Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Cooran - Development Application

Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.

of 156

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                          aurecon
Ref: Cooran                                                              Date: 11th December 2017


NBN Co Limited
c/- Aurecon
GPO Box 331
BRISBANE QLD 4001


                                          OWNERS CONSENT


We, Gabrielle Marina Seeger & Beate Czamanska, being the registered owner(s) of the property
described as Lot 22 SP 148684, hereby grant NBN Co Limited the right to lodge on our behalf any
applications required for Town Planning and/or Building Approval for                    the establishment   of
telecommunications infrastructure on the abovementioned property.



Dated this___�
                   OJ·f-h
                    l ____              day of
                                                  --,-Q'l )JI �
                                                   ....J                      l01'7"   .2. 0 I K
                                                              °
                                                 s 0 ·1 �  Gabrielle Seeger
                                                                              \0 wn            e. v-


        •   If there are multiple owners a signature is required from each one
        •   The ACN Number and if the owner of the land is a company two (2) directors of the company
            or a director and a company secretary
        •   OR if a sole director and no Secretary, the owner consent must clarify that the person is the
            sole Director is also the sole Secretary.
        •   A company seal can be used if witnessed by two company directors or a director and a
            company secretary.
        •   If the land is leased the lessor must sign the form.
        •   Where the owner is identified as a Body Corporate, a Body Corporate Seal and Body
            Corporate resolution consenting the proposal & two signatures (one of which must be the
            chairperson OR
       •    Body Corporate Seal and a letter of consent signed by chairperson and secretary OR
       •    A signed letter of consent from each lot owner covered by the Body Corporate.




                                                                                                                 4
Log in to download the original file

Cooran - Development Application.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.