number of properties that Marara Street serves. The existing road formation while less than ideal,
is acceptable for normal church services. However, issues arise and the safety risk significantly
increases if there are activities at the church that introduce additional traffic along the road. The
road currently carries approximately 55 vehicles per day and this would increase to 80 vehicles
per day with the paintball use.
Figure 5 – Marara Road
4. CONSULTATION
4.1. Referral Agencies
The application was referred to the Department of Infrastructure, Local Government and Planning
(SARA).
The Department is a referral agency for Queensland Rail for development within 25 metres of a
railway corridor. The Department has responded advising that they have no objections to the
proposal.
4.2. Other Referrals
The application was forwarded to the following internal Council officers:
Coordinator Operational Works
Environmental Health Coordinator
The application was also referred to Council’s external traffic consultant Stuart Holland.
Page 30 of 95
Section 31
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
4.3. Public Notification
The application was publicly notified for 17 business days in accordance with the Sustainable
Planning Act 2009. Three properly made submissions were received. The application was
publicly notified with the two uses being the paintball activities and the indoor play centre
(playmaze). The following table provides a summary and assessment of the issues raised by
submitters. Although the comments were based on two additional uses occurring on site, it is
considered the issues raised are still relevant for 1 additional use as per the existing proposal.
Matters Raised Comments
Single unsealed land does not support Marara Street in its current form is not suitable for
increased traffic the proposed increase in traffic and the proposal
Accidents have already occurred as raised by all has the potential to raise some significant and
3 submitters serious traffic safety issues for people using Marara
Concerns for pedestrians and cyclists and Street. The current condition and construction of
limited vision for cars coming both ways - Marara Street is not capable of safely
danger posed by increased vehicular and accommodating the proposed paintball fields or an
pedestrian traffic indoor play centre if proposed in the future.
Road is very dusty at the moment
People are not familiar with the dangers on this
road
Any increase in traffic on Marara Street cannot
happen safely without major upgrading of the
road - that is 2 sealed lanes with clear visibility
The nature of the existing road lends itself to
uses as there will be low traffic volumes and
some drive accordingly, creating dangerous
situations
The Playmaze/café has been operating since It is agreed that increased traffic or pedestrians on
April 2017 and since that time the road has this road in its current form is not suitable from a
attracted children and families either walking or capacity and a safety viewpoint.
cycling, when this has not been the case in the
past. Blind corners and the nature of the road
with increased traffic creates a very dangerous
situation.
The development proposal greatly There are approximately 25 onsite car spaces in
underestimates the expected numbers. close proximity to the paintball fields and
Sometimes parking spills out onto Marara St approximately another 12 spaces located on the
southern portion of the site. Car parking numbers
are adequate to cater for existing and the proposed
use. Paintball will utilise the onsite church parking
which has no overlapping hours with church times.
Increased noise from more patrons The closest residence is 150 metres from the
nearest paintball field. It is acknowledged that there
may be noise from paintball activities which will
consist of vehicle movements and voices from
players.
5. CONCLUSION & REASONS FOR DECISION
The proposed use, whilst it may offer Cooroy an additional recreational activity and a safe place
for youth, has the potential to raise some significant and serious traffic safety issues for people
using Marara Street and the current condition and construction of Marara Street is not capable of
safely accommodating any increase in traffic from the proposed paintball fields. Given the traffic
safety concerns the proposal would require significant upgrading to Marara Street and the church
has advised such works are not within their capacity. An upgrade to Marara Street is also not in
Council’s capital works program with the increase in traffic on Marara Street not contemplated for
the area. On this basis, and given a satisfactory solution to address the constrained sections of
Marara Street has not been identified throughout the application process, the proposal cannot be
reasonably conditioned. The application is therefore recommended for refusal.
Page 31 of 95
Section 32
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
It is also considered prudent to advise the applicant that an indoor play centre requires a further
development approval to operate from the site and such a use would significantly impact on the
safety of users of Marara Street were such a use to commence.
Departments/Sections Consulted:
Chief Executive Officer x Community Services Corporate Services
Executive Officer Community Development Financial Services
Executive Support Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
x Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning x Infrastructure Planning,
Design and Delivery
Page 32 of 95
Section 33
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
3 MCU17/0046 PLANNING & ENVIRONMENT COURT APPEAL NO 2843 OF 2018
DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR DUPLEX DWELLING
AT 38 PARK CRESCENT, SUNSHINE BEACH
DOCUMENT INFORM AT ION
Author Manager Development Assessment, Kerri Coyle
Environment and Sustainable Development Department
Index ECM/ Application/ MCU17/0046
Attachments 1. Approved Plans
EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 September 2018 regarding Planning & Environment
Court Appeal No. 2843 of 2018 and agree to defend the appeal.
REPORT
An appeal to the Planning & Environment Court has been lodged in response to an application to
change a development approval for a duplex dwelling. The appeal seeks that the Court approve
the application for a minor change to allow an additional open visitor space for the duplex
dwelling currently under construction at 38 Park Crescent, Sunshine Beach.
The duplex dwelling was approved over 38 Park Crescent, Sunshine Beach in August 2017. The
approved duplex consists of 2 x two bedroom units with each unit having a rumpus room capable
of being used as a third bedroom. The duplex is currently under construction, is 3 storeys and
just under the maximum 12 metre height limit for the area. Two single garages with a zero front
boundary setback and 1 open visitor car space to the southern side of the garages is approved
for future residents/visitors. A copy of the approved plans is included as Attachment 1.
Figure 1 – Approved site plan detailing 3 car parking spaces
Page 33 of 95
Section 34
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
The duplex dwelling fully complied with The Noosa Plan probable solutions for a duplex dwelling,
with the exception of the setback for garages and width of the driveway. A reduced setback from
6m to 0m for the garages was supported due to the site steeply sloping down from Park
Crescent, with the proposal also considered consistent with the existing streetscape.
Notably the original plans lodged with the application for the duplex dwelling proposed 4 car
parking spaces including 2 garages and 2 open visitor spaces. As part of the assessment
process, Council officers issued an information request requesting a revised design to reduce the
amount of hardstand area, narrow the driveway access on the street frontage and provide for
more landscaping. The applicant responded to the information request providing amended plans
to address the issues raised removing 1 of the open visitor spaces.
Figure 2 – Original proposal detailing 4 car parking spaces
In June 2018 the applicant lodged an application seeking to change the development approval to
allow an additional open visitor space on site and so provide a total of 4 car parking spaces on
site. The additional visitor space is shown in Figure 3 below.
Figure 3 – Plans lodged with Minor Change Application
Page 34 of 95
Section 35
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
This application was refused by officers as it would require a very wide driveway generally
covering the full frontage of the site, with limited opportunities for landscaping and result in a poor
outcome for the streetscape. The proposal is not consistent with The Noosa Plan requirements to
minimise the number of access points to a site, ensure vehicle manoeuvring areas are designed
and sited to not dominate the street and provide opportunities for landscape screening. The
proposal is further not consistent with Council’s standard drawing for residential driveways which
seeks to limit the maximum width for a duplex to 5m which may widen to 6m at the property
boundary.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
The application was previously decided by Council officers under delegation.
Finance & Risk
It is premature at this stage to advise on the likely prospects of the appeal. There will be costs
associated with defending the appeal.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
Nil
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 35 of 95
Section 36
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Attachment 1
Page 36 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Noosa Council documents Attachment 1
» 7 Legend
2 st ede APPROVED PLANS b | basin
' Neighbouring Building MCU17/0046 & OPW17/0160 ee
IS yosedet NOOSA COUNCIL wh window hood
RL2055109 | 8 NOVEMBER 2017
Frezest
RL 29.19 tog
403 2,454 12,020 — 6,835, 7.445 6,494
wy
7.5m 26m 25.5m 25m 245m 24m 23.5m 23m 22.5m 22m 21.5m 21m 205m 20m 195m 19m 18.5m 18m 17.5m 17m 16.5m
7s Ue dered) Sa aT Kan mR LT
L eee) v A pe iid Eth MU UCU UUUUUU UU UU COU UO UU UUBU LOUD UUU UU oe
SS —_ Re FUP UNF UNE UN FOS wie if ‘ =o ‘ siagoty
Lo WR Vt ae NNT Se SE MEE SE EE ge
AROS : ow MM x Mmm lu lk: HE TE ares
| be a eee SS SE ee
at eS 1 Line or r00/beIoW SSS SSS ee | | = AC
Nc | iow SSS tah
ie HA I) WH _—_————_——— \_ SS (| prot “1
ry ‘ ry sve WI SS ,—FEn——— po et 1 . 4
\ 14 a FE ry | I “ [ o See
| | oe : tl $$ _—— 1 ” Se
— SSS qh SSSSSSSSSSSSSS55
| B Hl le SS SSSEEEZS|Z eA HQ = SSSSSSS"" :
» « S€llllliee 0 SB SS OS ——_————————
wy m TH abn plat _———EESEE————————————— . 1 | FE ii,
oC
| bot H II IA SSS ff A BLL =aaaa2["= C= ee
* driveway A SST 3 i__--_J :
| . . ass SS . aS |__| pavementbetow i a 2
fl) | | Sess — ie — | - iineancannannnnagagriasniinnninitan tiie ane
| ] 1 — ee tt Peo ee SE TEES yagi aaeete
gstete | te RI Aa ee es, HOA AF MOHAN
a a nS oot 3 :
27m 26.5m 26m 255m 26m 245m 24m 236m 23m 22.6m 22m 216m 2im 205m 20m 195m 19m 185m 18m 175m 17m 165m 16m 155m 15m _ 145m a
| >
Roof Level | — - - verandah
° FFL 22.99 (L1)
FFL 20,37 (L2)
2 <—— ridge RL 29.26
2 Neighbouring Building
SCALEBAR (OU
1:100 Om 1 2
- t
NOP tra 53.00. 1054 noosavite dc 4566 ssn copy Dna oN Roo
ARCHITECTS S20 mrs Somuiomenses «© f Seamemimmmmio ey | eae EET (7) cums = OAD
Ob son Geiss 10 air eutvorty Amendment List Client Project No Project \\_ Date Scale Revision
Version: 2, Version Date: 08/11/2017 Print Date: 17 August 201€
Page 36 of 95Section 37
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 37 of 95
Noosa Council documents
2 — + } Legend
8 31.63r00f - : : b basin
& Neighbouring Building fot gelumn
: fgets — APPROVED PLANS ve ion
eames MCU17/0046 & OPW17/0160
— vera NOOSA COUNCIL
8 NOVEMBER 2017
RL 78.19 10g
“NW)-
7.5m — 26m 25.5m 25m 24.5m 24m 23.5m 23m 22.5m 22m 215m 21m 205m 20m 19.5m 19m 18.5m 18m 17.5m 17m 16.5m -
y \ 5 a) > i - > tanks ae aA RR ot a PY a a Sg i ag Sake a a “te te SS att i len atin
mM ee s [aia (SRR ae TT enomonnion maa me ase da
L i “x . 4 < SAWN FS pin hi iiih ALL SoU NJUU UU su OUU SIU LO uuu UPUOUULUUUUUUD OW.
‘eae cae i ated | eo = iu ME TE ET Oe ing
H “VS ai ug \ s = 14, o. bow | he Eh ae a ag | say okt ht ve ee ht hs we bo ge ene baw ht hts! bsetback |
| | dy; H a ee é x Cm ; _ ea sss SK EE OF i
\\f “+H + —\, —_ - 1 _,. RAPA HE IM) - | - — - —- — - — SSS | —- Aaa SS ee >,
H = | roof below SEE js ew Fe 155
ans : we SSS ee | uv ~- aks ™
| . Soe sese if \ SSS iy Uc { &
i | | q 7 \a | ih 7 pool below \4
| yo fn 1 aH ig Oo SSS rts vi
pein H j enc / [_ ss i i
t t i] ISB A EH > See 1 At 2
| es LE = _——SSSSSSSSSSSSS eye ;
my sw), a & {tock RB on
ul 8H 7 iM EE 17 i (xe)
| oS ws = oH SSS rv = _
ey HE | wae s SSS im 4p»
Ba 4 | nN P 5S=SSSSSSSSSSSSSSSSSSSSSSSSSS==
vy a/c? = Hi . CS ee } 5
my 4 Hi : I ! y | neck \ 3
H Bl |= . \ _ ! rm ‘o
4 <Q SS_—=—=—l=="" , °
a| = 7 =H i 1 q OS —_————————————— 4 3
} 4 4 HE i a ee q S
ce H il 1 SSS rt i 5
“ene ce 4 . ————————— Wo ave 3
gf: Ye —— TEE al) ' S| pave bow 3
ie) A oa pavement tow Deeper: sy ipaipipeaaa ! ae ete Z Om sack
E Ti Ho is TT aed TT TT | lag
| if fn cor rr en aa ann ty at f Trot! DTG! vgouUdG wooo UUuUpU uo DUB UEBoT
b Me Sg Oe l f-----tegg == 3-5 = ! ; i : \
Nee JlaF 73 Se ee ee i ak ETT I RR eT EAE AVIS
E ~ ; We, \ \ Sy \ acs
27m 26.5m, 26m 25.5m 25m 245m 24m 235m 23m 225m 22m 215m 21m 20.5m 20m 19.5m 19m 18.5m = 18m 175m 17m 16.5m = 16m 15.5m 15m 14.5m
Line of screening device PS
under, plantings under 4 SE b
Street & Unit 1 Living Level ] ~ — verandah
1100 FFL 22.99 (L1)
FFL 20.37 (L2)
2 ‘<— ridge RL 29.26
: Neighbouring Building
SCALEBAR (Od)
1:100 Om 1 2 5m
- Drawing Tite
NOF mai . pro box 1054 nowsavite dc 4566 COPYRIGHT: This drawing is copyright C Visitor Carpark Details Added 06/11/17 Lyndon —N Street & Unit 1 Living Level
ARCHITECTS seo sors wien aactetactmea ——-A_beeopmemappicaion ese” Toor? |g ygutpment 418000 opp Crescent Z cctover2016 «1100 @ AS «DAS
DoctiMeMe tees abn: 62119989 188 ‘heir autherity Amendment List Client Project No, Project _ Date ‘Scale Revision Drawing No.
Version: 2, Version Date: 08/11/2017 Print Date: 17 August 2018, 11:22 AM
Page 37 of 95Section 38
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 38 of 95
5 § a
4 28855 15 aA WA we * 2S Séls
J ees Wales sO
S| 2.828 i a) if : ie Pg Si
fe eel MAB SK Eos
fe x! 1 =3 5 8 %
a x : . } DB asi?
FS | | le wr 8 TE
Pos | | : I | = 3
° eo . Nee Ze - |F al
te / = a|"
ae rosie OF :) #F
Q24b ae ST 5 ok | EE 5 z
Z558 i Me FT aso 42 .
aOOw 192 ’K| oogibe Ee -
0302 bo WS ies zi!
yeos VD shea é + Ep AWS :
cose, Fa fe :
eS3s| sh I oe °
abze =) } h if ! oes
> © po i 33 Be | a f
9 thy, gees Eb
de eee | 2
2 ye==> | ep ye N)
S isk 135 r lg 7
so ear | | 2 #8
oa =e a i | | | a Eb 4 ~ Wy
3 Si ee “| 3
fe—=5 3 ig: G2 Pt
= ae I Fae? “O$
Fr :| aA 3 lane y--L LJ g ©
A ' Ht x
a i oe FF mowtannmone || ¥i* g2 9
a ik. | Sees mmcas| | | |_ Me! ig
_ E|s I ae , - i .
r = 8 B— ie -5 yy 1 >
- f “ie Tl Meu x: a
se . a8 Ke 4 ne VE ae" Te
Dip ea | Huy. ©. ty. .¥ is 5
4 1 1 1 40 0 725 1670 1455 177 -1
5 1 1 1 40 1 725 1809 46 38 0 g|3
5 1 1 1 40 2 811 1814 37 23 61 $s!
5 1 1 1 40 3 879 1813 34 9 56 tot
5 1 1 1 40 4 999 1768 26 62 47 uy
5 1 1 1 40 5 1057 1773 34 15 34 i
5 1 1 1 40 6 1124 1763 165 42 13 ier
5 1 1 1 40 7 1366 1758 26 33 63 i=
5 1 1 1 40 8 1494 1766 7 5 53 A
5 1 1 1 40 9 1699 1703 52 65 0 a*
5 1 1 1 40 10 2167 1670 13 37 14 5
4 1 1 1 41 0 724 1747 1222 117 -1
5 1 1 1 41 1 724 1847 15 13 21 2
5 1 1 1 41 2 805 1827 20 37 29 ts
5 1 1 1 41 3 958 1822 1 7 54 \
5 1 1 1 41 4 968 1830 39 10 23 oe
5 1 1 1 41 5 1019 1817 11 13 0 &
5 1 1 1 41 6 1141 1810 1 6 65 |
5 1 1 1 41 7 1362 1786 5 2 16 Mt
5 1 1 1 41 8 1470 1772 23 23 36 x
5 1 1 1 41 9 1706 1753 13 14 25 8
5 1 1 1 41 10 1781 1747 23 22 74 (a
5 1 1 1 41 11 1911 1749 35 3 28 ag
4 1 1 1 42 0 155 1753 1791 194 -1
5 1 1 1 42 1 155 1916 34 31 64 x
5 1 1 1 42 2 459 1880 11 45 0 E
5 1 1 1 42 3 725 1860 25 22 41 “I
5 1 1 1 42 4 833 1837 16 47 40 |
5 1 1 1 42 5 879 1837 1 33 91 |
5 1 1 1 42 6 911 1836 174 39 4 [J
5 1 1 1 42 7 1278 1775 34 82 29 1
5 1 1 1 42 8 1327 1827 48 12 28 ass
5 1 1 1 42 9 1534 1787 106 21 0 retort
5 1 1 1 42 10 1711 1767 40 74 0 ts
5 1 1 1 42 11 1781 1763 38 37 73 @)
5 1 1 1 42 12 1890 1753 56 43 35 Ae
4 1 1 1 43 0 155 1763 2010 216 -1
5 1 1 1 43 1 155 1950 34 29 70 =
5 1 1 1 43 2 459 1926 11 8 36 z
5 1 1 1 43 3 724 1902 15 34 9 E
5 1 1 1 43 4 847 1870 180 38 12 =
5 1 1 1 43 5 1150 1860 102 2 54 ==
5 1 1 1 43 6 1343 1815 97 51 40 Bee
5 1 1 1 43 7 1445 1815 102 51 32 ey,
5 1 1 1 43 8 1565 1821 35 35 29 |p|
5 1 1 1 43 9 1602 1815 52 51 0 |
5 1 1 1 43 10 1884 1785 56 39 56 PSE
5 1 1 1 43 11 2145 1763 20 48 35 BE
4 1 1 1 44 0 155 1788 2017 255 -1
5 1 1 1 44 1 155 1984 34 59 28 2
5 1 1 1 44 2 728 1910 127 67 15 xe
5 1 1 1 44 3 894 1865 585 88 42 Toe
5 1 1 1 44 4 1566 1821 185 80 51 Hie
5 1 1 1 44 5 1911 1823 100 36 14 Se
5 1 1 1 44 6 2145 1788 27 40 28 |,
4 1 1 1 45 0 725 1843 1431 145 -1
5 1 1 1 45 1 725 1978 14 10 83 §
5 1 1 1 45 2 879 1938 146 46 57 ===
5 1 1 1 45 3 1571 1907 38 4 20 Ai
5 1 1 1 45 4 1661 1877 89 28 26 gg
5 1 1 1 45 5 1989 1861 17 4 9 s
5 1 1 1 45 6 2148 1843 8 14 40 i
4 1 1 1 46 0 155 1858 2017 222 -1
5 1 1 1 46 1 155 2049 35 31 75 O
5 1 1 1 46 2 724 1990 10 22 44 g
5 1 1 1 46 3 734 1985 14 42 67 |
5 1 1 1 46 4 789 1962 58 57 41 j'
5 1 1 1 46 5 880 1992 4 4 40 ;
5 1 1 1 46 6 914 1968 113 44 0 a
5 1 1 1 46 7 1139 1954 56 40 17 Sas
5 1 1 1 46 8 1305 1934 25 43 16 |
5 1 1 1 46 9 1343 1948 36 26 79 Be
5 1 1 1 46 10 1517 1931 3 27 33 I
5 1 1 1 46 11 1571 1892 86 58 35 hi
5 1 1 1 46 12 1701 1899 50 44 54 ag
5 1 1 1 46 13 1989 1866 17 48 93 3
5 1 1 1 46 14 2145 1858 27 47 54 ik
4 1 1 1 47 0 155 1902 2017 212 -1
5 1 1 1 47 1 155 2081 34 31 17 z
5 1 1 1 47 2 426 2091 18 23 22 2
5 1 1 1 47 3 725 2028 123 56 83 “AN
5 1 1 1 47 4 879 1998 83 66 10 nS
5 1 1 1 47 5 1139 1977 56 39 21 BoE
5 1 1 1 47 6 1318 1972 61 57 15 ee
5 1 1 1 47 7 1517 1949 52 49 6 Dei
5 1 1 1 47 8 1632 1962 119 36 17 ats
5 1 1 1 47 9 1989 1921 22 36 67 2
5 1 1 1 47 10 2145 1902 27 38 18 i
4 1 1 1 48 0 155 1941 2019 220 -1
5 1 1 1 48 1 155 2130 35 31 79 O
5 1 1 1 48 2 423 2116 17 21 37 §
5 1 1 1 48 3 725 2073 25 27 43 ~
5 1 1 1 48 4 808 2078 31 31 0 Ye
5 1 1 1 48 5 911 2048 101 42 0 |
5 1 1 1 48 6 1011 2044 34 50 0 F
5 1 1 1 48 7 1116 2026 100 30 52 =
5 1 1 1 48 8 1243 2011 45 47 64 all
5 1 1 1 48 9 1335 2036 18 25 0 Ml
5 1 1 1 48 10 1517 1996 27 33 47 We
5 1 1 1 48 11 1718 1988 33 27 24 48
5 1 1 1 48 12 1989 1959 17 35 89 3
5 1 1 1 48 13 2145 1941 29 39 17 5
4 1 1 1 49 0 155 1983 2017 210 -1
5 1 1 1 49 1 155 2165 34 28 65 9
5 1 1 1 49 2 423 2138 17 31 57 i
5 1 1 1 49 3 724 2094 160 45 45 ‘Was
5 1 1 1 49 4 914 2066 313 59 29 FO
5 1 1 1 49 5 1302 2036 148 77 31 nai
5 1 1 1 49 6 1599 2034 1 35 43 |)
5 1 1 1 49 7 1632 2034 1 35 41 |
5 1 1 1 49 8 1730 2008 21 43 32 Xe:
5 1 1 1 49 9 1989 1996 22 28 39 $
5 1 1 1 49 10 2146 1983 26 32 4 i
4 1 1 1 50 0 155 2004 2031 232 -1
5 1 1 1 50 1 155 2199 34 37 84 =
5 1 1 1 50 2 426 2176 18 24 79 2
5 1 1 1 50 3 725 2142 14 9 0 N
5 1 1 1 50 4 925 2124 57 32 19 Slr
5 1 1 1 50 5 1101 2097 94 28 41 TTT
5 1 1 1 50 6 1335 2063 9 61 80 |
5 1 1 1 50 7 1443 2066 7 40 0 s
5 1 1 1 50 8 1533 2078 3 14 22 No
5 1 1 1 50 9 1599 2082 1 10 45 a
5 1 1 1 50 10 1737 2055 14 17 13 5
5 1 1 1 50 11 1989 2025 17 28 84 2
5 1 1 1 50 12 2146 2004 40 44 5 te
4 1 1 1 51 0 133 2086 1842 203 -1
5 1 1 1 51 1 133 2181 54 108 0 Ei
5 1 1 1 51 2 423 2165 424 60 34 PAS
5 1 1 1 51 3 925 2103 558 101 42 ae
5 1 1 1 51 4 1599 2097 34 43 52 1
5 1 1 1 51 5 1741 2100 10 13 52 ae:
5 1 1 1 51 6 1964 2043 225 59 16 ped
4 1 1 1 52 0 155 2076 2034 218 -1
5 1 1 1 52 1 155 2268 34 26 38 i
5 1 1 1 52 2 423 2217 212 58 28 Po
5 1 1 1 52 3 725 2208 159 34 57 ye
5 1 1 1 52 4 914 2159 341 82 0 ip
5 1 1 1 52 5 1301 2123 235 64 26 a
5 1 1 1 52 6 1566 2127 54 42 44 a
5 1 1 1 52 7 1964 2103 11 38 0 ;
5 1 1 1 52 8 2145 2076 44 37 11 |e
4 1 1 1 53 0 426 2103 1746 195 -1
5 1 1 1 53 1 426 2267 9 31 5 od
5 1 1 1 53 2 626 2256 9 16 86 z
5 1 1 1 53 3 941 2219 31 27 47 |!
5 1 1 1 53 4 1183 2196 38 6 50 co
5 1 1 1 53 5 1226 2188 16 44 0 |
5 1 1 1 53 6 1416 2191 4 1 22 Per
5 1 1 1 53 7 1465 2185 35 7 38 TL
5 1 1 1 53 8 1705 2153 5 5 59 ‘
5 1 1 1 53 9 2162 2103 10 9 3 °
4 1 1 1 54 0 157 2146 1820 191 -1
5 1 1 1 54 1 157 2256 21 81 47 Ww
5 1 1 1 54 2 423 2280 17 28 17 $
5 1 1 1 54 3 797 2255 36 37 38 Ke
5 1 1 1 54 4 1107 2203 119 45 61 Di
5 1 1 1 54 5 1295 2189 231 65 4 Oa
5 1 1 1 54 6 1565 2173 36 49 32 Hi
5 1 1 1 54 7 1723 2174 28 23 55 58
5 1 1 1 54 8 1965 2146 12 31 34 ;
4 1 1 1 55 0 159 2176 2012 208 -1
5 1 1 1 55 1 159 2331 15 53 71 Ww
5 1 1 1 55 2 807 2295 77 23 25 Kw
5 1 1 1 55 3 1140 2257 80 50 63 A
5 1 1 1 55 4 1315 2230 14 24 55 |
5 1 1 1 55 5 1353 2222 134 37 15 a
5 1 1 1 55 6 1566 2223 34 25 43 ri
5 1 1 1 55 7 1730 2198 21 49 0 -
5 1 1 1 55 8 1965 2181 9 34 93 |
5 1 1 1 55 9 2135 2176 36 25 38 ai
4 1 1 1 56 0 142 2198 2033 249 -1
5 1 1 1 56 1 142 2346 47 101 30 ul
5 1 1 1 56 2 925 2310 164 14 24 ee
5 1 1 1 56 3 1084 2242 139 118 23 Be
5 1 1 1 56 4 1737 2237 14 28 29 i
5 1 1 1 56 5 1874 2212 1 36 52 |
5 1 1 1 56 6 2136 2198 39 36 34 a
4 1 1 1 57 0 155 2228 2020 237 -1
5 1 1 1 57 1 155 2409 34 56 65 E
5 1 1 1 57 2 724 2333 222 51 12 ‘Ae
5 1 1 1 57 3 1028 2310 290 53 27 I=L}
5 1 1 1 57 4 1384 2287 37 41 5 Ch
5 1 1 1 57 5 2136 2228 39 36 19 7
4 1 1 1 58 0 725 2256 1448 137 -1
5 1 1 1 58 1 725 2385 14 8 27 §
5 1 1 1 58 2 830 2384 18 13 0 hg
5 1 1 1 58 3 879 2381 67 9 12 yer
5 1 1 1 58 4 1005 2375 70 18 37 ===
5 1 1 1 58 5 1302 2319 224 41 19 Jager
5 1 1 1 58 6 1545 2309 12 67 19 |
5 1 1 1 58 7 1687 2307 64 14 24 ag
5 1 1 1 58 8 2141 2256 32 37 61 Wi
4 1 1 1 59 0 155 2276 2022 199 -1
5 1 1 1 59 1 155 2468 34 7 55 =
5 1 1 1 59 2 528 2442 23 16 0 “s
5 1 1 1 59 3 792 2408 32 30 49 wa
5 1 1 1 59 4 1111 2389 35 1 40 —_
5 1 1 1 59 5 1283 2349 25 47 0 °°
5 1 1 1 59 6 1371 2353 50 19 0 =
5 1 1 1 59 7 1599 2318 1 35 77 |
5 1 1 1 59 8 1632 2318 1 35 77 |
5 1 1 1 59 9 1730 2314 21 28 40 8
5 1 1 1 59 10 1963 2289 43 47 21 maa.
5 1 1 1 59 11 2136 2276 41 30 49 it
4 1 1 1 60 0 155 2299 2005 214 -1
5 1 1 1 60 1 155 2480 34 33 95 =
5 1 1 1 60 2 528 2453 26 50 23 i
5 1 1 1 60 3 724 2439 15 24 56 a
5 1 1 1 60 4 911 2403 35 36 49 pl
5 1 1 1 60 5 1301 2385 223 35 6 ey
5 1 1 1 60 6 1561 2366 190 27 29 aes
5 1 1 1 60 7 2134 2299 26 34 2 ay
4 1 1 1 61 0 543 2331 1650 171 -1
5 1 1 1 61 1 543 2486 11 16 77 z
5 1 1 1 61 2 727 2455 8 27 36 nN
5 1 1 1 61 3 839 2445 10 27 48 (i
5 1 1 1 61 4 944 2452 2 10 75 1
5 1 1 1 61 5 1135 2449 4 1 30 7
5 1 1 1 61 6 1255 2437 34 1 8 ~=
5 1 1 1 61 7 1288 2407 33 35 82 7!
5 1 1 1 61 8 1407 2416 3 1 0 Z
5 1 1 1 61 9 1585 2389 10 1 69 7
5 1 1 1 61 10 1656 2389 10 1 42 7
5 1 1 1 61 11 1733 2373 18 25 25 5
5 1 1 1 61 12 2134 2332 28 31 24 5f
5 1 1 1 61 13 2181 2331 12 10 0 g
4 1 1 1 62 0 155 2342 2031 209 -1
5 1 1 1 62 1 155 2518 34 33 96 =
5 1 1 1 62 2 775 2462 57 68 31 wy,
5 1 1 1 62 3 868 2435 78 75 33 *
5 1 1 1 62 4 1327 2421 50 40 31 a
5 1 1 1 62 5 1568 2388 82 67 28 dt
5 1 1 1 62 6 1737 2399 14 20 6 ‘
5 1 1 1 62 7 2144 2342 42 60 21 ee
4 1 1 1 63 0 155 2386 2035 235 -1
5 1 1 1 63 1 155 2556 35 65 47 9
5 1 1 1 63 2 725 2506 305 33 27 ‘owt
5 1 1 1 63 3 1327 2470 1 17 68 |
5 1 1 1 63 4 1342 2452 30 50 50 38
5 1 1 1 63 5 1631 2437 39 58 9 D
5 1 1 1 63 6 1741 2448 10 14 25 -
5 1 1 1 63 7 2134 2386 56 26 11 Bee
4 1 1 1 64 0 752 2463 999 120 -1
5 1 1 1 64 1 752 2545 107 38 15 ames
5 1 1 1 64 2 988 2522 27 35 31 =i
5 1 1 1 64 3 1261 2496 67 26 71 ONG
5 1 1 1 64 4 1737 2463 14 19 41 8
4 1 1 1 65 0 725 2508 950 100 -1
5 1 1 1 65 1 725 2585 40 23 33 ze
5 1 1 1 65 2 803 2585 9 10 0 *
5 1 1 1 65 3 944 2567 2 14 43 |
5 1 1 1 65 4 988 2557 42 26 33 2g!
5 1 1 1 65 5 1327 2530 1 5 0 f
5 1 1 1 65 6 1598 2508 35 11 8 eet
5 1 1 1 65 7 1674 2517 1 3 36 8}
4 1 1 1 66 0 155 2485 1596 209 -1
5 1 1 1 66 1 155 2636 34 58 46 5
5 1 1 1 66 2 513 2622 13 37 27 :
5 1 1 1 66 3 725 2595 123 47 10 tO
5 1 1 1 66 4 910 2598 73 26 25 NC
5 1 1 1 66 5 1272 2586 4 2 71 SG
5 1 1 1 66 6 1480 2531 153 35 16 GNGXG:
5 1 1 1 66 7 1729 2485 22 69 70 4
4 1 1 1 67 0 134 2554 1617 186 -1
5 1 1 1 67 1 134 2672 51 68 55 in
5 1 1 1 67 2 390 2661 13 49 10 P|:
5 1 1 1 67 3 725 2618 221 70 0 HAONIN
5 1 1 1 67 4 1327 2591 1 28 41 |
5 1 1 1 67 5 1566 2554 185 37 26 Oa
4 1 1 1 68 0 155 2559 1981 204 -1
5 1 1 1 68 1 155 2730 34 33 64 S
5 1 1 1 68 2 391 2712 12 7 41 5
5 1 1 1 68 3 725 2688 26 25 10 Z|
5 1 1 1 68 4 824 2662 122 42 26 ee
5 1 1 1 68 5 1327 2638 1 5 58 |
5 1 1 1 68 6 1512 2604 10 19 30 a}
5 1 1 1 68 7 1566 2602 1 34 38 1
5 1 1 1 68 8 1599 2602 1 34 59 |
5 1 1 1 68 9 1632 2600 119 37 30 (RS
5 1 1 1 68 10 1874 2582 18 29 68 g
5 1 1 1 68 11 2125 2559 11 33 0 g
4 1 1 1 69 0 155 2577 2024 219 -1
5 1 1 1 69 1 155 2768 34 28 46 S
5 1 1 1 69 2 815 2691 215 35 23 NSEC
5 1 1 1 69 3 1599 2650 34 10 51 Di
5 1 1 1 69 4 1729 2625 22 26 0 (s
5 1 1 1 69 5 1874 2613 18 24 64 §
5 1 1 1 69 6 2109 2597 43 23 85 gis
5 1 1 1 69 7 2161 2577 18 52 62 ?
4 1 1 1 70 0 165 2612 2018 239 -1
5 1 1 1 70 1 165 2795 14 56 38 oO
5 1 1 1 70 2 724 2723 222 56 0 EGON
5 1 1 1 70 3 1566 2673 68 35 38 Pp
5 1 1 1 70 4 1729 2665 22 23 0 SRRS
5 1 1 1 70 5 1878 2645 13 32 31 g
5 1 1 1 70 6 2109 2612 43 46 0 ¥43
5 1 1 1 70 7 2173 2613 10 43 22 |
4 1 1 1 71 0 143 2648 2040 220 -1
5 1 1 1 71 1 143 2825 44 43 70 cc
5 1 1 1 71 2 377 2828 16 11 43 aL
5 1 1 1 71 3 396 2805 35 41 52 20.55
5 1 1 1 71 4 434 2805 21 41 24 109
5 1 1 1 71 5 765 2799 57 5 12 pone
5 1 1 1 71 6 852 2794 20 3 25 tne
5 1 1 1 71 7 894 2768 37 8 25 SONS
5 1 1 1 71 8 966 2768 254 5 4 ONL
5 1 1 1 71 9 1244 2750 67 14 42 RO
5 1 1 1 71 10 1326 2729 27 39 41 log
5 1 1 1 71 11 1565 2722 68 9 39 rn
5 1 1 1 71 12 1729 2689 20 24 36 J8
5 1 1 1 71 13 1878 2678 13 21 58 5
5 1 1 1 71 14 2110 2648 73 32 39 ia
4 1 1 1 72 0 155 2675 2044 202 -1
5 1 1 1 72 1 155 2870 34 7 49 —
5 1 1 1 72 2 765 2807 66 14 0 Sundary
5 1 1 1 72 3 847 2797 80 18 0 133-2990.
4.742m 9E'OL .OCE7.8EL Arepunoq 3 $53 352
S : gM ny : Hae
2 : : & #8 eS bis
eo | | i & © i ue
S : i : . ou:
Z 3 ee _ =u Be
— — — 4
2 Se —__§ EBs
OO <=Bisc
4 7: we:
a>Section 39
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 39 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Noosa Council documents:
a Legend
s 31.63r00f b basin
g r col column
8 Neighbouring Building aes APPROVED PLANS we tet pat
FFL 2428 (L1) MCU17/0046 & OPW17/0160 wh window hood
mates ram NOOSA COUNCIL
mee 8 NOVEMBER 2017
RL 29.19 tog
27.5m 26m = 25.5m 25m 24.5m 24m 23.5m 23m 22.5m 22m 21.5m 21m 20.5m 20m 19.5m 19m 18.5m 18m 17.5m 17m 16.5m_
1 am 7 id tie. She MMT eee ee ner ttc
SRI AT TRIED TI at i errs oT ee ey RLM Alp eet Ma eS oS ae 2 = yeaa Rar ee Te
| E i FRR FRA WUVUUUUUU LU SC dee U0 UU UUBU UE OU SU UUUL US ou
| =| | ee , BN ew, wiv . P| (tes TP are aE Ss tas Ss = ? ar eae
|} bs AEE RN b Jo akg 77 | < e +S ed a i i i a
| BZD Fz Fre sR am STE Te eae ON 2h setback:
| | SSIS USES IMS Finnie _ . ol eS el
\ | 8 V4 =—, | Lpetaining |) | RN La4 !
i 4 COs | | 1 Riana B 155
| | fi ! inant ss i i
||| 3 f a / an ae .
| ; aa So wy ae (oe
| | | fl | K i Ls a . | grassbeow |) | ?
a Below ti be , }
| , Mi : G- : = my tert dom = \ xl t
sy @ iB I! | | 7 ene an? Po PS
v KS Ws 7 I J <{_snutors | | 7 (ne)
E n < c 1 SOS] Line of © ‘ x
| {y— F iW RL 19 a | jen ‘s +A)
| = lg 4 Se ip ik _ A 5 Hh 2
ig | 5 , Ai D : ' ; 3
| 8 y oe ae 0 :
| E if fF wl Hae Tae net As:
| laos are | 4 ae. > li ie
| j I ~ (PRIR' & Se
& | i we oy ae i ties ®
\| SAE eS eT Bi cen OS > eee 14 i
|| f a or ' ' ee a aed
| I KK ESZESIUODES toc sone LER - ernie aS:
| Zo TESIESTESTRSIA oe Ne. yy, tt cone TAT Aaa TO oT ret pan
} y t + pi fie martes tn view to beach ‘ a f 2.0m sefbac!
RSP OT pe aeaetttsttt ras mii 1 -qdebout oUt CUODo woDadG) wut vuvuddopo" G
| | ie iets. iste ete... ‘ & Byte we 4 amecaatemcenll’,
oe a, BERR TRIER ence PIA AE ee Mer Ee
| | 27m 26.5m 26m «255m 25m_—24.Sm_—-24m_—23.SmM_—-23M_—-22.6m_—22m_—21.5m 21m 205m 20m 19.56m 19m 185m 18m 175m 17m 165m 16m 15.5m_ a 15m _ 145m ie ~
| @)
Unit 1 Terrace & Unit 2 Living Level verandah
1:100 FFL 22.99 (L1)
FFL 20.37 (L2)
2 <— ridge RL 29.26
3 Neighbouring Building
———————
1000 om 1 Sm
- - Sioa Tae
NGF tat peter 1054 noosavite a 4566 ion — si Unit 1 Terrace & Unit 2 Living Level
ARCHITECTS 2S swwssteim Secatccenr fet ey | ae ewe sas (7) Sieg 2 DAS
be 8 SR RE Se emerceerruecs cota their autronty Amendment List Client Project No. Project \_ Date Scale Revision Drawing No.
Version: 2, Version Date: 08/11/2017 Print Date: 17 August 2018, 11:22 AM
Page 39 of 95Section 40
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 40 of 95
uU
cm
>
=
<
z za
<Q ps —S = 2
2 TT OOO ae 2 Re
ee g Gq)
aa gi — 3 m
sx > 4 ‘ =z
LS > ® . | =
sanz 8 I x 8 wv
og AG 3 3 3 or se'06 1a Oo
un Asepunog
Sleese weyly 0667.ceh HEPUT im a
Siea8eEF zs Poin erp I ton eNOS 3 =
chee “s OK
5 1 1 1 18 4 1537 763 99 57 6 NOOK
5 1 1 1 18 5 2078 790 12 18 66 :
5 1 1 1 18 6 2292 784 34 26 85 m
4 1 1 1 19 0 285 758 2041 114 -1
5 1 1 1 19 1 285 758 74 57 29 atte
5 1 1 1 19 2 592 768 17 49 46 a
5 1 1 1 19 3 732 788 23 26 39 Bb
5 1 1 1 19 4 850 801 100 26 45 ONION
5 1 1 1 19 5 1561 805 42 38 56 SK
5 1 1 1 19 6 1743 805 15 38 16 z
5 1 1 1 19 7 1958 819 10 43 24 5
5 1 1 1 19 8 2078 808 13 39 96 i
5 1 1 1 19 9 2292 814 34 58 31 4
4 1 1 1 20 0 292 808 2039 124 -1
5 1 1 1 20 1 292 808 82 55 32 ree
5 1 1 1 20 2 592 818 14 45 56 §
5 1 1 1 20 3 732 825 152 31 11 “QCOrn
DOR F ' ro)
ba ; OF Ne IONE 9
eR 2 | ON Ze
8 i Si ON 8 =
3 COIN PKS 23 =
t INK) N be
. KAN es 3 = 4
ih DOIG * mi
3339 Bo ASI CPSRON ONS SSNS ; ONG 3 m
TAO a
a FOR ne COD g =
He 5 KAN : AIS 3 z
-zo7 3! ; f S Kp & m
33% zeezTa oo) | \ os <| <A> 2 S. m
ny 2 ht | \ SASS 8 8 g 4
He BONG! Ege . . z
£23 we KA Se < IAS oD
iy | 38 1 PIO a3 & 2
: 2a | fF NEBSONONCE F .
- np Le A 89 @
bys E 318 kK] SX NOONE i. 5
2 RA Ne } | ‘ KZN RE
22 8 3| WA a | PRN & 2 >
i 5 3 INES ae 2
i é 3 | | |- 3 - MM SASS .
f 5 as Lesa DENNEN NONI $
Soa “a OND
ee 5 we 4 citation >) |. 34
z gh oF - whg- wh ? i ie :* Be =
Ss ee (m) | a = j— fe is Sie f af =
a) F AA AR AR <p. ~ o
sfc 3 3 < ae fe" N- ca =|
PE3s : : ss Po a eames ef) eee m
fEe8 = lg | ioe “ “4 == DTTTEn acae: GRR |. m
oS 7T7n f| Ul ie I / a eae 3 oD
ae GTR ane et ettastent ig 3 1 >! a, ©
a 2 sR pee | ~~ 7 8 ‘Coeah m
o 86s ye || |) SMR UE Tae a)
ps a i iT PAR Ei | at hye es
r=) gh ce Hale Aa toed |) Dee; °
° 3 ee ce | i | i 3 ae) 8 —_
=p aI ee | is | 4] Ny ites ©
ot 8; ek | eeebed tt eer |< >t
‘o A ae SST ef ee) / iL) eo =
a i al cet | (HIS eet een | (G22 TAR 5
9 gol CES pee ep Rae F32 YS
fi Ty fe aa || sxe Fon | Adie ese
3 Wy “= \ Br I
y a et aL ‘mil; |2332
co Le SS) Ae | ee fe): <B25
\ { ZS | | L Ie me Sao aie oe m2s oO
ae i ere aoe (ne —— a ee = <
fcc | ice 5 LA 3! Qe m
x Pele yee [Este
as ; al \ Q 2 WMA! SH
z rel ] SEE | Wy ceo 2G 0 7%
Rca ff | s € FELIX | eee
a etsy tH meri { 5 At Wicoaae 2 eQss
g 3 Ges | hy) ‘ = TOG
: ie Sy CN) hb SY 3
28 Fo Me et coal 3
“ a ipa \ I a
Bs l= = | | #3 ‘ ' nit “1 iy
m Seay \ \ \ li ‘| , ie
2 : a | bE WT gig ict
2 |S Bee apt pa
2 ° 3 CNY! IH Tel coe
alr | Che it , (ott igh Coe
| § | oC tee | rt i] aR Se ail
fl, S|» oe Da eg aon ee te it fe HPL 3
pe ® = Oe se g 3
z 8o a | oe {3 Di i g
2 8 Bs | / | [ce
8 3 Ay | sys oe ee
“li bi ? = Boundary 318°23'30" 15.089m @) @s 3 3
38 22] ¢ 3 YSection 41
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 41 of 95
Noosa Council documents
» Legend
8 31.63r00f b basin
a Neighbouring Building Oe
. ‘<—— ridge RL 31,93. we toilet pan
Fri 2628 (L1) APPROVED PLANS wh window hood
RL 20.55 tog voranaan MCU17/0046 & OPW17/0160
couse NOOSA COUNCIL
8 NOVEMBER 2017
RL 29.19 tog
NW
abs
275m 26m —-25.5m 25m 24.5m 24m — 23.5m 23m _22.5m 22m 21.5m 21m 205m 20m 19.5m 19m 18.5m 18m 17.5m 17m 16.5m a
4 RST SVRTC x oo poundary 48°22'0" 35.650m! DITA Zar rat RE TTT er Th rT Per Pa SRL Tn Hannon ach ‘unit 1
2m § | = VAS TIAA ZAP VAP TAT WATT HHL} ] RSI NOL beach
| | $ | ig fl eee Lint dde UU UUUUUU UU DUB UBUUDU UU UUU DUE UU UU UU DUUUUUUL |
\ | LRA ICE IIOP OLE ILI VLR as at hw La a ee on ono ’ a we 259
|| IWOOOLOKE6 OER OEE ees pe
| | a ii N 5 eV <7. 3 ww Vi |
\\ } hs POSER RASREEAIEE RARER RSIRPARBER SES iS] fl Et Tee aN ETE | — i - rF
| | | a t (ps iM = = 1 I : yy
> , \4 Ww ul | - >
| | By i ee WW 4 J tersow Ca
3 { { { yt pt | = q) 4
| | j | IGA SY SII ul =— boo -
|| o iA a | 27 grass pais a
|) | HEI) i Sy, “A i RL 15.38 Ve |
Ml ff ee wh if sn
| 7 { ES fa - A.
| , | HM eo a ee NJ (ne)
A = f SHE il —— - ~
Lay | | DIAS i af 4a)
- 5 SA DTS . 4 Se “
: ( KV MOOS Te:
§ { { | ! j a : > 17
g oA bah ws ik Ss Ye ;
| “© \ | VAT ITA 5
| | i a | H Ya i ming Fe
| PA ee Ng EH Se ae - we 2
} | Id > »| ea 5
bh f V4 3 — ab N
PSS WRK Nee —| “Wa:
in KYA VATA IC ABATE RIBIESASA KFA FR Cle Dt
| On BAY SMO AOL ANOUOTO Anas
PZ ERIN SLRS RSIS SSSR SYS a = re Ao A Om fg yo i
(RYZES FAVS) J ! j
| I —SYA. SY SVS Tv SIV SSID SOS “ = x By I SW \ 3 ot
| | bo IE nator soz 352050 PS Res ae HATE NTE
27m 26.5m 26m —«-25.5m_— 25m _—.24,SmM = 24m_—-23.5m—-23M_—-22.5m_ 22m_=—-21.5m 21m 20.5m 20m 19.5m 19M 185m 18m 175m 17m 165m 16m 15.5m 15m 14.5m -
| ©)
Unit 2 Terrace Level a verandah
1100 FFL 22.99 (L1)
FFL 20.37 (L2)
2 <— ridge RL 29.26
3 Neighbouring Building
wy
1900S Om 4 2 5m
NDF i sess cs covvnict tis onngisconngn tyadon “on Unit 2 Pool Terrace Level
ie: ment sation Revisions: \
ARCHITECTS Seat [email protected] role eudned, coped or ied wit A __bonalopnat Aopen sw ‘ou aroveriad J16009 *Sunthine Beach ( 7) October 2016 1:100 @A3 8 DA07
DoctiMEMCe eaten abn: 62 190.909 188 thelr euosty, Client Project No. Project _ Date ‘Scale Revision Drawing No.
Version: 2, Version Date: 08/11/2017 Print Date: 17 August 2018, 11:22 AM
Page 41 of 95Section 42
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 42 of 95
Noosa Council documents
Legend
green - glazing
eb marine plywood sheet with
cover batten
cu copper sheet cladding or
& op pagmicenebaden
3 t $ re flat render
| Dy rk screen aluminium batten
3 CAA stone _natural stone flooring/cladding
APPROVED PLANS | ~ff | shuter Sing ster
MCU17/0046 & OPW17/0160 | \ | Ye vertical board cadeing
NOOSA COUNCIL | =
8 NOVEMBER 2017 | | rewire.
| al Wy, od = 9 ly, | RL 32.245
a Se
a B se ee
| caer i 7
‘ EAN
| ANS ne | any we | g
| am a i i | j i i =| on | =
CPA me ee em
| | hak SKM, | athe, | Living Level
f ti mg yy —
Se Fa ~ ice |
f : 3 TEL el ~ ====| I al = i ; | _ aaa
sen ge — [roof pikes
neces a
NP 2b a rT 7 SEM, Baiting
We soi ST a g
wee LOE oe |
AVA eae = 3 : = | Hae,
he a i a || i ‘shoter — —— \a Ase
Builcing i Pe zl La ie
y Li at, rae
ls LE ee
J) EEE = = Ee eee
a Dhee || SS || E= = | a
ey Se) EO i :
poems | ee | | |) YY
tmate=ate| | |} |). ) i) | oo a
eer | tt | | tt | ele _— ye eee 20240
a Sale ak
ed | | Se S| |e = g
aC RSH Sete tet SJ = = Fee =! a
al ll | = _ : aod ec ee Terrace Level
- & ; Ilr yee Fives Soe RL 17.240
a ken Ae a eee sore ao Tee AS
Ue ee ~Tl mes tar - Wie Bea =
r A re) Et A _ by / PAE wl a
a mess Eee | | 1 Wp sn Sus 4
| ee f CNG == Seer
eS
mish fence 2m high to boundary toe
dashed
North-East Elevation
1:100
SCALEBAR [TOL eT
1:100 Om 1 2 5m
: Drawing Tie
NOP rai? pb 105s nossavne ac asee mapas ge aa = North-East Elevation
phone: 5485 3635 / 0411 633 797 Sapran cnmanteut one. B Development Application Revisions 07/06/17 eunecee 38 Park Crescent,
eens or mntgret archtecs com.au paternal cored cote i“ Daren Agen eae 1004/17 & TGV Ptylltd senee Seehion ome \ - } October 2016 1:100 @A3 B Dave
Version: 2, Version Date: 08/11/2017 Print Date: 17 August 2018, 11:22 AM
Page 42 of 95Section 43
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 43 of 95
: &§ [go os z
5 3% 3 es a? 8
3 Pos bs F $2 Silc
5 S82 .58 5S S| 5
3 ges g22 3 a (8
Psgit zedive ag «iS
tq i“ =f
£ SeeeSSletoss @ a5
Py 8 2 Ik
4 1 1 1 10 0 369 623 1869 28 -1
5 1 1 1 10 1 369 639 14 11 89 z
5 1 1 1 10 2 1158 634 12 17 0 \y
5 1 1 1 10 3 1704 633 23 16 68 S
5 1 1 1 10 4 2058 624 13 8 40 a
5 1 1 1 10 5 2131 628 19 13 46 2
5 1 1 1 10 6 2198 623 40 26 13 85
4 1 1 1 11 0 373 638 1865 69 -1
5 1 1 1 11 1 373 638 16 69 0 '
5 1 1 1 11 2 542 657 65 33 0 ie2!
5 1 1 1 11 3 1105 635 32 61 47 ge
5 1 1 1 11 4 1664 644 141 41 39 Bah
5 1 1 1 11 5 2132 643 106 35 28 es
4 1 1 1 12 0 369 665 1869 48 -1
5 1 1 1 12 1 369 686 15 21 51 S|
5 1 1 1 12 2 429 691 11 17 65 2
5 1 1 1 12 3 468 692 9 16 84 3
5 1 1 1 12 4 505 678 157 30 2 ee888eies
5 1 1 1 12 5 1063 681 36 28 52 Ce
5 1 1 1 12 6 1110 674 88 34 22 ea)
5 1 1 1 12 7 1664 665 141 48 0 SS55.0
5 1 1 1 12 8 2058 692 12 4 84 -
5 1 1 1 12 9 2131 681 19 16 84 |2
5 1 1 1 12 10 2224 677 14 25 73 z
4 1 1 1 13 0 1077 694 1160 39 -1
5 1 1 1 13 1 1077 712 16 15 28 ey
5 1 1 1 13 2 1119 704 40 29 7 i)
5 1 1 1 13 3 1172 711 12 16 20 pe
5 1 1 1 13 4 1667 703 23 30 54 nd
5 1 1 1 13 5 1703 694 24 31 89 =
5 1 1 1 13 6 1742 698 63 27 84 ZN
5 1 1 1 13 7 2178 703 59 18 12 23|%
4 1 1 1 14 0 1073 713 1135 45 -1
5 1 1 1 14 1 1073 727 68 31 18 Soren
5 1 1 1 14 2 1167 728 45 18 43 Ti
5 1 1 1 14 3 1664 726 141 23 16 aa5a
5 1 1 1 14 4 2061 742 9 12 0 “
5 1 1 1 14 5 2177 713 31 43 39 33
4 1 1 1 15 0 960 744 1232 44 -1
5 1 1 1 15 1 960 748 7 31 32 {
5 1 1 1 15 2 1081 757 25 25 58 iy
5 1 1 1 15 3 1664 759 25 20 85 a
5 1 1 1 15 4 1709 744 12 43 48 oO
5 1 1 1 15 5 1751 748 10 39 8 oO
5 1 1 1 15 6 1781 749 24 39 0 s
5 1 1 1 15 7 2058 755 12 8 0 %
5 1 1 1 15 8 2177 762 15 19 73 s
4 1 1 1 16 0 952 772 1240 40 -1
5 1 1 1 16 1 952 772 20 40 28 Ir
5 1 1 1 16 2 1074 782 32 19 30 4;
5 1 1 1 16 3 1248 789 4 10 48 i
5 1 1 1 16 4 1664 782 24 18 53 LW
5 1 1 1 16 5 1703 782 24 19 54 &
5 1 1 1 16 6 1742 778 25 20 87 O
5 1 1 1 16 7 2041 776 11 21 2 <
5 1 1 1 16 8 2178 784 14 12 73 =
4 1 1 1 17 0 966 790 1225 48 -1
5 1 1 1 17 1 966 806 8 24 54 \
5 1 1 1 17 2 1086 804 15 12 41 “i
5 1 1 1 17 3 1227 797 46 36 57 US
5 1 1 1 17 4 1664 792 141 38 20 >Socs
5 1 1 1 17 5 2026 790 26 44 18 ct
5 1 1 1 17 6 2178 800 13 6 37 ~
4 1 1 1 18 0 972 819 1099 52 -1
5 1 1 1 18 1 1087 833 2 29 39 Sy
5 1 1 1 18 2 1099 818 79 63 0 |||)
5 1 1 1 18 3 1233 831 46 40 47 za
5 1 1 1 18 4 1664 825 103 45 13 Osa
5 1 1 1 18 5 2040 824 31 32 77 38
4 1 1 1 19 0 978 853 1092 40 -1
5 1 1 1 19 1 1044 864 45 27 22 a
5 1 1 1 19 2 1197 882 1 4 39 |
5 1 1 1 19 3 1235 862 32 31 18 ey
5 1 1 1 19 4 1664 853 141 39 35 £806
5 1 1 1 19 5 2040 856 30 9 56 3
4 1 1 1 20 0 981 878 1227 35 -1
5 1 1 1 20 1 981 889 4 15 2 \
5 1 1 1 20 2 1087 887 22 12 95 =
5 1 1 1 20 3 1207 898 9 13 0 A
5 1 1 1 20 4 1664 878 141 35 43 anQz
5 1 1 1 20 5 2180 888 28 17 58 23
4 1 1 1 21 0 982 904 1226 48 -1
5 1 1 1 21 1 982 908 12 44 0 \
5 1 1 1 21 2 1189 913 52 32 54 =
5 1 1 1 21 3 1310 912 22 38 27 Af
5 1 1 1 21 4 1664 915 63 34 43 c=
5 1 1 1 21 5 1742 904 63 31 69 =0
5 1 1 1 21 6 2180 906 28 37 0 z
4 1 1 1 22 0 990 944 1202 30 -1
5 1 1 1 22 1 990 960 7 14 58 \
5 1 1 1 22 2 1224 946 45 22 60 Sy
5 1 1 1 22 3 1332 951 8 12 0 \
5 1 1 1 22 4 2181 944 11 24 80 3
4 1 1 1 23 0 601 990 741 39 -1
5 1 1 1 23 1 601 1006 2 4 16 ;
5 1 1 1 23 2 1229 990 113 39 29 Bey
4 1 1 1 24 0 613 1020 738 19 -1
5 1 1 1 24 1 613 1030 2 6 92 \
5 1 1 1 24 2 1000 1027 2 7 22 F
5 1 1 1 24 3 1228 1022 60 15 5 SASS
5 1 1 1 24 4 1336 1020 15 19 0 |/
4 1 1 1 25 0 1238 1040 91 40 -1
5 1 1 1 25 1 1238 1040 51 40 1 Yes
4 1 1 1 26 0 644 1081 749 58 -1
5 1 1 1 26 1 644 1100 12 26 17 *
5 1 1 1 26 2 842 1106 6 18 13 j
5 1 1 1 26 3 936 1087 29 52 27 i
5 1 1 1 26 4 1240 1081 31 41 43 es
5 1 1 1 26 5 1284 1084 29 25 60 =
5 1 1 1 26 6 1323 1100 23 16 38 ote
5 1 1 1 26 7 1390 1106 3 10 29 A
4 1 1 1 27 0 656 1117 1526 37 -1
5 1 1 1 27 1 656 1127 3 6 0 :
5 1 1 1 27 2 839 1120 14 34 89 \\
5 1 1 1 27 3 952 1129 10 10 47 8
5 1 1 1 27 4 962 1119 12 34 13 |
5 1 1 1 27 5 973 1119 7 34 13 I
5 1 1 1 27 6 982 1119 17 34 50 |
5 1 1 1 27 7 1248 1120 74 22 9 i
5 1 1 1 27 8 1394 1119 1 3 24 '
5 1 1 1 27 9 2177 1117 5 1 90 -
4 1 1 1 28 0 849 1139 1363 51 -1
5 1 1 1 28 1 849 1147 31 30 0 \\
5 1 1 1 28 2 886 1145 136 45 19 [4
5 1 1 1 28 3 1320 1150 9 12 0 q
5 1 1 1 28 4 2148 1144 1 13 16 (
5 1 1 1 28 5 2211 1139 1 3 16 )
4 1 1 1 29 0 692 1200 1520 46 -1
5 1 1 1 29 1 692 1218 3 8 91 \
5 1 1 1 29 2 856 1206 4 32 91 \
5 1 1 1 29 3 1014 1226 18 3 63 TT
5 1 1 1 29 4 1212 1200 2 46 59 |
5 1 1 1 29 5 1363 1226 2 2 58 i
5 1 1 1 29 6 1461 1220 3 16 36 1
5 1 1 1 29 7 2161 1213 51 18 20 258
4 1 1 1 30 0 703 1218 1512 41 -1
5 1 1 1 30 1 703 1244 1 3 0 Z
5 1 1 1 30 2 861 1237 7 22 47 i
5 1 1 1 30 3 996 1218 54 37 59 il
5 1 1 1 30 4 1356 1245 2 2 53 j
5 1 1 1 30 5 1469 1236 7 19 91 \
5 1 1 1 30 6 2164 1223 27 27 42 $3
5 1 1 1 30 7 2202 1231 13 23 0 F
4 1 1 1 31 0 715 1249 1476 47 -1
5 1 1 1 31 1 715 1270 4 8 92 \
5 1 1 1 31 2 864 1262 7 21 75 \
5 1 1 1 31 3 1212 1249 2 47 67 |
5 1 1 1 31 4 1363 1264 23 21 82 =
5 1 1 1 31 5 1478 1259 7 19 91 \
5 1 1 1 31 6 2164 1250 27 25 0 é%
4 1 1 1 32 0 148 1276 2043 60 -1
5 1 1 1 32 1 148 1290 42 46 41 co
5 1 1 1 32 2 867 1281 8 31 61 |
5 1 1 1 32 3 1311 1289 78 23 11 —
5 1 1 1 32 4 1467 1298 8 13 39 2
5 1 1 1 32 5 1485 1279 9 22 82 \
5 1 1 1 32 6 2160 1276 31 31 60 <3
4 1 1 1 33 0 156 1299 2167 49 -1
5 1 1 1 33 1 156 1333 33 15 35 =
5 1 1 1 33 2 871 1318 30 27 66 v
5 1 1 1 33 3 1212 1299 182 46 0 —=
5 1 1 1 33 4 2161 1306 30 32 0 ‘3
5 1 1 1 33 5 2204 1290 22 63 0 |
4 1 1 1 34 0 156 1326 2167 49 -1
5 1 1 1 34 1 156 1352 34 23 24 °
5 1 1 1 34 2 874 1344 30 23 27 W
5 1 1 1 34 3 1374 1343 22 23 74 =|
5 1 1 1 34 4 1510 1341 7 15 89 \
5 1 1 1 34 5 2161 1331 11 17 51 8
5 1 1 1 34 6 2289 1326 34 23 53 o
4 1 1 1 35 0 156 1348 2167 68 -1
5 1 1 1 35 1 156 1378 33 23 86 N
5 1 1 1 35 2 769 1392 1 3 92 \
5 1 1 1 35 3 877 1366 10 35 60 \
5 1 1 1 35 4 904 1369 4 32 6 \
5 1 1 1 35 5 1212 1348 2 68 83 |
5 1 1 1 35 6 1310 1383 21 1 95 =
5 1 1 1 35 7 1397 1373 4 32 0 {
5 1 1 1 35 8 1506 1362 36 39 80 X
5 1 1 1 35 9 2288 1363 35 42 72 5
4 1 1 1 36 0 144 1397 2179 93 -1
5 1 1 1 36 1 144 1413 40 77 36 rt
5 1 1 1 36 2 778 1417 16 46 0 .
5 1 1 1 36 3 1212 1397 360 62 28 Sm
5 1 1 1 36 4 2289 1421 34 23 27 ©
4 1 1 1 37 0 144 1442 2178 78 -1
5 1 1 1 37 1 144 1442 40 78 31 ra
5 1 1 1 37 2 795 1464 13 29 36 .
5 1 1 1 37 3 891 1465 30 30 27 |
5 1 1 1 37 4 1212 1456 2 45 93 |
5 1 1 1 37 5 1407 1460 4 23 32 |
5 1 1 1 37 6 1538 1458 46 29 0 er
5 1 1 1 37 7 2180 1451 31 45 20 a
5 1 1 1 37 8 2289 1446 33 23 31 8
4 1 1 1 38 0 155 1485 2177 70 -1
5 1 1 1 38 1 155 1514 34 33 91 =
5 1 1 1 38 2 817 1511 1 3 29 .
5 1 1 1 38 3 1212 1504 2 51 88 |
5 1 1 1 38 4 1310 1496 84 26 45 —=—
5 1 1 1 38 5 1538 1512 4 10 12 m=
5 1 1 1 38 6 2180 1485 152 50 28 a)
4 1 1 1 39 0 143 1538 2180 57 -1
5 1 1 1 39 1 143 1547 36 48 65 Lu
5 1 1 1 39 2 901 1545 30 32 43 \
5 1 1 1 39 3 1401 1539 21 33 76 =
5 1 1 1 39 4 1574 1538 24 32 57 Zz
5 1 1 1 39 5 2297 1538 26 23 0 o
4 1 1 1 40 0 155 1562 2167 50 -1
5 1 1 1 40 1 155 1562 26 50 26 Ee
5 1 1 1 40 2 906 1582 41 28 0 ie
5 1 1 1 40 3 1422 1578 4 29 49 \
5 1 1 1 40 4 1601 1576 8 30 0 4
5 1 1 1 40 5 2146 1599 62 9 0 we|
5 1 1 1 40 6 2288 1564 34 26 76 &
4 1 1 1 41 0 155 1594 2053 72 -1
5 1 1 1 41 1 155 1609 34 57 0 o
5 1 1 1 41 2 910 1614 9 31 52 |
5 1 1 1 41 3 1212 1611 2 50 65 |
5 1 1 1 41 4 1405 1594 125 47 20 io
5 1 1 1 41 5 1602 1609 49 32 0 \
lie
‘ Sa = = Tt he ae
e /— we eA ve
= y | Re a
- _ | lig mar Be
HH =e | An RE
38 \ Ha | a =3 ‘ 2 ; 58
eg \ az | #2 =! — aK j
+r ro | ar et , i \eSs gt 8
: F \ ie Vad 82 ee
; we sayy $f
< 1 | SAE )\ 33 7
' ® eed Loa ae:
9 Ss eC te _\\ i! 23
a= Oo my Sa est i.
g \ { | = i O @.\—) asl
‘ H\ f ae — AM: axe
g | Tl) Fg oy
FE 1] 6 i
Ww : 1 I 7 Ske
) | i 28
uJ \ l | ' SA Hes
ud \ a | . aul
| |! ese
\ | \ f} Peo
E ~y \ ‘it p— | 0 git
E i Oe an)
i 1 1 SS
= | t cM ma
5 a 2 TOIT =z
& 1 ef|
Oo ] P az I | 8
O } a | Wi ess 2
5 2 | | at
< . | Vy Heals
ul Sz | AEE: eyeihe
S | \| 8: a2g2t8
\ | el 23, £55 862
= \| aye Fa Eis
2 : A gle tide
cc | : Lael | 3 BEEBSALS
— es & ae rm > =
> | | H oo |i a / Btpe
a 5 mee: EP Ze veel [a2 3 “EE
5 8 2 (a sh xo ow 3
3 ; +. ee en E ERS
3 2 | Sut 00 000° ost | 5s = §
9 } \—_—_ . ze
za 8 Gas
> - as
z
<q
—_
aSection 44
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 44 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Noosa Council documents
~ oe Legend
eaey, _ green - glazing
=. a eb marine plywood sheet with
5 ~~ 22m, cu arate aang
is 0% tng metal sheet longline profile
z | a op opaque louvre blades
a re flat render
| io q Stone” natural stone Aooringiciedh
TS Sa shiplap natural shiplap cladding =
| Se, ~ om see
| OSS ve vertical board cladding
x wh window hood
| i ~~.
~ Roof H
| a Tne a ns if
~~ it
(<< Ti in L
oe ESE Po md,
' ; FETE 2
we se ggg lor bor for ajo le 3 me
gp | Keun === === — Sy
mA Fe refer visitor th “ rit pe =| Leal Sag
Oy j er vjeter euperk : 7 | i cu RL 28.120 oe >
— zi 3 {7 [j 5 Tost Pee Root Height \g
Sas 4a i == Sa A a eee Fee — 25840 \2
“Se aaa AE Se 5 ims...
Nee ESB ei = :
QS ne SS g |
2 |. eee test) a 5
(ae rth = hl ale he? Er 4
ZY TA Pt Se eS BOT ZO 5 Se! SS |
<LO] | /BS i eit SSS eT
is Svoaee. Ss ere | 1 || aia __Living Levet
Sy a baer == : i. TTT RL 23.240
i Phas GE eet | zee a .
a i (PEEP FF | sage eerienetecr ann uo | 4 | hn J Lame
de: SS ES AEA Ss fs. ~— e
_ (eae |i ae ea. P i
Te ESS < gh Bes = = J my |
=) eae : —— d
APPROVED PLANS a iy aay! L — Besmomtovet |
MCU17/0046 & OPW17/0160 | samba : / mam |
NOOSA COUNCIL Eze el eee ASS Bee i Fh gg
8 NOVEMBER 2017 <Q" 1 ees | ee bo l ce
~ Ul, Age 1 eS ES si rea Y ae
“Se Ce “ ST) re 20 |
ye. Oe le a To
NO) |) “SSS ee eeemetan WN || F
. “hel 28) | AAR En 1517308 4 hn
ae > | = DE 1 a Ve
~ SG Ay) Jl
2m high brush fence ‘
fetaing to Doundery
South-East Elevation shown dashed SCALE BAR EEX
1:100 1:100 Om 1 2 5m
: jistered archil - Drawing Title
NOF ra Pi bon 1084 noanvde 4566 coprmonn masmngcoran — & yurcapu aan aes BOT Lindon saruncraam, South-East Elevation
enrn eet ort rligrotarchtecscom au oa ee DF arn comemn ene; WADE & Tov Ptyllta arenes Sunshine Beach | ) October 2016 1:100 @A3 ee: Palo
DpckiMEMS centers abn: 621 ve ™ ea Ps — ee
Vesna 2, Version Date: 08/11/2017 — Print Date: 17 August 2018, 11:22 AM
Page 44 of 95Section 45
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 45 of 95
U
>
=a
<
za
ag Z ©)
aiken 8
a 5 9 $20
sax 2 m
Sait 3 =
sar 5 <
ganz 8 =
si ao % a
fpeete O
SlesaeEeg
“least é
Bigba
322805
seeeee m
oases z
Pall
5 1 1 1 21 2 2292 844 34 28 78 4
4 1 1 1 22 0 349 933 807 23 -1
5 1 1 1 22 1 349 933 8 7 66 2
5 1 1 1 22 2 395 939 11 16 8 8
5 1 1 1 22 3 1146 945 10 11 0 _
4 1 1 1 23 0 395 956 11 15 -1
5 1 1 1 23 1 395 956 11 15 43 &
4 1 1 1 24 0 1128 941 1198 87 -1
5 1 1 1 24 1 1128 941 27 73 5 Hi]
5 1 1 1 24 2 2292 957 34 71 57 =
4 1 1 1 25 0 342 1101 1984 41 -1
5 1 1 1 25 1 342 1115 55 27 43 Ae
5 1 1 1 25 2 2292 1101 34 26 81 m
4 1 1 1 26 0 342 1129 1984 47 -1
5 1 1 1 26 1 342 1129 55 47 29 2233
5 1 1 1 26 2 983 1158 9 4 26 4
5 1 1 1 26 3 1105 1145 8 13 69 a
5 1 1 1 26 4 2292 1132 34 26 87 m
4 1 1 1 27 0 340 1155 1986 53 -1
5 1 1 1 27 1 340 1155 54 38 49 HEE
5 1 1 1 27 2 2292 1175 34 33 96 =
4 1 1 1 28 0 356 1192 1970 48 -1
5 1 1 1 28 1 356 1192 41 28 42 giz
5 1 1 1 28 2 954 1192 33 25 55 2g
5 1 1 1 28 3 1218 1192 31 27 75 ae
5 1 1 1 28 4 2292 1214 34 26 92 =
4 1 1 1 29 0 357 1215 894 10 -1
5 1 1 1 29 1 357 1215 38 10 24 B2e
5 1 1 1 29 2 954 1215 30 10 45 va
5 1 1 1 29 3 1218 1215 33 9 77 25
4 1 1 1 30 0 372 1224 879 18 -1
5 1 1 1 30 1 372 1228 8 6 0 .
5 1 1 1 30 2 963 1224 21 18 54 6
5 1 1 1 30 3 1218 1225 33 13 87 giz
4 1 1 1 31 0 356 1219 1960 55 -1
5 1 1 1 31 1 356 1223 25 43 59 ui
5 1 1 1 31 2 954 1246 31 18 19 Se
5 1 1 1 31 3 1218 1236 33 32 44 3g
5 1 1 1 31 4 2288 1219 28 55 24 mm
4 1 1 1 32 0 357 1265 893 18 -1
5 1 1 1 32 1 357 1267 39 16 34 538
5 1 1 1 32 2 975 1265 12 18 45 a
5 1 1 1 32 3 1240 1269 10 4 89 2
4 1 1 1 33 0 357 1272 1969 46 -1
5 1 1 1 33 1 357 1280 38 38 32 iu
5 1 1 1 33 2 2292 1272 34 37 73 a
4 1 1 1 34 0 357 1306 772 23 -1
5 1 1 1 34 1 357 1306 35 23 25 e335
5 1 1 1 34 2 1005 1315 2 7 0 ‘
5 1 1 1 34 3 1096 1313 2 2 29 z
5 1 1 1 34 4 1128 1322 1 3 55 >
4 1 1 1 35 0 357 1315 1969 63 -1
5 1 1 1 35 1 357 1321 39 22 20 ns
5 1 1 1 35 2 994 1328 14 38 17 }
5 1 1 1 35 3 1022 1336 11 5 35 2
5 1 1 1 35 4 1057 1330 4 22 55 §
5 1 1 1 35 5 1113 1334 28 15 19 ad
5 1 1 1 35 6 1563 1332 84 33 96 boundary
5 1 1 1 35 7 2291 1315 35 63 12 S
4 1 1 1 36 0 344 1396 1982 53 -1
5 1 1 1 36 1 344 1405 26 44 13 i?
5 1 1 1 36 2 942 1408 16 28 39 =
5 1 1 1 36 3 990 1403 17 42 49 v
5 1 1 1 36 4 1012 1412 29 19 15 eS
5 1 1 1 36 5 1208 1403 26 33 1 1%
5 1 1 1 36 6 1245 1403 51 39 19 ee
5 1 1 1 36 7 1285 1402 33 34 21 ae
5 1 1 1 36 8 1496 1418 1 8 90 \
5 1 1 1 36 9 1690 1418 1 11 30 i
5 1 1 1 36 10 2292 1396 34 31 89 >
4 1 1 1 37 0 360 1428 1966 31 -1
5 1 1 1 37 1 360 1450 26 9 37 #7
5 1 1 1 37 2 942 1436 16 20 57 =
5 1 1 1 37 3 1003 1434 181 24 43 ay)
5 1 1 1 37 4 1211 1433 110 28 36 ees
5 1 1 1 37 5 2291 1428 35 31 35 Q@
4 1 1 1 38 0 344 1450 1350 32 -1
5 1 1 1 38 1 344 1450 40 32 37 a7?
5 1 1 1 38 2 941 1456 13 22 59 g
5 1 1 1 38 3 1008 1462 3 15 91 \
5 1 1 1 38 4 1113 1458 28 18 26 22
5 1 1 1 38 5 1209 1460 43 18 55 SY
5 1 1 1 38 6 1511 1471 1 6 76 \
5 1 1 1 38 7 1693 1468 1 10 74 \
4 1 1 1 39 0 344 1465 1982 43 -1
5 1 1 1 39 1 344 1483 42 19 46 588
5 1 1 1 39 2 942 1480 16 26 87 m
5 1 1 1 39 3 1005 1478 143 30 22 eae
5 1 1 1 39 4 1224 1477 19 7 83 =
5 1 1 1 39 5 2292 1465 34 26 87 m
4 1 1 1 40 0 344 1500 1369 13 -1
5 1 1 1 40 1 344 1502 9 5 46 -
5 1 1 1 40 2 942 1508 16 4 64 —
5 1 1 1 40 3 1003 1501 33 12 52 yy)
5 1 1 1 40 4 1078 1500 70 12 36 hes
5 1 1 1 40 5 1524 1506 11 5 0 ~
5 1 1 1 40 6 1702 1506 11 6 27 ie
4 1 1 1 41 0 360 1496 1966 47 -1
5 1 1 1 41 1 360 1501 24 42 0 uu
5 1 1 1 41 2 941 1513 13 23 35 2
5 1 1 1 41 3 996 1510 96 28 21 Essa
5 1 1 1 41 4 1288 1531 24 2 54 =
5 1 1 1 41 5 1502 1505 33 38 62 33
5 1 1 1 41 6 1696 1514 18 20 64 FY
5 1 1 1 41 7 2292 1496 34 28 89 =
4 1 1 1 42 0 358 1525 1958 44 -1
5 1 1 1 42 1 358 1535 27 27 16 g¢
5 1 1 1 42 2 942 1538 16 23 72 &
5 1 1 1 42 3 1003 1537 15 32 43 iy
5 1 1 1 42 4 1059 1541 103 21 20 cle
5 1 1 1 42 5 1503 1540 33 28 67 giz
5 1 1 1 42 6 1697 1539 17 29 38 ig
5 1 1 1 42 7 2294 1525 22 41 53 oO
4 1 1 1 43 0 360 1561 1966 31 -1
5 1 1 1 43 1 360 1564 25 23 36 ee
5 1 1 1 43 2 942 1562 12 26 72 $
5 1 1 1 43 3 1005 1564 210 22 20 PSS.
5 1 1 1 43 4 1269 1567 43 18 32 SH
5 1 1 1 43 5 1516 1565 21 20 27 es
5 1 1 1 43 6 1697 1569 14 13 64 iz
5 1 1 1 43 7 2292 1561 34 31 89 >
4 1 1 1 44 0 360 1585 1356 20 -1
5 1 1 1 44 1 360 1585 23 17 80 33
5 1 1 1 44 2 999 1585 122 21 65 Bere
5 1 1 1 44 3 1132 1589 16 15 30 =|
5 1 1 1 44 4 1505 1586 28 19 0 2\5
5 1 1 1 44 5 1697 1586 19 19 52 5
4 1 1 1 45 0 360 1590 1357 39 -1
5 1 1 1 45 1 360 1607 26 17 47 §?
5 1 1 1 45 2 1003 1608 49 16 32 —,
5 1 1 1 45 3 1078 1590 20 31 64 3
5 1 1 1 45 4 1117 1611 21 11 14 ey
5 1 1 1 45 5 1505 1606 33 23 0 5*
5 1 1 1 45 6 1705 1606 12 8 0 -
4 1 1 1 46 0 360 1620 1341 45 -1
5 1 1 1 46 1 360 1621 18 44 6 53
5 1 1 1 46 2 1003 1626 71 19 0 rca
5 1 1 1 46 3 1087 1624 52 27 42 See
5 1 1 1 46 4 1197 1637 29 16 49 ae
5 1 1 1 46 5 1301 1627 11 12 51 |
5 1 1 1 46 6 1447 1622 74 33 56 fy
4 1 1 1 47 0 360 1652 1343 49 -1
5 1 1 1 47 1 360 1682 26 7 51 as
5 1 1 1 47 2 994 1656 11 45 47 i
5 1 1 1 47 3 1107 1666 40 22 0 Bal||
5 1 1 1 47 4 1201 1652 25 34 51 aE
5 1 1 1 47 5 1520 1668 1 6 79 \
5 1 1 1 47 6 1702 1674 1 5 0 ,
4 1 1 1 48 0 360 1678 1341 27 -1
5 1 1 1 48 1 360 1690 26 11 71 ex
5 1 1 1 48 2 1113 1687 20 9 13 ae
5 1 1 1 48 3 1197 1678 8 27 29 Ss
5 1 1 1 48 4 1298 1688 14 12 0 1}
5 1 1 1 48 5 1700 1696 1 4 0 ,
4 1 1 1 49 0 360 1701 1340 28 -1
5 1 1 1 49 1 360 1701 26 25 16 58
5 1 1 1 49 2 1298 1716 1 3 30 a
5 1 1 1 49 3 1522 1720 1 9 28 :
4 1 1 1 50 0 360 1727 1965 42 -1
5 1 1 1 50 1 360 1730 26 5 0 —~
5 1 1 1 50 2 1298 1744 14 15 33 iI
5 1 1 1 50 3 1423 1727 21 42 0 ee
5 1 1 1 50 4 1523 1746 1 9 23 }
5 1 1 1 50 5 1705 1747 1 9 9 \
5 1 1 1 50 6 2292 1748 33 15 66 a
4 1 1 1 51 0 1120 1760 1205 36 -1
5 1 1 1 51 1 1120 1760 15 36 10 1}|
5 1 1 1 51 2 1298 1773 1 3 76 |
5 1 1 1 51 3 1525 1772 1 8 50 1
5 1 1 1 51 4 1705 1770 1 10 69 |
5 1 1 1 51 5 2292 1773 33 15 33 —_
4 1 1 1 52 0 1011 1794 516 15 -1
5 1 1 1 52 1 1011 1803 2 4 7 y
5 1 1 1 52 2 1110 1794 18 13 16 ae
5 1 1 1 52 3 1232 1796 1 3 63 |
5 1 1 1 52 4 1319 1802 10 7 17 =:
5 1 1 1 52 5 1526 1794 1 11 69 \
4 1 1 1 53 0 353 1775 1960 67 -1
5 1 1 1 53 1 353 1800 12 24 16 5
5 1 1 1 53 2 994 1812 18 11 14 Ve
5 1 1 1 53 3 1026 1783 16 48 82 |
5 1 1 1 53 4 1060 1775 52 65 44 (lk
5 1 1 1 53 5 1123 1809 50 22 35 ULI
5 1 1 1 53 6 1307 1807 5 23 49 |
5 1 1 1 53 7 1319 1810 24 17 49 33
5 1 1 1 53 8 1528 1819 1 11 75 \
5 1 1 1 53 9 1726 1819 1 6 72 \
5 1 1 1 53 10 2293 1804 20 38 57 wn
4 1 1 1 54 0 353 1814 1974 58 -1
5 1 1 1 54 1 353 1825 44 36 23 22.
5 1 1 1 54 2 1028 1825 30 27 51 Ls
5 1 1 1 54 3 1082 1831 60 29 14 ae
5 1 1 1 54 4 1156 1845 25 1 31 Trt
5 1 1 1 54 5 1196 1844 37 2 17 iT
5 1 1 1 54 6 1298 1820 46 41 40 [ae
5 1 1 1 54 7 1726 1839 1 11 56 i
5 1 1 1 54 8 2292 1814 35 58 25 mI
4 1 1 1 55 0 353 1848 1177 13 -1
5 1 1 1 55 1 353 1852 11 9 77 3
5 1 1 1 55 2 1021 1848 161 12 19 fe
5 1 1 1 55 3 1232 1852 1 4 65 ||
5 1 1 1 55 4 1310 1851 19 9 51 2
4 1 1 1 56 0 338 1851 1389 34 -1
5 1 1 1 56 1 338 1862 26 20 41 of
5 1 1 1 56 2 386 1858 11 17 41 33
5 1 1 1 56 3 989 1851 59 34 40 <=
5 1 1 1 56 4 1298 1858 47 25 23 ila
4 1 1 1 57 0 338 1858 1988 82 -1
5 1 1 1 57 1 338 1864 62 40 23 fede
5 1 1 1 57 2 993 1864 105 46 29 re!
5 1 1 1 57 3 1109 1858 66 82 69 ay
5 1 1 1 57 4 1298 1861 31 30 57 i
5 1 1 1 57 5 2292 1873 34 55 37 7
4 1 1 1 58 0 159 1918 2167 39 -1
5 1 1 1 58 1 159 1918 34 26 67 U
5 1 1 1 58 2 988 1918 57 29 38 ea
5 1 1 1 58 3 1082 1918 100 28 23 rere
5 1 1 1 58 4 1200 1927 33 14 37 ae
5 1 1 1 58 5 1307 1931 5 12 37 |
5 1 1 1 58 6 1532 1920 1 12 73 |
5 1 1 1 58 7 2292 1931 34 26 81 m
4 1 1 1 59 0 158 1932 2168 62 -1
5 1 1 1 59 1 158 1947 26 23 26 9
5 1 1 1 59 2 994 1944 17 21 11 ¥
5 1 1 1 59 3 1125 1932 54 46 39 ow
5 1 1 1 59 4 1532 1946 1 36 37 1
5 1 1 1 59 5 1724 1965 1 11 79 |
5 1 1 1 59 6 2292 1961 34 33 18 a
4 1 1 1 60 0 149 1961 1575 53 -1
5 1 1 1 60 1 149 1973 35 23 73 ©
5 1 1 1 60 2 338 1961 19 53 0 z.
5 1 1 1 60 3 995 1965 10 27 0 ‘
5 1 1 1 60 4 1133 1974 75 36 64 =|
oO Bg a | | \ \ Ww
|
> . 1] | | m
ol | , a
° pecererereerrerere bl 2 | to
= of at | i z °
‘o A | slo =
a f> an . za ©0
HF Shy, Zoi3
228 [Ba Se ee i ( 06oe%
nee a <o8
tHe SP, Bey y : t M>o °
Ze ae } 2 “i
f ae 00SOtttS—~—~S~S~SststSs Sin F Dorm
{ \ 9 undary m oO Oo | |
: py aouy
SESE
TPH 2G
2
2 oy 3
H
#3 ;
=o
as
Sh
= g
3 a
g® ,
rd
z @ =F SERS ERS 2 ¢ Ly
S S ge*s 3
3), = a
zie & b82a553e0%33 |
as gefi283% 29353 2
3) 8 elH elie
z|,_ 2 g gf! gee ¢
ig Bf gfe fist
gl\ie Fe ae ge z
> za $3 ¢) s 8Section 46
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
4 OPW17/0555 PLANNING & ENVIRONMENT COURT APPEAL NO 2760 OF 2018
DEVELOPMENT PERMIT FOR OPERATIONAL WORKS FOR SIGNAGE AT 4-24
GIBSON RD, NOOSAVILLE
DOCUMENT INFORM AT ION
Author Manager Development Assessment, Kerri Coyle
Environment and Sustainable Development
Index ECM/ Application/ OPW17/0555
Attachments Nil
EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 7 August 2018 regarding Planning & Environment Court
Appeal No. 2760 of 2018 and agree to defend the appeal.
REPORT
On 19 July 2018, Council at its Ordinary Meeting resolved to refuse to change conditions 1, 2, 8
& 9 of a Development Permit for Operational Works for signage for the Noosa Village Shopping
Centre.
The applicant had made representations to the Decision Notice seeking to allow:
All 3 pylon signs to be illuminated; and
Retention of the existing illuminated Woolworths sign and Reject Shop sign.
Council did not agree with the applicant’s representations, refusing to approve the changes to the
conditions for the following reasons:
1. The proposed changes will result in additional signage and illumination of signage contrary
to the Noosa Plan’s Advertising Devices Code.
2. The proposed changes will detract from the amenity and desired character of the area and
contribute to visual clutter.
3. The proposed changes are not legitimately necessary to provide directions and/or identify
the businesses location to residents and visitors to the area.
As a result of Council’s decision to refuse the representations, the applicant has now lodged a
Planning & Environment Court Appeal. The applicant seeks that the Court approve this
additional signage.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting, 19 July 2018, Item 2, Page 12
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 10 July 2018 regarding Application No. OPW17/0555 for a
Development Permit for Operational Works - Signage situated at 4-24 Gibson Rd, Noosaville and
refuse to change Conditions 1, 2, 8 & 9 for the following reasons:
Page 46 of 95
Section 47
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
1. The proposed changes will result in additional signage and illumination of signage contrary
to the Noosa Plan’s Advertising Devices Code.
2. The proposed changes will detract from the amenity and desired character of the area and
contribute to visual clutter.
3. The proposed changes are not legitimately necessary to provide directions and/or identify
the businesses location to residents and visitors to the area.
Finance & Risk
It is premature at this stage to advise on the likely prospects of the appeal. There will be costs
associated with defending the appeal.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
Nil
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 47 of 95
Section 48
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
5 132006.1395.4 PLANNING & ENVIRONMENT COURT APPEAL NO 2995 OF 2018,
REFUSAL OF EXTENSION TO RELEVANT PERIOD FOR 10 MULTIPLE DWELLING
UNITS AT 142 NOOSA DVE, NOOSA HEADS
DOCUMENT INFORM AT ION
Author Manager Development Assessment, Kerri Coyle
Environment and Sustainable Development Department
Index ECM/ Application/ 132006.1395.4
Attachments Nil
EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 September 2018 regarding Planning & Environment
Court Appeal No. 2995 of 2018 and agree to defend the appeal.
REPORT
On 19 July 2018, Council at its Ordinary meeting, resolved to refuse to extend the relevant period
of a Development Permit for Multiple Dwellings (10 units) at 142 Noosa Drive, Noosa Heads by a
further 2 years for the following reasons:
1. The development is not consistent with the Noosa Plan 2006 as the proposal exceeds the
maximum gross floor area permitted for the site and the proposal does not adequately
respond to the site’s environmental values.
2. Significant time has lapsed since the ecological assessment reports were originally
submitted and the information in these reports is now outdated. Updated ecological reports
have not been submitted. Review of the original ecological report also finds the report is
deficient as it does not satisfactorily address known koala movement through the site.
3. Significant time has lapsed since the water quality assessment reports were originally
submitted and the proposed stormwater drainage solutions are not compliant with the
current Sate Planning Policy for Stormwater.
4. Different bushfire hazard mapping to that used for the initial approval applies as the State
Planning Provisions came into effect after the original approval and result in a higher
hazard rating. The higher hazard rating may require changes to setback/buffer areas and
an amended layout. An updated bushfire management plan has not been submitted to
enable an assessment of the current bushfire hazard.
5. The approval is contrary to the Planning Regulation 2017’s assessment benchmarks for
development in koala habitat area as the development has not satisfactorily considered
safe koala movement measures and habitat connectivity values.
6. The community is unlikely to be aware of the proposal given the significant time that has
lapsed and no works have commenced on site.
7. If this request was refused and a further development application was lodged it is likely that
submissions would be received raising valid grounds of objection to the proposed
development’s non-compliance with The Noosa Plan given the site’s significant location
and environmental values.
Page 48 of 95
Section 49
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
As a result of Council’s decision to refuse to extend the relevant period, the applicant has now
lodged an appeal to the Planning & Environment Court. The applicant seeks that the Court
extend the relevant period.
It is in order for Council to defend the appeal and the recommendation is worded accordingly.
Previous Council Consideration
Ordinary Meeting, 19 July 2018, Item 2, Page 5
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 10 July 2018 and refuse Application No. 132006.1395.04 for an
Extension to the Relevant Period for Development Permit for Material Change of Use - Multiple
Dwellings (10 units), situated at 142 Noosa Drive, Noosa Heads for the following reasons:
1. The development is not consistent with the Noosa Plan 2006 as the proposal exceeds the
maximum gross floor area permitted for the site and the proposal does not adequately
respond to the site’s environmental values.
2. Significant time has lapsed since the ecological assessment reports were originally
submitted and the information in these reports is now outdated. Updated ecological reports
have not been submitted. Review of the original ecological report also finds the report is
deficient as it does not satisfactorily address known koala movement through the site.
3. Significant time has lapsed since the water quality assessment reports were originally
submitted and the proposed stormwater drainage solutions are not compliant with the
current Sate Planning Policy for Stormwater.
4. Different bushfire hazard mapping to that used for the initial approval applies as the State
Planning Provisions came into effect after the original approval and result in a higher
hazard rating. The higher hazard rating may require changes to setback/buffer areas and
an amended layout. An updated bushfire management plan has not been submitted to
enable an assessment of the current bushfire hazard.
5. The approval is contrary to the Planning Regulation 2017’s assessment benchmarks for
development in koala habitat area as the development has not satisfactorily considered
safe koala movement measures and habitat connectivity values.
6. The community is unlikely to be aware of the proposal given the significant time that has
lapsed and no works have commenced on site.
7. If this request was refused and a further development application was lodged it is likely that
submissions would be received raising valid grounds of objection to the proposed
development’s non-compliance with The Noosa Plan given the site’s significant location
and environmental values.
Finance & Risk
It is premature at this stage to provide advice on the likely prospects of the appeal. There will be
costs associated with defending the appeal.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes - Solicitor
Internal Consultation
Nil
Page 49 of 95
Section 50
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 50 of 95
Section 51
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
6 COM18/0263 PLANNING & ENVIRONMENT COURT APPEAL NO 2881 OF 2018,
ENFORCEMENT NOTICE ISSUED TO NOOSA AIRFIELD, LAKE WEYBA DVE & EENIE
CREEK RD, NOOSAVILLE
DOCUMENT INFORM AT ION
Author Manager Development Assessment, Kerri Coyle
Environment & Sustainable Development Department
Index ECM/COM18/0263
Attachments Nil
EXECUTIVE SUMMARY
Not Applicable
RECOMMENDATION
That Council note the report by the Manager Development Assessment to the Planning &
Environment Committee Meeting dated 11 September 2018 regarding Planning & Environment
Court Appeal No. 2881 of 2018 and agree to continue enforcement against Noosa Airfield to
address the current breaches of The Noosa Plan.
REPORT
In November 2017, Council received complaints about numerous trucks carrying fill material
travelling to Noosa Airfield.
The complaint was subsequently investigated by officers with a joint inspection of the site carried
out with State Government officers from the Department of Environment and Science. This
inspection confirmed that significant uncontrolled fill material (concrete and earth) as well as
builder’s demolition materials had been placed into the manmade waterway at a number of
locations. Vegetation had also been removed from Lot 2 RP160983 (the lot adjacent the airfield)
on the south-eastern side of the access driveway.
In response, Council officers issued formal notices to Noosa Airfield and its directors requiring
them to cease further filling and clearing vegetation, remove all unauthorised fill and other
materials and ecologically rehabilitate the riparian buffer area cleared of vegetation. Noosa
Airfield failed to provide satisfactory responses to these notices and accordingly officers issued
an Enforcement Notice in July 2018 after review by Council’s planning solicitor.
Noosa Airfield have now lodged an appeal against the Enforcement Notice on technical grounds
submitting that the notice is deficient, unlawful and invalid.
Page 51 of 95
Section 52
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
The map below depicts the area where the fill was dumped and vegetation cleared.
The photos below identify some of the unauthorised fill and clearing undertaken.
Page 52 of 95
Section 53
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 53 of 95
G6 40 €g abed
eT Ns 3 ay ne
oe oe a * ee r. >
y ; ro % eS a — awe
a Wes ga F e .
ae % et eee ome es al y t Jj
Pe = Roe A ij : “ 4 14 é
r : ae . ae -
ear , x >
- r i a - ee 4
ae ee = 2 2 gree al os eA <T
ae »
= Ath oe : ol a_- - — eta a
‘ a ie iy PL 1 te = Vf, le
7 Pcs in L . ni 3 = ae” A
= ae ; pa < ee
} ; ( Mi a a
as - fi i |e ae Fn
— welll Sina i
tt Tae ss CSL eee"
oe p tc i en < A * a
— 2 4 M
; \ 3 _ = y J
, ee
’ Ps ,
: ]
ar
7 Ma
: } y
? Pr iWe ; cad \ee
= eS SBE PEI Te ERO aS NS A SE © I oe I Oa TY San ee sO I
Sg PE Ve ee So ee Oe
Sa Re mg a Eo ge a Pee pie KG ee Ss theta Ose
a ne ee ee ee Po, Be Tem las SS Fo" 2 at aaa te LS Fo se <* aoe.
SES eet ae oe eee he Sg Ng 0 aie OR NOR on neg egret = SRS
; ~~ Bees ace oe Se en CA Roe emp a pelts te pteghe: Re eS =e
See Nes Gabi Pee SO aN 0 OR See ee eee
[Se semeneSieeeg ee Soe Se a NP FN rapa &
bel ee ie ee ee ee per EL ee ee pte ae Ye . om
Se AR alee Snes go Se ee Ae Seat a 8, ee ara Sete SROs pe pa Sieca hte a ene ae en ee
tine Oe Se per iy Re SMM ee eek RO ae Se rales ten oY aga ela pies ge ie Se
alt ps ty Sa a Se one MR se a ket pee ee RS A cn as ee ato OF
Ci ORR iy tin a SEER LR gr Ses bs ee eg eg a cis
ee ae ee es eo Steir rie ee oN Sere SF 4 Soo ae ae Ree
- a tit RI io Ie aera Da MR EN tee Sit TN St >
x, ee 5 Seen 5 hd ef ae oe pei re pera ee en SEA pega a al
ae me 0 ag ee Se wpe Fg eis pe ns
eas Sey eee a er a ran ee
: na . an GEE at I SAE ESTO ae Sieh all AAC og aE a
eines Sees, Fg ees ee La at ge ne ee Ne DA fe a ee :
bi eerie SO | he CREE Keer SOR WG rj ie eg 9
Fe eae eC ea a? in a rants . ! ioe ao eae Fagg Pn Ss ary ze = ;
_— re se egies Lm ow Pa Fag Qe ee
tial ._—" NO win a
8l0¢ YAEINALdAS Ih VONADV DNILSAW SSLLININOD LNAINNOYIANS 8 SNINNV 1dSection 54
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 54 of 95
© ‘ js bs i 4 a ; ad rf 48 ray a Gi lo
r y iy a Hews z 3 i ide Ts , ee , cay iA my oe ot ye BP 2
o
= Ba ae
N , es i ae ers, i me eas ‘ei ries Moy ae OR Bigs Wich} 5: °
E Pa NS i uh ae
wu tN g: 1 bo alg vee
= atte. OOS aa. Pe ” 3
Qo. WA Vie Py.
<x ai 5 Ie Gi 4 pee ie Pa ‘an hia “f Bae RE Pha ti +
ti
> ess ie se s é es sae Be a ee EN ETA B® p- td
a if ee, ‘ * 2% ay 2 yey Wi e a 3H Bers? : Ae y ry bs MT f o4r 2,
a Ome iam | * ; Fi 5 Bi ars The es Sn ky ¢
¥ y) - Sy Ls ‘ » 4 la aS gh i Cah oh am Ayes f Mag ope fe ae a
oO Aes hy ue : > : eae FY SER UE ig sgt RAAT By vie o
; Sy SN ae ‘ 3 $ ee awe ok See ¥ Nees’ Reh iad by oa
< rt aes - ay Fi wns BS cS Dok ae
q bf RR ks a : — po V3 See % A! Pilg ee Ser le iy ae Creal begs
2 /. bi Oia er ig Mae Ben en Ree ee gene
z= y a a io ae ri a ee 3 vet FA ay (te aes Bae ie
; PAN, Aes YS et We 1 ARR atl Re
tu ke ee ye, | aes ; eka Tee D: a Way freee, NT
S : f “NaN a BeaN in eS - PR 5 Si ? Yh ANS Mey he Pe a |
m4 : (| ate i B: Fe? te Sagres F . Se ae Bae AO Hiei,
Lu a “ ‘Ai i NaS ie eRe ind Re xt S OG ie pacar Ce ae te ey
Lu } aie * Pg aes me Ra fh Nee ‘a 3 a i ink city: Vas fe ¥ ae i fs Hae Sore!
la S| ae % Sh i “ AS ial Shae Nhat tae eae :
} ae Me t gece Wk + ee 5 , C eae a my ARE a gs a pete iad a4
EF oy ¥ Nae Set Sep a3u . i. seated Cae 3 Reis P' eh i a a
S £ py, F © se Pe e RY i oe Fis a ‘ OS bree , ee
a ( : : wg & wi a4 a ; ei a J Aes : ‘ S yo R $8 # a ; it %
= es : { % a Be ye Pie oe rear eae , , Pa a ch ‘ds ¥
me ab Se es Weg | ‘i : 1 iF <9 2
° nen @ VA B . iy Pas SR ao St ae ey ee 4 b a. \ i Hee Mo wis)
(y. vac saan ary Eke i wai AS. eg
= r Py ‘ | i 5 SH $ i z . eB 4 + ; 3 2 a . ‘hs Ss > c
TiN A Dg ‘ » by oh Ne BS". ae
5 4 . @ ee Ray wi re: 4 Py 3 ae Notte en Rd
2 . Wiese Bae. Cd ae a OE 3 eae:
Lu i gh . re x es é Nae fn x i) Ss a ey a eo
Ww ie i & i ae Yee he i 5 1 1 1 42 11 1960 1354 17 12 18 yi
5 1 1 1 42 12 2187 1327 7 3 0 *
5 1 1 1 42 13 2444 1276 2 4 34 .
5 1 1 1 42 14 2783 1208 20 38 0 ee
5 1 1 1 42 15 2851 1200 42 36 27 bs
5 1 1 1 42 16 2912 1196 33 24 53 ty
5 1 1 1 42 17 2998 1186 14 18 5 vi
5 1 1 1 42 18 3096 1157 69 31 0 apie
5 1 1 1 42 19 3188 1161 53 10 28 if?
4 1 1 1 43 0 461 1182 2775 449 -1
5 1 1 1 43 1 461 1625 5 6 16 i
5 1 1 1 43 2 1006 1525 4 5 22 f
5 1 1 1 43 3 1117 1519 3 3 0 ¢
5 1 1 1 43 4 1264 1484 20 16 35 a
5 1 1 1 43 5 1499 1448 2 3 54 j
5 1 1 1 43 6 1580 1414 64 40 34 Mags
5 1 1 1 43 7 1712 1421 41 6 33 fe
5 1 1 1 43 8 1975 1376 4 6 0 ;
5 1 1 1 43 9 2845 1201 106 44 12 Oe
5 1 1 1 43 10 2959 1205 47 16 24 By
5 1 1 1 43 11 3073 1182 163 28 30 Cae
4 1 1 1 44 0 162 1176 3056 528 -1
5 1 1 1 44 1 162 1657 13 47 50 5S
5 1 1 1 44 2 491 1627 6 4 25 :
5 1 1 1 44 3 995 1515 33 39 11 ha
5 1 1 1 44 4 1111 1528 32 11 20 st
5 1 1 1 44 5 1283 1502 3 6 13 oe
5 1 1 1 44 6 1311 1477 23 45 17 aa
5 1 1 1 44 7 1533 1440 25 47 15 We
5 1 1 1 44 8 1590 1454 3 3 31 es:
5 1 1 1 44 9 1624 1436 8 15 8 i
5 1 1 1 44 10 1756 1421 17 18 0 y
5 1 1 1 44 11 2407 1320 9 9 68 Z
5 1 1 1 44 12 2796 1246 12 17 39 «
5 1 1 1 44 13 2817 1223 66 45 33 fae
5 1 1 1 44 14 2922 1211 75 58 32 ye
5 1 1 1 44 15 3046 1213 32 18 0 mo
5 1 1 1 44 16 3091 1221 6 6 0 N
5 1 1 1 44 17 3116 1176 44 64 22 5
5 1 1 1 44 18 3178 1188 40 33 31 ae
4 1 1 1 45 0 155 1207 3046 526 -1
5 1 1 1 45 1 155 1705 34 28 42 z
5 1 1 1 45 2 420 1652 8 19 0 7.
5 1 1 1 45 3 1102 1550 48 32 0 ~
5 1 1 1 45 4 1226 1523 13 28 0 @
5 1 1 1 45 5 1257 1514 76 36 16 Ee
5 1 1 1 45 6 1380 1504 85 42 9 oe
5 1 1 1 45 7 1571 1492 2 3 16 fe
5 1 1 1 45 8 1975 1402 12 38 16 i
5 1 1 1 45 9 2449 1351 2 2 45 as
5 1 1 1 45 10 2802 1268 31 34 6 Be
5 1 1 1 45 11 2900 1227 198 63 24 Rec.
5 1 1 1 45 12 3150 1207 51 48 25 ae
4 1 1 1 46 0 155 1238 3079 532 -1
5 1 1 1 46 1 155 1738 35 32 56 5
5 1 1 1 46 2 1232 1547 191 39 30 Pee
5 1 1 1 46 3 1429 1495 201 48 15 Eas
5 1 1 1 46 4 1978 1420 180 36 46 =
5 1 1 1 46 5 2434 1375 2 2 38 |
5 1 1 1 46 6 2735 1303 90 42 30 Bee
5 1 1 1 46 7 2847 1263 267 74 33 Pa
5 1 1 1 46 8 3146 1238 88 42 33 Ne
4 1 1 1 47 0 382 1270 2854 463 -1
5 1 1 1 47 1 382 1724 2 4 41 7
5 1 1 1 47 2 468 1694 21 39 26 a
5 1 1 1 47 3 1121 1610 36 17 5 dae
5 1 1 1 47 4 1268 1599 1 3 0 é
5 1 1 1 47 5 1326 1584 17 10 42 ye
5 1 1 1 47 6 1407 1553 37 35 28 Aa
5 1 1 1 47 7 1486 1545 44 21 24 ae
5 1 1 1 47 8 1706 1530 3 5 0 :
5 1 1 1 47 9 1774 1505 5 12 54 |
5 1 1 1 47 10 1963 1494 3 2 20 1
5 1 1 1 47 11 2033 1474 9 3 3 «
5 1 1 1 47 12 2494 1386 3 2 58 2
5 1 1 1 47 13 2801 1339 15 19 43 ae
5 1 1 1 47 14 2936 1316 24 22 22 PN
5 1 1 1 47 15 2973 1316 57 13 1 Wiehe
5 1 1 1 47 16 3042 1304 11 6 17 fs
5 1 1 1 47 17 3090 1289 31 32 20 EN
5 1 1 1 47 18 3136 1290 5 10 8 \
5 1 1 1 47 19 3206 1270 30 24 46 ait
4 1 1 1 48 0 155 1292 3084 509 -1
5 1 1 1 48 1 155 1774 34 27 81 a
5 1 1 1 48 2 367 1727 13 49 0 io
5 1 1 1 48 3 427 1724 7 38 39 |
5 1 1 1 48 4 431 1736 42 20 41 ha
5 1 1 1 48 5 721 1707 2 5 0 ,
5 1 1 1 48 6 980 1661 2 5 90 \
5 1 1 1 48 7 1119 1632 18 11 29 i
oS : p » ‘a : b 4 5) Et i == \ Fe AN ike 7” BS. ds 5 eae)
oO ieee epee a es 4% rp bes Bie BOK.
za i » MY) 5 1 1 1 55 6 1377 1852 18 36 46 zy
5 1 1 1 55 7 1482 1840 35 30 7 Pune
5 1 1 1 55 8 1948 1791 2 2 0 ’
5 1 1 1 55 9 2077 1753 26 18 32 —
5 1 1 1 55 10 2141 1736 6 3 0 ™
5 1 1 1 55 11 2385 1699 6 12 50 ;
5 1 1 1 55 12 2490 1702 3 3 0 “
5 1 1 1 55 13 2902 1623 14 6 16 A 1 be WS ees
z Le. ma |e: ee a OT WR
< a: ‘ , ray “43 fe Atak j , : re ‘ ~ bat is
s ae i cs t \ i
oa ; i ‘ me :
a. ' Sa A Wann Fi . j a a eas
/ Bee Vasher § Wye s — ah i Phen
- eS aa i WB i ai 5 ; es et
“Aaa * k re a
* i % f y ‘ r a ss I f Cu Ze Wa ts
f PRB Ee kV Ae. a. } .f : > x
ae : 5 i a ome <i AY in Reg e
BRAIN ‘ ie ; aN eg Deny Py
; i? hp _ aa Bet
a i a ¢
: - 4 \ \ ¥ at se NH Cs NEES bi
4 a : ou { ae Ae (.
—\ KER
% a “f mS : , vi .
vv Oa re ay
Ae ASection 55
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Under the Noosa Plan filling where involving more than 100m3 or more of material requires a
Development Permit for Operational Works. Filling where involving less than 100m 3 of material
also requires a Development Permit for Operational Works where the filling does not meet
Column 2 of Table 14-52 of the Earthworks Code which includes the following requirement:
S6.1 The fill material is solid clean earth, free of putrescibles or refuse material, vegetation,
acid sulphate soils, building or construction material or other material or contaminants.
The fill is estimated to exceed 100m3 and is not solid clean earth. Council records indicate that
no Development Permit for Operational Works has been obtained for the filling.
Under the Noosa Plan, the area on Lot 2 RP160983 on the south eastern side of the access
driveway, which has been cleared of vegetation, is identified by the Noosa Plan’s Biodiversity
Overlay as being a Riparian Buffer and Environmental Enhancement area. Clearing vegetation
within the Riparian Buffer and/or the Environmental Enhancement area requires a Development
Permit for Operational Works.
Council records indicate that no Development Permit for Operational Works has been obtained to
clear vegetation.
Therefore, the filling and vegetation clearing was undertaken in breach of the Noosa Plan and
contrary to the Planning Act 2016.
During Council officers’ investigations of this matter, a review was also undertaken of the
development approval for the Noosa Airfield. This review showed that the original town planning
consent for the use expired many years ago and that a subsequent rezoning approval in 1994 to
Special Facilities was never completed despite correspondence by Council at the time noting the
Council’s concerns in this regard.
The present use of the land for airfield purposes involving the landing and take-off of aircraft and
associated facilities being housing, servicing, maintenance and repair of aircraft is therefore
unlawful.
This has also been brought to the attention of Noosa Airfield and accordingly the Noosa Airfield
were advised that under The Noosa Plan the use requires a development approval for a material
change of use in the Community Services Zone which is the current zoning the land. The Noosa
Airfield was also advised that if they intend to continue with the use of the airfield it will be
necessary to make a development application to Council.
Noosa Airfield have not provided any response to this land use issue and given the lodgement of
this appeal it is appropriate that this non-compliance be considered further and addressed. This
will be further discussed with Council’s solicitor for planning matters on how best to proceed.
Previous Council Consideration
Nil
Finance & Risks
It is premature at this stage to provide advice on the likely prospects or costs of prosecuting the
matter and/or proceeding to the Planning & Environment Court. This will require further
discussion with Council’s solicitor for the matter.
Consultation
External Consultation - Community & Stakeholder
Wakefield Sykes – Solicitor
Department of Environment & Science
Internal Consultation
The site inspection was undertaken jointly with Council’s Environmental Health Coordinator &
Waste Coordinator.
Page 55 of 95
Section 56
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Departments/Sections Consulted:
Chief Executive Officer Community Services Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service x Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture Environmental Services Disaster Management
Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 56 of 95
Section 57
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
7 CONSERVATION LAND GUIDELINES
DOCUMENT INFORM AT ION
Author Principal Environment Officer, Peter Milne
Environment and Sustainable Development Department
Index ECM/ Environment Levy
Attachments 1. Policy Guideline - Conservation Land
2. Policy Guideline - Revolving Fund
3. Policy Guideline - Private Landholder Conservation Partnerships
4. Fact Sheet – Conserving Land in Noosa Shire
EXECUTIVE SUMMARY
The Environment Levy Policy provides the head of power for the acquisition of environmentally
significant land and the delivery of the Voluntary Conservation Agreement (VCA) Program. The
Environment Levy Policy requires that high priority land parcels be identified for voluntary
acquisition or the VCA program. Through a mapping methodology the Conservation Land
Guideline identifies high biodiversity value land parcels that help consolidate and connect Core
Protected Areas (CPAs) consisting of National Park, Conservation Park, Nature Refuge and
Bushland Reserves. In addition, the Land for Wildlife (LfW) program supports private land
conservation efforts and is also included in the guideline. In summary, the Conservation Land
Guideline provides the mapping methodology for public and private land conservation programs.
The Revolving Fund and Private Landholder Conservation Partnerships guidelines provide the
framework and additional detail to support the implementation of the Environment Levy Policy
and Conservation Land Guideline.
RECOMMENDATION
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 11 September 2018 and adopt:
A. The Conservation Land Guideline provided at Attachment 1 to the report, which provides a
mapping methodology to support the Environment Levy Land Acquisition Program and
Private Landholder Conservation Partnerships Programs;
B. The Revolving Fund Guideline provided at Attachment 2 to the report, which provides a
framework to implement a revolving fund;
C. The Private Landholder Conservation Partnerships Guideline provided at Attachment 3 to
the report to guide the Voluntary Conservation Agreement (VCA) and Land for Wildlife
(LfW) Programs; and
D. The Fact Sheet - Conserving Land in Noosa Shire provided at Attachment 4 to the report.
REPORT
The Conservation Land Guideline provides guidance on the delivery of Council’s voluntary
environmental land acquisition and private landholder conservation partnerships programs.
Consistent with the Environment Levy Policy, the Conservation Land Guideline identifies and
prioritises land parcels of interest that can help consolidate and connect Core Protected Areas
(CPAs). CPAs are large areas of land under conservation protection consisting of National Park,
Conservation Park, Nature Refuge and Bushland Reserve. Noosa Shire has four significant
CPAs (see map 1):
Page 57 of 95
Section 58
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Cooloola-Noosa
South-west Cooroy
Woondum
Tewantin-Pomona (including Yurol-Ringtail State Forests)
Map 1. Noosa Shire Core Protected Areas (CPAs)
Page 58 of 95
Section 59
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Land that is located next to or within CPAs are potential land parcels of interest for conservation
purposes. The following methodology is outlined in the conservation land guideline to identify the
highest priority land:
Land parcels 30ha or more in size;
Located next to or within CPAs;
Have high biodiversity value (based on the Noosa Biodiversity Assessment Report 2016).
Before a particular land parcel can be considered for voluntary acquisition or private land
conservation, further detailed analysis will be required on a case-by-case basis. For example, the
land parcel may meet the key criteria however be weed infested, affected by future development
such as a road corridor or may be vulnerable to climate change impacts including sea level rise.
The Conservation Land Guideline further guides the categorisation of priority land parcels into
preferred public or private land tenures which may be suitable under the following programs:
1. Environment Levy Land Acquisition Program
The Environment Levy Policy provides the head of power for the voluntary acquisition of
environmentally significant land. Recent purchases include 25SP104706 on Cooloothin Creek
(106ha) for $2.7m and 115SP173075 Johns Landing (49ha) for $2.2m (70% funded through the
levy).
The Conservation Land Guideline offers two types of land acquisition models:
Land acquisition and retain in public ownership
The Conservation Land Guideline provides a mapping methodology to identify large land parcels
in the lower Noosa River catchment for acquisition and public ownership because of the
environmental significance of some of these land parcels in the catchment and the potential for
development pressure in this part of the Shire.
Note that other parcels of land not identified through the mapping methodology may be
considered for acquisition on a case by basis. For example, smaller parcels of environmentally
significant land located within CPAs and forming a critical link could be considered for acquisition.
An Environment Levy Working Group (ELWG) assesses land acquisition proposals and makes
recommendations to Council.
Revolving fund
Under the Environment Levy Policy land can be purchased, protected by Nature Refuge, and on-
sold (or parts thereof). This model allows expansion of the protected area estate in private
ownership to free up financial capital for further purchases. The Voluntary Conservation
Agreement (VCA) program has a similar outcome (i.e. private land with Nature Refuge or
covenant) however the buying and selling is managed by the private landholder. Because the
majority of levy funds are likely to be utilised for land in the lower Noosa River catchment, a
revolving fund provides a mechanism to purchase land parcels of interest in other parts of the
shire. There are three types of revolving fund mechanisms:
Purchase, apply a Nature Refuge dedication and on-sell entire parcel with a house site;
Purchase, subdivide for park purposes and on-sell house site;
Purchase two adjoining parcels, boundary realignment and on-sell house site.
Should Council approve the revolving fund guideline to progress a revolving fund program further
detailed investigation will be undertaken around the financial accountability mechanisms for a
revolving fund.
A guideline has been drafted to progress a revolving fund program (Attachment 2).
Page 59 of 95
Section 60
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
2. Private landholder conservation partnerships programs
Similar to the Environment Levy land acquisition program, the Conservation Land Guideline
identifies a methodology to identify land parcels of interest but for voluntary private land
conservation under the Voluntary Conservation Agreement (VCA) and Land for Wildlife (LfW)
Programs. VCA and LfW properties can play an important role in providing connectivity across
mapped biodiversity corridors as shown in Map 2.
Map 2. VCAs and LfW properties can help consolidate biodiversity corridors (in purple)
Page 60 of 95
Section 61
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Voluntary Conservation Agreement (VCA) program
Private landholders may voluntarily elect to place a covenant or Nature Refuge over their
property to ensure vegetation and habitat is protected in perpetuity on title. The VCA incentives
program was initiated by Sunshine Coast Council (SCC) which provided a rate contribution
and/or funding to deliver an Environment Management Plan (EMP). The VCA incentives
agreement terminates on property transfer. Council is contractually bound to honour VCAs set up
under SCC.
A Private Landholder Conservation Partnerships Programs Guideline (Attachment 3) has been
developed for new VCA’s. The incentives available differ from the original SCC VCA program:
A rate contribution is no longer offered
Support is provided depending on budget and/or resources as follows;
o Nature Refuge or covenant only, or
o Nature Refuge or covenant with incentives
Incentives are tied to the delivery of an Environment Management Plan (EMP)
Incentives are provided over a maximum term of 5 years only
Capping incentives to 5 years only will allow funds to be redirected to other eligible landholders
after the delivery of the EMP is complete.
The identified land parcels of interest for acquisition could also qualify for the VCA program which
may be a good outcome if either these parcels do not come up for sale or Council does not have
adequate levy funds in reserves to acquire. In addition, landholders who have properties in
Biodiversity Corridors (see Map 2) may be eligible for VCA or LFW and can be assessed on a
case-by-case basis by the Environment Levy Working Group (ELWG).
Land for Wildlife (LfW) Program
The LfW Program offers an alternative program for private landholders who want to be part of a
private land conservation network but may not qualify for the VCA program or may not want
stringent statutory protection over their land. LfW offers a lower level of protection than Nature
Refuge or a covenant. 90% of existing LfW properties are also afforded protection over part of
the property under the Noosa Plan Biodiversity and Riparian Overlay.
The Private Landholder Conservation Partnerships Guideline also offers two levels of support for
LfW depending on budget:
Level 1: Base level of support including a property assessment, LfW sign and a quarterly
newsletter
Level 2: As above but also property re-visits, free trees, nest boxes, workshops, open days
or other initiatives consistent with the intent of the LfW program
Eligibility for Land for Wildlife (LfW) is less stringent than the VCA program and applications are
assessed on a case-by-case basis. Eligible properties may also occur outside of mapped
Biodiversity Corridors (see Map 2).
3. Decision support tool and levels of protection
Figure 1 provides guidance on determining the most preferred and appropriate conservation
program for landholders depending on their location and priority.
Page 61 of 95
Section 62
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Figure 1. Preferred conservation program depending on location and priority
Figure 2 below shows the various conservation protection tenures, levels of protection and the
general investment required.
Figure 2. Levels of protection/investment for conservation tenures
Page 62 of 95
Section 63
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Previous Council Consideration
Ordinary Meeting Minutes, 15 January 2015, Item 6, Page 18
That Council note the report by the Principal Environment Officer to the General Committee
Meeting dated 12 January 2015 and
A. Adopt the Noosa Environment Levy Policy as set out in Attachment 1;
B. Endorse the development of an Environment Levy Guideline to guide the implementation of
the Environment Levy Policy;
C. Endorse the development of Strategic Biodiversity Corridor maps to assist with the
implementation of the Environmental Levy; and
D. Endorse the formation of an Environment Levy Working Group consisting of the Council
staff identified in the report minus the Coordinator Financial Services but including
Councillor Wellington.
Ordinary Meeting Minutes, 19 July 2018, Item 7, Page 14
That Council note the report by the Principal Environment Officer to the Planning & Environment
Committee Meeting dated 10 July 2018 and repeal the current Environment Levy Policy and
adopt the revised Environment Levy Policy provided as Attachment 2 to the report, authorising
the CEO to make minor amendments as necessary.
Finance
Apart from the Land for Wildlife (LfW) Program implementation of the Conservation Land
Guideline is financed through the Environment Levy and implemented subject to budget
availability.
Funding for LfW is subject to the annual Budget process.
Risks & Opportunities
The guidelines provide a clear and rigorous approach to guide the use of Environment Levy
funds for the purposes of acquisition or application of other conservation mechanisms suitable on
private land. There are however potential risks with implementing a revolving fund. It is not
always possible to predict fluctuations in the property market and placing an encumbrance over
land (i.e. Nature Reserve) may affect a property value on re-sale. Alternatively, certain buyers
place more value on a property with Nature Refuge status. A business case is intended to be
developed before entering into a revolving fund proposition.
The Conservation Land Guideline provides a methodology for identifying land parcels of interest
for conservation protection. Some landholders may be concerned that their land may be of
interest to Council for conservation protection. However, conservation measures are voluntary
and initiated at the request of the landowner.
Consultation
External Consultation - Community & Stakeholder
Subject to Council’s consideration, a public Conserving Land in Noosa Shire Fact Sheet
(Attachment 4) has been developed which will be available publicly to assist the community and
key stakeholders to understand the intent of the Conservation Land Guideline.
Internal Consultation
The Conservation Land Guideline, Revolving Fund and Private Landholder Conservation
Partnerships Guidelines and the Conserving Land in Noosa Shire Fact Sheet have been
reviewed by the Environment Levy Working Group.
Page 63 of 95
Section 64
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Departments/Sections Consulted:
x Chief Executive Officer Community Services x Corporate Services
Executive Officer Director Director
Executive Support Community Development Financial Services
Community Facilities ICT
Libraries & Galleries Procurement & Fleet
Local Laws x Property
Waste & Environmental Health Revenue Services
Executive Services x Environment & Sustainable Development Infrastructure Services
Director x Director Director
Community Engagement Building & Plumbing Services Asset Management
Customer Service Development Assessment Buildings and Facilities
Governance Economic Development Civil Operations
People and Culture x Environmental Services Disaster Management
x Strategic Land Use Planning Infrastructure Planning,
Design and Delivery
Page 64 of 95
Section 65
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Attachment 1
Page 65 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Attachment 1
| @ | NOOSA Policy Guideline
| @ | COUNCIL CONSERVATION LAND
Corporate Plan Reference: Our environment is protect, enhanced and valued by
the community
Endorsed by Council: Ordinary Meeting <DD Month, YYYY>
Guideline Owner and Department: Director Environment and Sustainable Development
GUIDELINE BACKGROUND
The Environment Levy Policy provides the head of power fo uisition of environmentally
significant land and the Voluntary Conservation Agreement m. In addition, the Land
for Wildlife (LfW) program supports landholders with c ation on private land. An
Environment Levy Working Group (ELWG) makes mendations ouncil on the best
mechanisms to protect environmentally significant la er these program
The purpose of the Conservation Land Guidelin provide a clear methodo! or identifying
land parcels of interest for either voluntary acquis! he VCA ‘am or the L ram.
POLICY GUIDELINE
Core Protected Areas and Biodivers sridors
Consistent with the Environment Levy P anservatio d Guideline is based upon the
principle of consolidating and connecting ote Areas s). CPAs are large areas of
remnant vegetation which consist collectively © 0 eady“tinder conservation protection
such as National Park, Cg on Park, Us efuge e hland Reserve. The larger the
protected area, the mg ance surviva ertain vegetation types and faunal species.
Fragmentation of ha places falinial specieéS iat risk of genetic isolation, predation by pest
species and impac' climate change.
Noosa’s four largest GPAs are Map d are Cooloola-Noosa, Tewantin-Pomona
(including Ringtail and Y e Fore Cooroy and Woondum. Map 1 also shows
mapped B orriddtS that help connect’CPAs via creek lines and vegetation networks.
The VG id LfW prepenties p an important role in consolidating biodiversity corridors.
Map § methodology lentify d parcels of interest
To con ate and conne' PAs, land parcels of interest are identified based on the following
mapping odology:
e Land locé immedia ext to or within CPAs;
° Land equal gre han 30ha in size ;
° Land parcels ¥ high biodiversity score (as identified in the Biodiversity Assessment
Report mapping).
The ELWG has recommended that land parcels in or adjacent to the Cooloola-Noosa CPA be
considered as the highest priority because of the potential threat of development in the lower
Noosa River catchment. A suitable land parcel is land that:
e Is located immediately next to the Noosa River or lakes;
° Is located on Noosa North Shore that connects National Park or Bushland Reserve;
° May have a lower biodiversity score because the main criteria for these land parcels is ‘threat
level’ and lower biodiversity score parcels are still considered a high priority for acquisition in
this area;
° Are larger parcels of land i.e. zoned Open Space Conservation, Rural Settlement or Rural.
Page 1
Page 65 of 95Section 66
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 66 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
POLICY GUIDELINE - Conservation Land
Core Protected Areas
& Biodiversity Corridors
Gympie Regional } F
be 3 om ; Ty
a G& LT
7 y |
2 y éo?\ j s
wae, ~\Yle 2
“ye Jf!
(a GY ~ F
4 ‘e af) * \,
f i, _s om. “ Hd , I:
fa j ; / fe : ! om:
1 NOR ee 0 oe ’ : li
psn IP” FS ea I
we * =) \. fe 7 at” “| a oe i
hee a U > > 5 Fan om
“\ mip aGitee he A I ae |!
; orp gous hse OS ee
> eS wo wh ie Jy, ~*~ ed Pe [3
eae iby. we sw xt =a f | Tee \i
, Oy Ry es ae fe icy pS
bE I EY
rae ¥ LA 4) eo AP. _f a ~ i
f of A eating a f } 5
| eee A
=<, ~e ty, ps Z E | 5
t / - 5
li
ae 5 SOON
1) ewantin - Pomona &
HEEB Cootocia - Noosa N i
1 viconsum A 3
HEBER veest cocroy g
Condos ee : ‘ ; . 18
Vaterways ;
[__] Local Government area wer. Copemte 8 .
Map 1 Noosa’s Core Protected Areas and Biodiversity Corridors
Conservation mechanisms
Apart from environmental legislation, Council has four key mechanisms to protect environmentally
significant land:
1) Land acquisition program-Buy and hold
Page 2
Page 66 of 95Section 67
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 67 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
POLICY GUIDELINE —- Conservation Land
A landholder may approach Council with an offer to sell their land. The ELWG makes an
assessment of whether the land meets the criteria under the mapping methodology. If so, an
assessment is undertaken for:
° Verification of biodiversity values and condition
° Investigation of encumbrances including weed infestation, future road corridors or impacts
from climate change such as sea level rise
° Assessment of funding opportunities for revegetation if the property is partly cleared.
Examples include grants, environmental offsets or carbon offset programs
° Suitability for potential Nature Refuge dedication under the Nature Conservation Act 1992
° Value for money: A potential purchase must also be ‘value for money’ based on a current
land valuation
The ELWG has recommended that land parcels in or adjacent to ooloola-Noosa CPA be
considered as the highest priority because of the potential t! f development (including
clearing for views) in the lower Noosa River catchment. Land in this area are considered
for ‘buy and hold’ under public protection and not recomme elling. After purchase the
land may be managed by Council as a bushland reserve ed’ to al Parks to add to the
protected area estate.
Land parcels that do not meet the mapping meth may also be con d on a case by
case basis. For example, a smaller land parc y have unique charact that warrant
conservation such as the last remaining populatio threate ecies.
2) Land acquisition-Buy and on-sell (Revolving fund
Similar to the land acquisition ‘buy and@old’ program land parcels identified through the
mapping methodology are suitable for a BU d on-sell pr ition (also termed a revolving fund).
Only the Cooloola Noosa CPA land pa a et suitable esale through a revolving fund
because they are identified as a priority E n and commended for the highest
level of protection through public ownership’
Under the Environment land (OF \ ereof), “may be on-sold with conservation
protection if there are adverse pacts to thé environmental values of the land. The main
mechanisms to do tk e:
° On-sell entire [an@yparcel: Th€ land parcel i rchased, dedicated as a Nature Refuge and
on-sold
° Bound alignme adjoining Ta cels can undergo a boundary realignment, one
pan sded dasa re Refuge and the balance parcel on-sold
° division: A la arce be subdivided for park purposes, one parcel is dedicated as a
ure Refuge and balanéé parcel on-sold
A Revol¥ und Guideline‘ia@s been developed to implement a revolving fund.
3) Volunta anservation Agreements
Private land co wation play an important role in re-connecting corridors between CPA's.
Council may ente 3 greement with a private landholder to place conservation protection
over their land (or pa eof). A covenant or Nature Refuge is placed on title to protect land in
perpetuity. Council may provide funds towards the costs of establishing the covenant or Nature
Refuge and may also provide ongoing funding support to deliver an Environment Management
Plan.
Land parcels identified through the mapping methodology are suitable for the VCA program. In
addition land parcels that occur in mapped biodiversity corridors may also be suitable for the VCA
program.
A Private Landholder Conservation Partnerships Guideline has been developed to implement the
VCA program.
Page 3
Page 67 of 95Section 68
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
Page 68 of 95
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
POLICY GUIDELINE — Conservation Land
4) Land for Wildlife
The LfW Program offers an alternative for landholders whose properties do not qualify for the VCA
Program or for landholders that do not want a statutory covenant on their land. The LFW Program
provides a support network for landholders interested in conserving their land and adds to Noosa’s
social capital of people involved in private land conservation. Based on popularity and area of land
cover the LFW program is Noosa’s leading private land conservation initiative.
Land for Wildlife offers a lower level of conservation protection than public ownership or private
Nature Refuge, however, like many other rural properties that are vegetated, LfW properties are
protected (or partly protected) under the under the Noosa Plan Biodiversity and Riparian Overlays.
Applications for LfW are considered on a case by case basis and suitable land includes:
e Land parcels identified in the mapping methodology
° Land in biodiversity corridors
e Land outside biodiversity corridors that meets LfW criteria id in supporting guidelines.
A Private Landholder Conservation Partnerships Guideline h veloped to implement the
LfW program.
Conservation tenure and levels of protection
In terms of safeguarding biodiversity, public owne Is considered mor re than private
ownership. It is not possible to determine the abse isk to biodiversity of eac ervation land
mechanism as it is subject to the intent of thé fanadholder ardiess of sta protection
provisions). Figure 1 below shows the various consé@tWation p on tenures, levels of protection
and the scale of investment required.
Common land conservation tenures
Public ownership (acquisition)
1. National Park ,
Highest YR OSE oa 4 Highest
ee NV aaa
4. Council freehold Nature refuge
protection y a cinnl-al 4
Level of
Private ownership
we 5. Freehold Nature Refuge (VCA or Revolving fund)
6. Freehold with vegetation covenant (VCA)
7. Freehold protected under Noosa Plan Biodiversity ee
Overlay (LfW)
8. Landholder goodwill (all tenures)
Figure 1. Common land conservation measures and level of protection
Decision support tool
Landholders may choose to voluntary sell to Council for conservation purposes or elect to be part
of a private landholder conservation partnerships program. Figure 2 is a decision support tool for
helping to determine the preferred conservation mechanism for landholders interested in protecting
their land through one of the conservation mechanisms.
Page 4
Page 68 of 95The text continues on section 69.