Council archive · source document
Appendix 1 - Code Assessment · MCU10/2113.03
20 Peregian Esplanade, Peregian Beach PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE Geotechnical considerations AO3.1 AO3.1 PO3 Filling works are undertaken in The proposed earthworks will be ☒Compliant Earthworks do not result in geotechnical accordance with Council’s Planning undertaken in accordance with the ☐N/A instability on-site or to nearby premises. Scheme Policy PSP6 Engineering design relevant planning scheme policy. ☐Performance Solution standards - roads, drainage and earthworks. AO3.2 AO3.2 Where the filling is for residential, The proposed earthworks will be ☒Compliant commercial or industrial purposes the undertaken in accordance with the ☐N/A works comply with Australian Standard - relevant Australian Standards. ☐Performance Solution Guidelines for earthworks on commercial & residential development. Local amenity AO4.1 AO4.1 PO4 The following control measures are The proposed development can comply ☒Compliant Undertaking earthworks does not adversely implemented— with this outcome. ☐N/A impact on the amenity of the local area by way a) regular water spraying of ☐Performance Solution of dust, noise or visual amenity. exposed areas to suppress dust; b) provision of dust stabilised or sealed internal roads; c) protective covering of exposed areas that are left for more than 2 weeks; and d) unless a development permit provides otherwise, disturbed areas are revegetated using species identified in Council's Planning Scheme Policy PSP2 Landscaping. 79
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 1 - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.