Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-09-11 Planning & Environment Committee Agenda

of 95

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                           11 SEPTEMBER 2018


           a.    a suitably bound surface that minimises the impacts of dust and noise on the
                 proposed development and the adjoining property;
           b.    dimensions, crossfalls and gradients in accordance with Australian Standards
                 AS/NZS2890.1:2004 and AS/NZS2890.6:2009 for the relevant user class.
           Stormwater Drainage
     20.   Stormwater runoff from the development must be disposed of on-site without causing
           scour or damage to the subject site or any adjoining property.
           Earthworks
     21.   All earthworks and associated batters must be contained entirely within the subject
           site unless written permission from the respective landowner(s) is provided to
           Council. All earthworks must be undertaken in accordance with the provisions of
           Australian Standard AS3798: Guidelines on Earthworks for Commercial and
           Residential Developments.
           Damage to Services and Assets
     22.   Any damage caused to existing services and assets as a result of the development
           works must be repaired at no cost to the asset owner at the following times:
           a.    where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
           b.    where otherwise, upon completion of the works associated with the
                 development.
           Any repair work which proposes to alter the alignment or level of existing services
           and assets must first be referred to the relevant service authority for approval.
B.     Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.



REPORT
1.   PROPOSAL
The application seeks a Development Permit for Material Change of Use for visitor
accommodation in the form of 6 two bedroom cabins to be introduced in 2 stages. Stage 1
includes 3 cabins and should there be sufficient demand, another 3 cabins will be constructed as
Stage 2. The cabins measure 6.5m x 5.8m with a gross floor area of slightly less than 38m²,
consist of a saw tooth roof form and a covered front veranda. The external walls consist of
insulated sandwich panels which the applicant proposes to either paint muted environmental
tones or clad in a weather board type finish. The applicant has also indicated that window hoods
could be added. The cabins are less than 4m high. Figure 1 shows a typical floor plan and
elevations of a cabin.




                                                                                   Page 6 of 95
Log in to download the original file

2018-09-11 Planning & Environment Committee Agenda(PDF, 18MB).pdf · 18.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.