Council archive · source document
Appendix 1 - Code Assessment · MCU10/2113.03
20 Peregian Esplanade, Peregian Beach PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE shade vehicles and to reduce AO11.3 AO11.3 ☐Compliant reflected radiation; Runoff from car parking areas is directed to The proposed development does not involve a ☒N/A d) maximise opportunities for landscaped areas to minimise large car park. As such, this criterion is not ☐Performance Solution infiltration of rainwater on-site; contaminated runoff, including applicable. and hydrocarbons, entering the stormwater e) minimise contaminated runoff system and watercourses. entering the stormwater system AO11.4 AO11.4 ☐Compliant and a watercourse. Canopy trees are protected from vehicle The proposed development does not involve a ☒N/A damage by providing adequate sized garden large car park. As such, this criterion is not ☐Performance Solution beds. applicable. AO11.5 AO11.5 ☐Compliant Plants with thorns, fruit or berries are The proposed development does not involve a ☒N/A avoided in car parks. large car park. As such, this criterion is not ☐Performance Solution applicable. Editor's note— Refer to Figure AP35B Services, utilities and infrastructure AO12.1 AO12.1 ☐Compliant PO12 Vegetation planted within the easement of The proposed development does not involve ☒N/A Vegetation does not pose a risk to the an overhead powerline or, where there is no vegetation under a powerline. As such, this ☐Performance Solution safety or reliability of services, utilities easement, the area of influence of a criterion is not applicable. or infrastructure including substations, powerline, has a mature height of no more overhead powerlines, power poles and than 3.5 metres. transformers, street lamps, stormwater AO12.2 AO12.2 ☐Compliant catchment pits, and underground Vegetation planted within an underground The proposed development does not involve ☒N/A services and utilities. powerline easement does not have a mature vegetation planted within proximity to an ☐Performance Solution root system in excess of 150 millimetres in underground powerline. As such, this depth and is not located directly over the criterion is not applicable. powerline. 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix 1 - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.