Skip to the record
For the highest quality transcripts.

Council archive · source document

Appendix 1 - Code Assessment · MCU10/2113.03

of 143

Text shows just the words. Original shows the document exactly as it was published.

20 Peregian Esplanade, Peregian Beach




 PERFORMANCE OUTCOMES                            ACCEPTABLE OUTCOMES                         PROPOSAL                                     COMPLIANCE
                                                 AO6.2                                       AO6.2                                        ☒Compliant
                                                 The site is not on the contaminated         The subject site is not identified on the    ☐N/A
                                                 land register.                              contaminated land register.                  ☐Performance Solution

 Haulage activity and amenity                    AO7                                         AO7                                          ☒Compliant
 PO7                                             No acceptable outcome provided              The proposed development can comply          ☐N/A
 Haulage of material to and from a site                                                      with this outcome.                           ☐Performance Solution
 ensures—
 (a)   minimal disturbance to neighbouring
       properties and properties along the
       haulage route; and
 (b)   Council’s road infrastructure including
       pavements is not adversely affected.
 Extent of earthworks                            AO8                                         AO8                                          ☒Compliant
 PO8                                             All earthworks, including cut and fill      The proposed development can comply          ☐N/A
 The layout of the development provides          batters, retaining walls and the like are   with this outcome.                           ☐Performance Solution
 adequate, clearly defined and easily            contained within the subject site.
 accessible—
 (a)   on-site vehicle parking and maneuvering
       areas; and
 (b)   loading and maneuvering areas for
       delivery and service vehicles.
 Sloping sites                                   AO9                                         AO9                                          ☒Compliant
 PO9                                             Cut or fill is less than 1.5 metres in      The proposed development provides for        ☐N/A
 On sloping sites development follows the        depth relative to the natural ground        excavation less than 1.5 in depth relative   ☐Performance Solution
 natural landform wherever practical and         level.                                      to the natural ground level.
 excavation or filling is minimal.




                                                                                                                                                                  81

Used in these records

About this file

File size
1.2 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix 1 - Code Assessment.pdf · 1.2 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.