Skip to the record
Accept no imitations.

Council archive · source document

001AA83A.001

of 29

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

‘+ INTEGRATED PLANNING ACT 1997                             °                                                              IDAS Assessment Checklist, Version 22
     ,             S ECTI ON 1                 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
     oo             HERITAGE 5 SRA                          Oe 7) 2                RN       oe Es ae Oe a Oe a                                         eT ST
,                 {1,14 | Is gfy part of the proposal intended to be carried out on a Queensland heritage place under the Queensfarid Heritage Act 1992?
so                     .    {IM No-Gotog118       [Yes                                                                                         —                                    .
                                 tf yes, has an exemption certificate for the proposal'-' been issued under the Queens/and Heritage Act 1992?
                                 O Yes       .         CI No                                                        :
                    .          __. _ tfno, is thé proposed work liturgical development under Queenstand Heritage Act 1992, section 78?
  Ls                                   Clyes          =    [No                    .                                                                                           .
                                 -          If no, is the work being carried out by the State?            -                ;
  ‘         ,              ;       -        (J Yes               [1 No - (Complete Form 1, Part C1) This application requires assessment by the Environmental Protection Agency (EPA).
                       aa              .       4              -.    4EPAisnot the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency. .
 —               .      ‘ | PA schedule 8, part 1, table 5, lem 2: IP Regutaiton, schedule 2. fable 2 Zon 13°                       .                                                 ,
      ‘                    Does the proposal involve development intended to be carried out on a place entered In a local heritage register under part 11 of the
        .                Cpeenslend Hentege Act 1992, other than if place is on Caims or Mackay airport land?
                             No - Goto Q1.2           (} Yes          LO                                                       ne                   Coe
            so            :      If yes, does-the following apply?         ;                        ,                                        .                                ‘       :
 oO                                 (i)   development for public housing, as defined by the infagrated Planning Act 1997 (IPA), chapter 5,         [No        [1 Yes
   L                            .        part 6                   ,        /         ;                  ,       .                .                                        |.
                            .    .  {ii} development carried out by the state on-land designated for community       infrastructure under the      CLINo     (Yes              .
                                         IPA, chapter 2, part 6        ;                                                                                                           .
   .           ,                    (iii) development that is exempt from assessment against a planning scheme under the IPA, schedule             [JNo      [J Yes
    .       ‘                 -  "Ifo to alll of (i) - (ii) above - (Compiete Form 1, Part C2) This eppiication requires assessment by the relevent local govemnment as Concurrence
                                    Agency.   .                                         :                           ,                           :
           .                                 _       ,t4                   a   :                                                                                            ‘
               -          IPA schanide 8 art 1. fatva item 24 IP-Regdainw, schedute [apart 2, table 5, dem 2: Aupost Assets (Restructuning and Disposal) Act 2008, ¢ 5¢., . , :     >
    -     "__     PREMOVING      QUARRY: MATERIAL; WILD RIVER AREA SRR ORK giint cin SEAM SRT MVE                                             OR |
         ‘                Dges  the proposal involve removing quarry material from a watercourse or jake as defined under the Water Act 2000?                  ;                  .
   ot                     [I No-Gotoar3        CJ) Yes:                                                                                                          i
                                if yes, is an allocation notice required under the Water Act 2000?                                                           ‘                          an)
             a                 Oy No               [1 Yes
 ,          .                        " If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
                            -          Rivers Act 2005?                :         :                                            :
   ;       .                            oO No — (Complete Form 1, Part Kx} This application requires assessment by the Department af Natural Resources and Water (NRW). IF NRW is not
                 |                          the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agancy.                                     .
                ;                     . O Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive #. i
                                            (Complete Form 1, Part Ki). If NRW Is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
           .              :                 Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.       |
       ,                 IPA schestule 8 part 1 lable 5, tem 1, 1P Regulation, schedtde 2, table 2 tam 11. 1P Regulation. schedude 4, table 5, item 2 (iit river area), Watar Act 2000, saction 966C: WH Rivors Act
   .      ,              2005, seclion 434.                                                                    .

                                 ‘                               . :      -         .                   .                     . .                      .

  .             ‘In this IDAS Assessment Checklist, the tarm proposal refers to the Proposed use, work or lot reconfiguration the subject of the application.               :
    |             -                 :                                                 Page 2          :                                                                        :

                                                                                                                                                ’                                       i-

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AA83A.001.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.