Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

001AA83A.001

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

:                                                                                                              ,
 ~                 :      :                      .             ‘          ,               ‘

                  INTEGRATED PLANNING ACT 1997                                                                                             IDAS Assessment Checkfist, Version 22
                  (COASTAL MANAGEMENT DISTRICT WIED RIVER/ARE ALE inn                             sean Meet       Se      Se RE is een aie emia ame Soy                                 .
                           Is any of the operational work proposed to be carried out within a coastal management district?          _                  .              .                    ,
                          [LANo  -Gotoas72          [Yes
                              If yes, is the proposed operational work for the following? —_.                                                 .
        Co.                  (i) _ Interfering with quarry material on State coastal land above high-water mark                                    {INo | LJ Yes |
                             {i}  Disposing of dredge spoil or other solid waste material in tidal waters                                            'CINo jC] Yes |
            ,                (iif) Draining or allowing drainage or flow water or other matter across State costal land above high-water              CI No |       Yes
           .                      mark                                              .               .
       .                     (iv) Constructing os installing works in a watercourse where the works are not assessable under IPA,                     [J No     |(7] Yes
                                  schedule 8, part 1, table 4, items 3 or 4                    .                                    .                              a
                            (v)   Reclaiming land under tidal watert.                                              .                                  LJNo'|{] Yes               oo
                             (vi) Constructing ah artificial waterway, other than a canal, associated with reconfiguring a lot               :       | [No      |[2 Yes
                             (vii) Constructing an artificial waterway that is a canal, associated with reconfiguring a lott                         {No        {CJ Yes         -
                            (viii) Constructing an artificial waterway not associated with reconfiguring a lot on land, other than State             {LJ No     |()-Yes
   .            oe          ____  Coastal land, above high-water if the maximum surface area of water on the waterway Is at feast 5,000m?                                                  ,
                            (ix)  Constructing a bank or bund wall to establish @.ponded pasture on land, other than State coastal land,              (JNo      |{] Yes                .
                                __above high-water mark             .                             /        -         ot                  .          “|          .
                            (x)   Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion           |{_] No    IL] Yes
                                  prone area and above high-water mark                          :                       a            re                                   .
                              If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act
                             2005?              a            :       :                                   ;                     .         .                        .        .                  :
                             0 No = (Complete Form 1, Part M} This eppiication requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment
                                       _ Manager for the application, the agency has jurlsdiction as Concurrence Agency. If yes, above, to any shown bold and marked with the symbol 8,       ‘
                                         the application also requires assessment by Queensland Transport (Marine Safety Qkd) as Concurrence Agency.
                         ,   LYes                                                       oo}                           >
                                If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?                                                           ;
                                 L] Yes - Uniess the appication is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive d        ;
                               .           {Complete Fonn 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessnient       -
                                      * +  Manager for the application; tie agency has jurisdiction as concurrence Agency. If yes, above, to any shown bold and marked with the symbol, the — ;
                                o          application also requires assessment by Queensland Transport (Marine Safety Qki) as Concurrence Agency. Subject to the declaration for the relevant i
    .                               -     + Wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005.   .                      :                |
.              .              .- Ct  No - An application for the operational work will be taken to be net properly made and the Assessinent Manager must refuse to receive it                 i
                          IPA, schaxiule 8, part 1, lable 4, item 6,'1P Regulation, schextuia 2, tabla ? itains £2 and 14: 1P Rogutation, schedua |, part 3. table 4, teins 4 orxt 5. Coastal Protection and Mariagament [
       .                  Act 1995 Act 1895, section 1QJA feild rier evea}: Wid Rivers Act 2005, seckinn 434.                                          4         .                            |
   :              RFESE BAP     BA     DIE  Bn Gr en TRG UE BUA SE         Ae noe etc iso Wao                 SORY OS ESeS Raa fe        SPR   e   Re        ee                               '
                 WATERWAY. BARRIER; WORKS;                      WIEDIRIVERTARE Acc oe   0 S728 SS Ae See oe                                           Se Se                                   |
      .          4.12 | |s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?                   Se
                          [YNo-Gotoasi3            [Yes                          m                                                                              v                             |
                       “|. Ifyes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005?                                     |
                   .          ‘LINo            .                                                                                        co
                             If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable boxes and answer (a) and/or (b) below                 |
                                | (i)  temporary                               Ty Lino     | (UJYes
         :                         |     .                     oe                 .      ~         ee                                                         .                               |
    ,                             {il} minor                                    | CI No        Cl Yes                                            a                                     .      i
                                 (i    rebuilt on a regular basis                 [1 No        Liyes |                                                                                        |
                    ;              my       i                  haa                                     °                                                       :                              j
               ‘|:               {a)  If yes to one or more of (i) - {iii) above, does all the proposed operational work comply with any applicable Department                            “4
                                      of Primary Industries and Fisheries (DPI&F) self-assessable code?                 .                         .                                           |
                                      C1 Yes - A permit for that aspect of the operational work is not required. Go to 4. 13 C1 No - Goto a)                            “f.         ,
                                 (b)  If no to all of {i) — (tii) or no to’(a) above - (Complete Form 1, Part Ox) This application requires assessment by the Department of Primary ,  :      }
                                      Industries and Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
                               (7 Yes                   .
                 .                   iN is any of the proposed operational work to be carried out in a wild river high preservation area?                                         ,
              ,    :                    No - Uniess the application is consistent with any property development plan applying fo the land, the Assessment Manager must refuse to receive .
                                              it (Complete Form 1, Part Ox} This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and,          !
                                              subject to the declaration for.the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the       i
           .                                  Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.        ”               -
                                 /  Lj Yes - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it               |
                         {PA scheduis & cart t. table 4, fern & iP A schexiube 8 part 2. table 4 tem 2 Zisheries Ragifation 1996 st 1A jset-azsessabie codes|: P Ragtathn, schovude 2 fabls 2. tem 25, IP . ,
                         Regulates, schedule 1. part 2 table 4 dem 4) Fisheries Act 1294 section 76D (wiki river areal Wilt Rivers Act 2005 secton 444. -                                     {
                                                                                       Page 36                                                                   me                          |
                                                                                                                                             :                             .                  |
                                   -             .                                                                                                                                            |

              .                                                                                                                                                             .
                                       o                                                                                                               :                   .                  i

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AA83A.001.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.