Decision Notice OPW26 0092 (As Published)
Plan No. Rev. Plan/Document Name Date
01 Prelim 2 Pride Home Designs - Site Plan 21/07/2026
No 69 Kauri St Cooroy
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 19 August 2028, unless an application to extend the currency period
is approved by Council.
SITE SPECIFIC CONDITIONS
3. The vehicle crossover must be constructed to provide 1m minimum clearance to the property
boundary.
4. The vehicle crossover must neatly tie into the existing road verge in a manner that does not
create an ongoing maintenance burden to Council or present as a trip hazard to pedestrians.
5. The existing vehicle crossover located on the Ruby Street frontage is to be decommissioned
and the kerb and adjoining areas of verge reinstated.
GENERAL CONDITIONS
Engineering
6. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
7. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
8. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works;
9. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. Traffic Management during the construction phase.
b. Appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD)
c. Provision for safe vehicle and pedestrian access across the frontage of the site both
during daily construction and after daily construction has ceased.
10. Any changes to the details associated with the Principal Contractor during construction, must
be notified to council in writing within five business days of the change occurring.
11. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
12. The integrity and condition of any existing public or Council infrastructure and services
(above ground and/or underground) must not be adversely affected by the proposed works
Page 2 of 7
Document Set ID: 25068022
Version: 2, Version Date: 19/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Decision Notice OPW26 0092 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.