Council archive · source document
001AA83A.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
AS Eormh1| Development’Application ftes-
| Part E
F Building &/or operational work assessable against a planning scheme’ -
Peat RM . 4% : fe en, 4 ts 2e ” Re wot GOR Rg
- Nature of the works . " 4
Oe idee a Cm Ae . —_ Ne ae ile ee ee ee =~ soe . . = ~ . otra = ae
1. Nature of work that requires assessment “anes planning scheme:
[7] Building work - Complete Table A Operational work - Complete Table B
- |Table A
(i) What is the nature of the building work made assessable in the planning scheme? ‘
NEw peiVewAa
(ii) vane any current approvals associated with this application? (e.g. material change of use)
No L] Yes - Provide details below ,
‘List of approval reference/s : Date approved - Date approval lapses (if known}
Table B .
(i) What is the nature of the operational work made assessable in the planning scheme?
(1 Roadworks (J Stormwater (] Water infrastructure [_] Clearing vegetation under the planning scheme
s L} Drainage works [[} Earthworks CL Sewerage infrastructure
[7] Landscaping C] Signage © Other ~ Specity New DRivewAy
(iii) What type of approval is being sought? (NOTE: If you have indicated multiple operational works in question (i) above and your answers to this question
would be different for different operational work, if may be more appropriate to provide Ihese details in an attachment tc this form)
(_] Development Permit . CL) Preliminary Approval C] Both (Specity below)
(iv) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision}?
| Ea/No (11 Yes - Specify the number of lots being created fT
. (v) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring a tot)
LYNo L] Yes - Complete Table Ba)
Table B(a) List of approval references ; Date approved Date approval lapses (if known}
"2, Whatis the dollar vatue of this operational work? (i.e. the totaf value including GST, materials and fabour) 20
. “Ls 2A, +77
Mandatory information .
3. Confirm the following mandatory information accompanies this application
. Confirmation of lodgement} Method of lodgement
Plans, and specifications ifappticable, showing the nature and location of the proposed works (including the
. extent of any cul and fil) . we Confirmed
oo ee oe
OFFICE USE ONLY
0
Advice for completing Part E
General advice :
* Part A must also be completed for all IDAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following @ response there is a statement to go directly to another question.
lar A davelopment permit authorises development ta occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
‘This form is also used for building or operational work assessable against the fand use plan for Caims airport land or Mackay airport land. Wherever
; planning scheme is mentioned, take it to mean the land use plan for the airport land.
Page 1 .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001AA83A.001.pdfRelated documentPublic source context ↗
09/0695 - Operational Works - Driveway [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.