Minor Change Existing Approval - 132008 176 07 (As Published) · 132008.176.07
47. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with an Operational Works
approval the Queensland Urban Drainage Manual, and must include in particular:
a. the works as generally described in the updated Stormwater Management Plan
required by this permit
b. collection and discharge of stormwater from the external catchment through the
development site, including provision of an overland flowpath which accounts for
severe storms or severe blockage of the underground network
c. provision of drainage easements over all flowpaths conveying catchments external to
the site, in accordance with QUDM. Easement dimensions and locations are to be
shown on the plans submitted with the development application for Operational Works.
d. the use of gravity stormwater drainage and not surcharge pits
Stormwater Quality Management
48. A stormwater quality treatment system must be provided for the development in accordance
with the updated Stormwater Management Plan required by this permit. The works must be
undertaken in accordance with an Operational Works approval.
49. Permanent educational signage must be erected to educate the customers to the
development about the function of the stormwater management devices provided at the
development. The dimensions, standard, presentation and location of the educational
signage must be in accordance with an Operational Works approval.
50. Stormwater management devices must be maintained as follows and records of all
maintenance activities undertaken must be kept and made available to Council upon request:
a. All vegetated stormwater quality treatment devices must be maintained in accordance
with the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
1). The approved Operational Works drawings for the stormwater quality treatment
system and detailed life cycle costing of the system must be attached as an addendum
to this document.
b. All primary stormwater quality treatment devices must be routinely checked, serviced
and cleaned in accordance with the manufacturer’s recommendations.
c. All other stormwater measures are to be maintained in accordance with the
Management and Maintenance Plan contained in the updated Stormwater
Management Plan required by this permit.
Services
51. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
52. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
53. An easement for stormwater drainage purposes must be registered in favour of Council
against the title of the subject site. The easement must:
a. Extend through the site from the northern Serenity Close frontage to the south-western
Serenity Close frontage,
b. Be of sufficient width to fully contain the 1%AEP flows (year 2100) from the local
catchment encompassing the development,
c. Be clearly shown on any plans submitted for Operational Works approval, and
d. Be registered prior to the commencement of the use.
Page 8 of 31
Document Set ID: 24809674
Version: 9, Version Date: 27/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132008 176 07 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.4 MB (small file)
- File type
No other editions are linked here.