Original source · versioned page text
Cooran - Development Application
Attached to the e-mail Service & Utility Type 3 Tower (Telecommunications) -MCU18/0166.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Proposed nbn Telecommunications Facility on Lot 22 SP148684
Appendix C – Code Assessment
Specific Outcomes Probable Outcomes Compliance
Flooding and drainage S12.1 For new buildings or structures or Not Applicable.
O12 Buildings and other works are additions of more than 50m2 gross floor
The proposed facility is not located within a flood
designed and sited to— area to an existing building or structure,
hazard area. Notwithstanding this, the relatively small
floor levels for habitable rooms are—
a) provide flood free access to scale of the development (120 m2 compound) will not
premises and flood free habitable a) for areas where minimum floor exacerbate flooding or ponding on the site or on
areas; levels are available—not less than nearby land. Furthermore, the proposal is for a non-
the specified level; habitable use and will not increase the number of
b) allow only minor, short term and
b) for areas where flood modelling is people living or working on-site. Any excavated
infrequent flooding of non-habitable
available—a minimum of 500mm material will be distributed across the site in a location
areas;
above the modelled flood level; that will not worsen the flood hazard on the site or
c) ensure carparking areas can be
and surrounding premises.
adequately drained; c) for areas where flood modelling is
d) ensure drainage does not not available, a minimum of The proposal will not include car parking and will only
adversely impact upon other 500mm above the highest known require maintenance 3-4 times annually.
premises; and flood level;
e) ensure filling or excavation does AND
not adversely impact upon other
premises by—
S12.2 Where Council infrastructure is
i. causing ponding on the site or available—
nearby land;
a) any drainage (from buildings and
ii. increasing flooding, which land) flows to that infrastructure;
adversely affects the safety or use of
and
any land upstream and downstream; b) the infrastructure has the
and
capacity to accept any additional
iii. adversely affecting the flow of loading.
water in any overland flow path.
AND
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.