Original source · versioned page text
CS-002 Master Legend
LEGEND
GENERAL PLANTING FURNITURE LIGHTING
REFER LANDSCAPE SCHEDULE OF WORKS REFER LANDSCAPE SCHEDULE OF WORKS
BY OTHERS REFER LANDSCAPE SCHEDULE OF WORKS
DRAINAGE INLET TREE PLANTING FU01: FURNITURE TYPE LI01: LIGHTING TYPE
REFER TO ENGINEERS DRAWINGS REFER LANDSCAPE SPECIFICATION FU 01 REFER LANDSCAPE SPECIFICATION REFER LANDSCAPE SPECIFICATION
LI 01
EXTERIOR WALL FU02: FURNITURE TYPE LI02: LIGHTING TYPE
REFER TO ARCHITECTS DRAWINGS FU 02 REFER LANDSCAPE SPECIFICATION REFER LANDSCAPE SPECIFICATION
LI 02
TREE PLANTING
REFER LANDSCAPE SPECIFICATION
KERB FU03: FURNITURE TYPE
REFER TO ENGINEERS DRAWINGS FU 03 REFER LANDSCAPE SPECIFICATION OTHER
FU04a: FURNITURE TYPE LEVEL TRANSITION
GENERAL SHRUB PLANTING FU04a REFER LANDSCAPE SPECIFICATION
(FEATURE)
PLOT STYLE: URBIS_A1.CTB
LANDSCAPE
EXTENT OF WORKS FU04b: FURNITURE TYPE
FU04b REFER LANDSCAPE SPECIFICATION
EXISTING TREE (SURVEYED)
SHEET JOIN LINE
TO BE RETAINED AND PROTECTED
FU04c: FURNITURE TYPE
REFER LANDSCAPE SPECIFICATION
GENERAL NOTES
(TREE ID NUMBER AND LEVEL @ BASE OF TRUNK) FU04c
1. REFERENCED AND NON-REFERENCED NATSPEC AND
PROPERTY BOUNDARY AUSTRALIAN STANDARDS TAKE PRECEDENCE OVER ALL OF
DRAINAGE THE INFORMATION NOTED WITHIN THESE DRAWINGS AND
LANDSCAPE SCHEDULE OF WORKS. ENSURE ALL
TRANSPLANTED GRASS TREE 2m REFER LANDSCAPE SCHEDULE OF WORKS
REFER TO PLANTING PLAN AND SCHEDULE
CONTRACTED WORKS IDENTIFIED WITHIN THIS OPERATIONAL
SUBSOIL DRAIN LINE WORKS PACKAGE COMPLIES WITH RELEVANT STANDARDS.
FINISHES ARROWS INDICATES DIRECTION OF FALL 2. USE FIGURED DIMENSIONS ONLY. ALL DIMENSIONS TO BE
PAGE SETUP: ----
SSD SSD
REFER LANDSCAPE SPECIFICATION
REFER LANDSCAPE SCHEDULE OF WORKS TRANSPLANTED GRASS TREE 1m VERIFIED ON SITE BEFORE COMMENCING WORK. ALL
REFER TO PLANTING PLAN AND SCHEDULE DIMENSIONS ARE IN mm UNLESS OTHERWISE STATED.
PA01: PAVEMENT TYPE SUBSOIL DRAIN LINE
REFER TO LANDSCAPE SPECIFICATION ARROWS INDICATES DIRECTION OF FALL 3. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
PA 01 SSD SSD
PROJECT SPECIFICATION, LANDSCAPE SCHEDULE OF WORKS
REFER LANDSCAPE SPECIFICATION
TRANSPLANTED GRASS TREE 0.5m AND ANY OTHER WRITTEN INSTRUCTIONS ISSUED. ANY
REFER TO PLANTING PLAN AND SCHEDULE
PLOTTED BY: JAMES MAYALL-MUDGE
PA02: PAVEMENT TYPE DR01: DRAINAGE TYPE DISCREPANCIES SHALL BE REFERRED TO THE
REFER TO LANDSCAPE SPECIFICATION DR 01 SUPERINTENDENT FOR A WRITTEN DECISION PRIOR TO
PA 02 REFER LANDSCAPE SPECIFICATION
ORDERING, SUPPLY, INSTALLATION OR CONSTRUCTION.
TRANSPLANTED GRASS TREE < 0.5M
REFER TO PLANTING PLAN AND SCHEDULE
4. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
PA03: PAVEMENT TYPE DR02: DRAINAGE TYPE ASSOCIATED DRAWINGS AND SPECIFICATIONS PROVIDED BY
REFER TO LANDSCAPE SPECIFICATION DR 02
PA 03 REFER LANDSCAPE SPECIFICATION OTHER PROJECT CONSULTANTS (I.E. CIVIL AND STRUCTURAL
ENGINEERS, LIGHTING DESIGNERS, ETC).
5. ALL DRAWINGS ARE TO BE READ IN CONJUNCTION WITH THE
PA04: PAVEMENT TYPE IRRIGATED AREAS
REFER TO LANDSCAPE SPECIFICATION REFER LANDSCAPE SPECIFICATION SUNSHINE COAST REGIONAL COUNCIL 'DEVELOPMENT
PA 04 GARDEN PROFILE
DESIGN PLANNING SCHEME POLICY'.
GA01: GARDEN TYPE 6. THE LANDSCAPE CONTRACTOR SHALL CONFIRM THE EXTENT
PA05a: PAVEMENT TYPE REFER LANDSCAPE SPECIFICATION OF LANDSCAPE WORKS SHOWN ON PLANS WITH THE
GA 01
REFER TO LANDSCAPE SPECIFICATION PROJECT LANDSCAPE ARCHITECT PRIOR TO BEGINNING THE
PA05a
WORKS.
GA02: GARDEN TYPE
REFER LANDSCAPE SPECIFICATION 7. DESIGN AND CONSTRUCT COMPONENTS WILL REQUIRE SHOP
PLOT DATE: 10.10.2022
PA05b: PAVEMENT TYPE GA 02 DRAWINGS FOR APPROVAL PRIOR TO UNDERTAKING WORKS.
REFER TO LANDSCAPE SPECIFICATION 8. DO NOT DAMAGE ANY ROOTS OF RETAINED TREES / PALMS.
PA05b
GA03: GARDEN TYPE TREE PROTECTION IS TO BE INSTALLED IN ACCORDANCE
PA06: PAVEMENT TYPE REFER LANDSCAPE SPECIFICATION WITH AS4970.
GA 03
REFER TO LANDSCAPE SPECIFICATION 9. REMOVAL OR DISTURBANCE OF VEGETATION AND TOPSOIL
PA 06 MUST BE CONFINED TO WITHIN THE APPROVED
GA04: GARDEN TYPE CONSTRUCTED WORKS AREA EXCEPT WHERE TREES ARE
PA07: PAVEMENT TYPE REFER LANDSCAPE SPECIFICATION APPROVED FOR REMOVAL, LEVELS ARE TO BE ALTERED AND
GA 04
REFER TO LANDSCAPE SPECIFICATION NEW LANDSCAPE FINISHES INSTALLED.
PA 07
10. THE LANDSCAPE CONTRACTOR MUST CONFIRM WITH THE
SUPERINTENDENT THE LOCATIONS OF ALL SERVICES ON-SITE
PA08: PAVEMENT TYPE PRIOR TO COMMENCING CLEARING, GRUBBING, EXCAVATION
PATH: \\file03.urbis.local\Projects\PROJECTS\P0020000\P0025138_Sunrise Beach RAC\10_Construction Docs\4.02_CAD\Layouts\P0025138_000 CS.dwg
REFER TO LANDSCAPE SPECIFICATION TURF PROFILE OR GROUND PREPARATION. CONTACT 'DIAL BEFORE YOU DIG'
PA 08
TU01: TURF TYPE ON PHONE: 1100 (IF NECESSARY) AND REVIEW ALL
REFER LANDSCAPE SPECIFICATION ENGINEERING DRAWINGS.
TU 01
FENCING 11. THE LANDSCAPE CONTRACTOR IS TO ENSURE THAT THE
INSTALLATION OF LANDSCAPE TREATMENTS DOES NOT
REFER LANDSCAPE SCHEDULE OF WORKS IMPEDE ON ACCESS TO SERVICES, INCLUDING MANHOLES,
FE01: FENCE TYPE EDGING SERVICE PITS, VALVES AND FIRE HYDRANTS.
FE 01 REFER LANDSCAPE SPECIFICATION REFER LANDSCAPE SCHEDULE OF WORKS 12. PROPOSED TREE PLANTINGS MUST MAINTAIN A MINIMUM
Fe1 HORIZONTAL CLEARANCE OF 1.5 METRE FROM UNITYWATER
ED01: EDGE TYPE
ED 01 REFER LANDSCAPE SPECIFICATION WATER MAINS AND 1.5 METRES FROM UNITYWATER
FE02: FENCE TYPE SEWERAGE MAINS UNLESS NOTED ON PLANS. LANDSCAPING
FE 02 REFER LANDSCAPE SPECIFICATION
PLANTS WITHIN THESE CLEARANCES MUST BE LOW GROWING
Fe2 WHEN MATURE AND SUITABLE APPROVED VARIETIES.
ED02: EDGE TYPE
ED 02 REFER LANDSCAPE SPECIFICATION
FE03: FENCE TYPE
FE 03 REFER LANDSCAPE SPECIFICATION
Fe3
FE04: FENCE TYPE TRELLIS
FE 04 REFER LANDSCAPE SPECIFICATION REFER LANDSCAPE SCHEDULE OF WORKS
Fe4
TS01: TRELLIS TYPE
TS 01 REFER LANDSCAPE SPECIFICATION
FE05a: FENCE TYPE
FE05a REFER LANDSCAPE SPECIFICATION
FE05A
TS02: TRELLIS TYPE
TS 02 REFER LANDSCAPE SPECIFICATION
FE055b: FENCE TYPE
FE05b REFER LANDSCAPE SPECIFICATION
FE05B
FE06: FENCE TYPE
FE 06 REFER LANDSCAPE SPECIFICATION
FE06
PROJECT KEY PLAN . . . . . DISCLAIMER CLIENT ISSUE PROJECT NO.
Copyright by Urbis Pty Ltd. This drawing or parts thereof may not be reproduced
. . . . .
SUNRISE BEACH
for any purpose or used for another project without the consent of Urbis other than
FOR CONSTRUCTION P0025138
SUNRISE BEACH .
.
.
.
.
.
.
.
.
.
This drawing must be read in conjunction with all relevant contracts, schedules,
.
reproduction for the purposes of actual ordering, supply, installation or construction. SCALE NORTH
. . . . .
FOR CONSTRUCTION 03 FOR CONSTRUCTION JM SM
specifications, drawings and any other issued written instructions. Do not scale
10.10.2022 from drawings. Written figured dimensions take preference to scaled dimension
.
. 02 FOR TENDER JC SM 08.10.2021 and must be verified on site before proceeding with any work. All discrepancies
. 01 FOR TENDER JC SM 04.10.2021 must be referred to the superintendent for a written decision prior to ordering, DRAWING TITLE DRAWING NO. REVISION
supply or installation. Urbis must be notified in writing of any discrepancies.
A DESIGN DEVELOPMENT 100% SM GP 08.10.2020
Level 32, 300 George Street | Brisbane QLD 4000 Australia | +61 7 3007 3800 | URBIS Pty Ltd | ABN 50 105 256 228 REV DESCRIPTION DWN CHK DATE PROJECT DIRECTOR: GLEN POWER SCHEDULE CS-002 03
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original