Original source · versioned page text
2018-09-11 Planning & Environment Committee Agenda
The original of this document is very large (18.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 SEPTEMBER 2018
a. a suitably bound surface that minimises the impacts of dust and noise on the
proposed development and the adjoining property;
b. dimensions, crossfalls and gradients in accordance with Australian Standards
AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant user class.
Stormwater Drainage
20. Stormwater runoff from the development must be disposed of on-site without causing
scour or damage to the subject site or any adjoining property.
Earthworks
21. All earthworks and associated batters must be contained entirely within the subject
site unless written permission from the respective landowner(s) is provided to
Council. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments.
Damage to Services and Assets
22. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
REPORT
1. PROPOSAL
The application seeks a Development Permit for Material Change of Use for visitor
accommodation in the form of 6 two bedroom cabins to be introduced in 2 stages. Stage 1
includes 3 cabins and should there be sufficient demand, another 3 cabins will be constructed as
Stage 2. The cabins measure 6.5m x 5.8m with a gross floor area of slightly less than 38m²,
consist of a saw tooth roof form and a covered front veranda. The external walls consist of
insulated sandwich panels which the applicant proposes to either paint muted environmental
tones or clad in a weather board type finish. The applicant has also indicated that window hoods
could be added. The cabins are less than 4m high. Figure 1 shows a typical floor plan and
elevations of a cabin.
Page 6 of 95
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.