Skip to the record
The gold standard in government transparency.

Council archive · source document

Minor Change Existing Approval - 132008 176 07 (As Published) · 132008.176.07

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                       Page 23 of 31
Document Set ID: 24809674
Version: 9, Version Date: 27/05/2026


[OCR of page images]
2502-44623 SPD

 

 

 

 

 

Document Set ID: 24809674
Version: 9, Version Date: 27/05/2026

 

 

 

 

No. | Conditions Condition timing
of koalas on and near the construction activities.

(c) Be certified by a suitably qualified and experienced person.

AND

(d) Submit the Koala Fauna Management Plan to the Department of the
Environment, Tourism, aad Science and Innovation at
[email protected]

(e) Implement the management measures contained in the Keata Fauna
Management Plan.

3. | (a) Prepare a rehabilitation plan for areas identified as environmental (a) and (b) Prior to
management and conservation zone within Landscape Plan, DARFI | commencing any
Response Comparison, prepared by Richards and Spence, drawing clearing or
reference 2100014, Rev C. The rehabilitation plan must be prepared construction works.
by an appropriately qualified person(s), and must address as a
minimum: (c) To commence

(i). details of the rehabilitation objectives for the site: no more than 1
(i). the number of Koala habitat trees to be established on the month after the
site; completion of
(ji). _ the planting palette and planting density of the proposed clearing and
rehabilitation; construction works.
(iv). details of how the vegetation planted as a result of the
rehabilitation work will be suitably maintained. (d) Within 3 months
from the
(b) Provide the rehabilitation plan to the Department of the completion of the
Environment, Tourism, aad Science and Innovation at rehabilitation
[email protected] or mail to: works.
Koala Assessment and Compliance
Department of the Environment, Tourism, and Science and
Innovation
GPO Box 2464 15187 Bastase City East, Queensland 490+ 4002
(c) Undertake the rehabilitation of the site in accordance with the
rehabilitation plan;
(d) Certification by an appropriately qualified person(s) that (a), (b) and
(c) have been fulfilled, must be provided to the Department of the
Environment, Tourism, aad Science and Innovation at:
[email protected]
oR
Koala Assessmentand Compliance
DepartmentetGavirenmentand Science
SEL Si lhl cesar eens
4. | Deliver an environmental offset in accordance with the Environmental Prior to
Offsets Act 2014 to counterbalance the significant residual impacts on the | commencing any
State Assessment and Referral Agency Page 6 of 13
Page 23 of 31

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval - 132008 176 07 (As Published).pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.