Landscape 210819 2 Pearsons Rd BLD OW-B
2 PEARSONS ROAD, COOROY Landscape and Ecological Rehabilitation Plan Package Drawing Schedule · Should amended site topsoils be insufficient in quantity, contractor to import MRTS-16 topsoil Vegetation Retention Area Annual Maintenance Regime 4.0 Landscape Construction LD1 Drawing Schedule, Specifications (> standard than AS4419) and spread to proposed plan finish levels. Prior to spreading, imported topsoils shall have soils analyses test as per above. Amend Imported soils per test Task Frequency Performance Indicator Levels LD2 Specifications, Plan Sheet Layout results prior to spreading. Brushcutting October - March: Fortnightly Regenerating plants and · See plan for engineer's plan levels and proposed levels. LD3 Finishes and Planting Schedules · Civil works to cultivate subgrade 150mm and re-spread ameliorated stockpiled topsoil to plan April- September: Montlly revegetation areas free from · Verify all levels, conditions, and utility locations in-the-field including all inverts. If a LD4 Details prescribed proposed contours and track-in, 300mm deep for gardens and 150mm deep for turf competition with grass discrepancy occurs notify superintendent and/or LA. LP1 Planting Plan areas. Landscape contractor to provide unit cost to perform these works in-lieu of civil · Levels to be confirmed by a qualified/licensed surveyor. See plans for level sources. contractor. Weeding - Establishment Period - Weekly Minimal regrowth of weeds. No · Grade evenly between prescribed levels and finish surface levels ensuring positive drainage LP2 Planting Plan · Clear and remove all non-organic, deleterious and large organic matter such as rocks greater by hand Maintenance Period - Fortnightly competition from unchecked and no ponding areas. LP3 Planting Plan than 40mmØ, tree roots, trunks, limbs, and stumps from all areas to be landscaped. weed and grass regrowth. · Except where indicated or specified (i.e. allowing for mulching and sheet flow over settled · Ensure smooth, flowing, even grades and positive drainage with no ponding to fall Spraying / October - March: Fortnightly No weeds or grass of greater turf), finish surface levels are to be flush with adjacent surfaces and graded evenly between Landscape Specifications percentages shown on plan, 3% (minimum 2%). Finish grades shall blend into existing grades Wick Wiping April - September: Monthly height than plant within design and finish levels. providing a natural appearance with no abrupt edges. 500mm of plants · Co-ordinate establishment of levels with superintendent. These landscape plan must be read in conjunction with the appropriate statutory approvals and · Ensure 2% minimum slope away from all structures to pits or swales. Re-mulching Allow to carry out at least once during Uniform 100mm deep to Australian Standards. · Trim topsoils for gardens, revegetation and turfing. Drainage Maintenance Period, then once per year suppress weed growth and · All damaged stormwater pipes are replaced and relocated as necessary. maintain soil moisture 1.0 General Notes 2.0 Ecololgical Rehabilitation, Vegetation Management and Revegetation · Ensure site drainage can occur positively to whole of site, minimum 2% away from any · There is existing vegetation on-site. In order to maximise the retained ecological values for Watering Establishment Period: Every 2 or 3 days Plants exhibit healthy growth buildings and where paths, edges, and gardens etc. may impede drainage; refer to LA before Abbreviations this vegetation, nominated existing vegetation requires protection and management. Maintenance Period: Weekly / as required and no signs of drought stress continuing works. · NC - Noosa Council · A.S. - Australian Standards · Natural vegetation regeneration needs to be encouraged. to maintain adequate soil moisture · Drainage works to correlate with and not disturb adjacent land. · DBH - Diameter at breast height (1.4m) · E.P. - Establishment Period · Site weed removal and management is important to allow regeneration and is a NC · See legend for plan symbols and plans for locations. Fertilising As required where and when plants are Plants exhibit healthy growth · LA - Landscape Architect · N/A - Not applicable · O.C. - On centre condition of the development approval. · Landscape field pits to be 300mm x 300mm x 450mm 'Polycrete' pits with hot dipped not responding to slow release fertiliser and no signs of nutrient · MP - Maintenance Period · MRTS - Main Roads Technical Standard · Vegetation to be protected is plan nominated, predominately native species, in a healthy and galvanised surface grate/lid (non-heel slip grates in paved areas). Determine requirements applied at planting. Allow to fertilise once element deficiency stress · m - metre · m² - square metre · m³ - cubic metre safe condition, that are not located so as to interfere with required and approved site works. on-site in addition to those on plans. during Maintenance Period. · NATA - National Association of Testing Authorities · typ. - Typical · New Planting / Revegetation works shall be conducted in Vegetation Management areas as · All drainage pits and subsurface drains to be connected to existing stormwater drainage · uPVC- Unplasticised Polyvinyl Chloride · S - Spread required. Refer to Planting Schedule and Plan for more information. Staking As required where plants require support. Plants growing in an system. Refer engineer's drawings for drains and hydraulic services. · VPZ - Vegetation Protection Zone · WbD - Water by Design · The table below summarizes the Vegetation Management program elements; Allow to stake 20% of trees during upright manner · Stormwater drainage to be 100mmØ minimum uPVC drainage pipe. Establishment Period. Allow to stake · Subsurface drainage to be 100mm minimum Ag-flow pipe centred in 300mm x 300mm gravel · The Landscape Plans must be read in conjunction with RAL20/0021 and the Operational Vegetation Management Program additional 20% of trees during trench. Gravel to be 8-20mmØ No-fines aggregates surrounded by LA approved permeable Works Landscaping Decision Notice once issued. This plan has been developed to comply Issue Vegetation Management - Clearing and Protection Maintenance Period. bidim or geotextile fabric. See Detail(s) for more information. with the Noosa Plan 2020, Landscape Code in accordance with the following; Storm Damage Following storm event, heavy rainfall or Any damage noted and rectified · Furnish and install 1m³ of 75mm - 150mmØ washed, sound, rounded Mary River · 9.4.5 Landscaping Code Objective · Identify areas of vegetation and individual trees to be protected and Inspection high winds gravel spalls over pinned permeable geo-fabric at all new landscape drainage · PSP 2 Landscaping retained within the development areas and those to be cleared. daylight points. · Table SC6.3.5.1 · Confirm workers understand the requirements of protection and retention. Pruning To promote healthy plant growth. Plants have desired natural · Where and if additional drainage is required the following applies: Install protective devices to safeguard against accidental damage. Establishment Period: Monthly form and exhibit healthy growth - Allow for seepage interception sub-surface drainage where paths and landscape works · These plans are not for tender or construction. · Confirm appropriate clearing methods for nominated areas and within Maintenance Period: Every 3 months impede drainage (to be coordinated on site). vicinity of protected and retained areas. - Allow for 300mm x 300mm gravel trench with socked Ag-line under path, discharge to Monitoring Establishment Period: Provide a report to Successful establishment and Preliminaries · Minimise the time between when clearing occurs and the cleared ground is natural drainage lines. LA on establishment progress at each scheduled maintenance · Refer to plans by others for all services locations, footpath works, levels (other than those stabilised to reduce the chances of erosion. - Allow for 300mm x 300mm lateral collection trenches extending nominal 1m either side progress payment claim. activities completed indicated on these plans) and boundaries. All services and related infrastructure including · Mulch or wood-chip cleared vegetation that is free of designated weed of low point. Maintenance Period: Furnish completed street lighting shown on these plans are indicative only. species or dispose appropriately and legally. activities list to LA every 3 months · Call 'Dial Before You Dig 11 00' prior to any excavation. Fencing · Before work commences the subcontractor is to organise a pre-start meeting with the LA to Management · This Vegetation Management strategy should be included with civil works Revegetation Performance Criteria - Floristic and Structural · Supply and construct fencing per plans, details, and Finishes Schedule. establish scope of works management procedures and clarify any issues. Strategy documentation. · Install tree protection measures as per plans and detail. · Potentially obtain a guarantee by the contractor against culpable damage Edging · Performance criteria is based upon plant materials installed from 50mm tubestock with plants · Prior to commencing construction works, verify dimensions, levels and location of site to vegetation to be retained with performance bond under the contract. · Supply, install, and maintain edges as specified and shown on the plans and details and 100mm tall as measured from top of plant to base of potting mix and/or finish surface level at services, refer engineer's drawings generally. time of planting. New plants must achieve the following heights and 'area maintenance Finishes Schedule, specifically where new gardens are located adjacent to new turf areas. Tie · Dimensions take precedence over scale. Tasks · Superintendent to confirm plan nominated vegetation to be retained and off edge ends perpendicularly to paths, kerbs, and path joints wherever possible. percentage of weeds' criteria within the following time limits; · Contractor to review all schedules herein to confirm their correlation to these plans. Where protected in-the-field and determine if any additional areas of vegetation discrepancies occur within landscape documentation refer to LA prior to provision of tender require protection. 5.0 Irrigation - If Intstalled 1 Year 2 Year 3 Year pricing and/or construction. · Retained vegetation shall be identified, clearly marked and protective Trees: 1m 2m 3m devices installed. Protective devices shall maintained in functional · Liaise with relevant NC authorities and obtain any approval as required. Shrubs: 400mm 1m 1.2m Erosion and Sediment Control condition during works operations and removed in entirely and recycled · Comply with government standards and co-ordinate with other trades. Groundcovers: 200mm 400mm *800mm · The landscape contractor to implement and maintain for the contract duration, best practice once works have been completed. · Check locations of penetration/conduits and install where required. Percentage of Weeds: < 5% < 5% < 5% erosion and sediment control measures in accordance with the manual for erosion and · Protection devices shall be monitored daily with a report generated weekly · Contractor to provide qualifications and insurances before construction. sediment control (Maroon Manual), good environmental practice and the consulting civil on their success, integrity and repaired as required. · Irrigation system is a 'Design + Build' system. *Revegetation ground surface areas must not display any area >1m² within any 10m² sample. engineer's specification for erosion and sediment control. Penalties and fines for · Vegetation protection fencing (refer Detail) shall be used to protect · Any irrigation installed shall be for establishment only and shall be removed prior to the non-compliance will apply. vegetation nominated for retention and protection. 'Off-maintenance' inspection. · Install silt control fencing in accordance with site environmental management plan and local 3.0 Weed Management authority regulations. Performance · Protection device integrity. · Sediment and erosion control devices to be installed where necessary and as directed on site Indicators · Retained vegetation and trees retained are good health with no earthwork · As a condition of development approval, all noxious and environmental weeds are to be by superintendent. machinery scars. removed from site and/or managed appropriately prior to sealing of plans. · All sediment and erosion control devices are to be installed in accordance with manufacturer's · Weed control locations shall be confined to retained vegetation areas as nominated on the specifications. Frequency · Weekly inspection and log by responsible person as nominated civil site approved plans. · The contractor is responsible for ensuring sediment and erosion control devices are inspected construction manager. · Weed control is summarised in the table below; and maintained as follows; Weed Management Summary Table a) During construction: Daily during dry weather, prior to predicted storm events, twice Responsible · Contractor nominated agent to report to superintendent. daily during prolonged rain Person Task Operation Frequency b) During establishment period: Weekly during dry weather, prior to predicted storm events, twice weekly during prolonged rain Reporting · As nominated in the contract and/or monthly and for contract separable 1.0 - Herbaceous Remove entire plant by hand. Alternatively kill plant with Following weed · All stockpiles are to be protected with suitable erosion control devices and graded to ensure portions reporting to site construction manager. and small weed herbicide application using wick wiper or hooded spray identification and control of runoff. control nozzle. For herbaceous weeds cut or scrape stem and as required to · Coordinate installation of sediment and erosion control devices with civil contractor to ensure Corrective · Make good or replace any damage to trees or vegetation that are paint with 1:1 mix of an approved herbicide and water. kill weeds compatibility and consistency in control measures. Action designated for protection and retention, and reinstate protective devices as · All exposed surfaces, once completed shall be immediately stabilised to prevent erosion. required. 2.0 - Large and Drill and fill or frilling. An approved herbicide is delivered Following weed woody weed into sapwood via drilled holes or frill-cut pockets identification and Site Works control immediately after wound is made. Use 'cut stump' as required to · Remove all unwanted material, deleterious and operational debris from site. method if accessibility permits. Cut tree 30mm above kill weeds · If provided levels are not functional refer to the site superintendent and/or LA. ground and paint stump with undiluted an approved · Civil engineering designs have provided a positively drained site. If there are drainage issues herbicide. Remove waste materials from site. refer site superintendent. · Refer to 2.0 Landscape Construction - Drainage for more information. 3.0 - Remove or Remove waste materials containing flowers or seeds or As required to manage weed species from site that can shoot from pieces of remove or Topsoil - Harvesting, Stockpiling, Amelioration Re-use and Spreading vegetative waste plant and dispose of at approved facility. Cover waste manage waste · Civil engineering earthwork operations will have harvested and stockpiled site topsoils. materials when removing from site. Landscape contractor to coordinate with civil contractor to ensure topsoil is re-installed per the following specifications in respective landscaping areas. · Stockpiled topsoil shall not be in any preserved vegetation areas or within three metres of preserved vegetation driplines. · Topsoil stockpiling shall occur in an area adjacent to the stripped area(s) or area by engineer or owner which will not hinder visibility for inspection of the work. · Stockpile topsoil to ensure no ponding of water and positive drainage. · Install erosion control measures per engineer and above for stockpiled topsoil. · Landscape contractor to conduct soils analyses tests to stockpiled topsoils. Furnish LA with results. Ameliorate site topsoils per recommendations prior to re-spreading. Landscape contractor to allow for pH balancing and nutrient ameliorations. All soil testing to be conducted by a NATA accredited lab. NOTES: This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736). Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia M: +614 7705 5222 19.08.21 B For Application BB BB LD1 Drawing Schedule, Specifications E: [email protected] 17.08.21 A For Application BB BB Sheet Title Sheet 1 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com DATE ISSUE DESCRIPTION DRAWN CKD
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
6.0 Planting 7.0 Maintenance Tasks
· Maintain whole of landscape works for establishment period of 13 weeks or as in agreement
Landscape Plans Sheet Layout - Not to Scale
New Gardens with Owner.
· See 1.0 Topsoil for cultivation and topsoil requirements. Irrigation and Watering
· Spread ameliorated site topsoil or MRTS-16 imported organic topsoil to a depth of 300mm · Every day for the first two weeks (unless it rains adequately)
over prepared garden areas and trim. · Every 2-3 days during the balance of the establishment period or as needed if hot and dry
· Crown garden beds 100mm H at centres to drain positively. (unless it rains adequately).
· Mulch gardens with LA approved A.S. 4454 imported organic mulch as specified 100mm deep · Once a week there after.
settled. Leave 20mm between top of mowing edge and planting area mulching. If mulched Mowing
areas are >1:4 sloped, install open weave pinned jute net over mulch once settled. · First Mow - Once after 10 days if there is rapid growth or 14 days after installation. W
AT
ER
W
AY
· All supplied topsoil and mulch to comply with current A.S. and free of weeds, seeds · Mowing Thereafter - Once a week during summer, once every two weeks in spring and
BM: Pin
D
PE
RL: 109.315
AP
M
d
BM: Pin
oa
LP1
RL: 107.32
(specifically Nutsedge), pests including fire ants and soil borne viruses and diseases. autumn, and once a month in winter or as required if there is a lot of growth or as desired.
99
s R
Weed Removal: As required to reduce competition and seeding.
Tree Planting Plant Replacement: Immediately replace plants that die or fail to thrive, are damaged or stolen,
on
12
11
ars
· Refer to street tree and tree planting details (as applicable) for information. with plants of the same species and of similar size and quality unless otherwise specified. 13
14 15
Pe
· All trees to be certified to A.S. 2303:2018 'Tree stock for landscape use' and comply with this Stakes and Guys: Adjust and/or replace stakes and ties where required. Remove staking and
specification. guying when instructed by the superintendent. 10
100
· Landscape contractor to peg street tree positions for approval by superintendent before Re-mulching: As required to maintain a consistent depth, 100mm settled, until plants are
excavation. established or Off-maintenance respectively.
LP2 Blue Wre
· All trees to have a full and even crown.
9 n Place
Monitoring: Provide a monthly report on completed tasks. Single Storey
House
Extensi
16 on
· Install trees at locations indicated on the plans, per notes and details herein.
· Mulch tree gardens with minimum 1800mmØ collar of AS4454 organic mulch as specified Warranties BM: PM24974
RL: 110.614
8 7 6 5
4
100mm deep settled. Do not mulch within 50mm of trunk / plant stem. · Warranties or guarantees specified shall name the Owner as warrantee. Register with BM: Pin
3
2
RL: 107.76
· Edge trees per details. manufacturers as necessary. Retain copies delivered with and components and equipment to
· Install street tree drainage per detail if required by civil engineer or tree pits do not drain after the Owner.
Timber Retaining
Wall
Timber Retaining
1 LP3
Wall
they are tested for drainage by filling with water prior to planting and backfilling. Landscape · Warranties and/or guarantees to be submitted to the Superintendent to deliver to Owner within Timber Retaining
Wall
contractor to furnish tree pit drainage rate per tree. fourteen (14) days after practical completion.
· Install street tree root barrier as specified. Landscape contractor to furnish rate per tree. · Commence Warranty periods at practical completion or at acceptance of installation, if
· Tree staking - per details. acceptance is not concurrent with practical completion.
· All trees to be located minimum; · If installation is not by manufacturer and product warranty is conditional on the manufacturer's
- 1000mm from back of kerb (or in-between kerb and footpath where applicable (allowing approval of the installer, submit the manufacturer's written approval of the installing firm.
for service setbacks) or as dimensioned on plans, from underground services (confirm
Spotted
ce
locations on-site prior to pit excavation) Certifications Gum C
ourt
ren Pla
- 1500mm from concrete paths, horizontally and vertically from sewer lines, and property Furnish LA with the following certifications prior to Practical Completion:
connections · AS 2303:2015 Tree Stock for Landscape Use
- 3m from adjoining, new, or perpendicular lot boundaries, driveway crossovers, · MRTS 16 Topsoil
Blue W
stormwater catch pits, power poles, and fire hydrants · AS4454 Mulch
- 6m from overhead street lighting · Turf
General Planting Sources
· Refer to detail(s) herein respectively. · Survey: Max Waterson + Associates
· Supply and place plants according to plant schedule, plant setout notes and plan locations. · Civil Engineering: BAX Engineering
· Where discrepancies occur advise superintendent prior to planting.
· Ensure plants are placed and planted at equal centres, staggered, not in rows unless indicated
on plans.
· Mass and group plantings to be spaced evenly in a triangular pattern in odd numbered groups
to achieve optimum cover related to mature plant size and form.
· Shrubs and spreading groundcovers to be set back a minimum 800mm from roads, kerbs,
garden edges and paths to allow for mature plant form. Confirm with LA which require more
distance.
· All plants must be planted using one 'Agriform' 10g fertiliser tablet (N.P.K. 20-4.3-4.1) at a rate
of 1/140mm, 2/200mm, 3/300, 4/45 litre and above pot sizes, and one 5g tablet for tubestock.
Use phosphorous free tablets for Banksias, Grevilleas, and Callistemons.
· Excavate plant pit, cultivate subgrade to 150mm and scarify plant pit walls.
· Fill plant pit with water, allow to drain before planting. If pit does not drain within 24 hours,
notify superintendent and correct drainage.
· Soak plants thoroughly before removing from container.
· Remove plants from containers / bags / tubes carefully and inspect rootball, remove old matted
and coiled roots to expose young roots. All stock to be free of structural defects above and
below soil line (i.e. no girdled roots).
· Do not mix soil from hole with mulch and do not compact plant pit.
· Install fertiliser tablet(s), install plant, backfill plant with ameliorated site topsoil or imported
MRTS 16 topsoil.
· Water plant in well and maintain soil moisture levels through E.P.
· Mulch bio-area basin batter areas with 25mmØ+ hoop pine, deleterious material free, 100mm
deep - settled. Install open weave pinned jute net over mulch. Do not mulch within 50mm of
trunk / plant stem and finish 20mm below hard surfaces.
· Mulch bio-area media with sugar cane mulch, uniform finish, free of deleterious materials and
weed seed (i.e. nut sedge), 100mm deep. Install pinned, open weave jute netting over mulch.
Tube Stock Planting
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications.
· Install plants per plant schedule densities, specifications, and details.
Tube Stock Planting for Bio-retention Areas and/or Bio-pods
· Remove all weeds from planting areas. Level and trim per engineer's plans.
· Planting areas to be decompacted and cultivated 150mm deep.
· Install topsoil per specifications. Filter media by civil contractor.
New Turfed Areas
· See 1.0 Topsoil for cultivation and topsoil requirements.
· Trim topsoil, fill depressions and provide even falls as indicated on drawings.
· Finished turf grades/contours shall be smooth and undulating, free from deleterious materials,
debris, large clods of soil, stones, and organic matter, positive flowing minimum 2% slopes and
no water holding areas. Co-ordinate on-site with LA and ensure levels are approved prior to
laying turf. Where turf meets hard edges, adjust finish topsoil levels to allow stormwater to flow
unimpeded over laid turf to low area respectively.
· Supply and lay 'A' grade turf per plans and schedules.
· Where turf is installed on slopes >20% pin turf to industry standards. Remove pins once turf is
well established.
· Water turf in well and apply water to maintain soil moisture until established.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
M: +614 7705 5222
19.08.21 B For Application BB BB
LD2 Specifications, Plan Sheet Layout E: [email protected]
17.08.21 A For Application BB BB
Sheet Title Sheet 2 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD North
Page 3
Finishes Schedule Revegetation - Trees, Shrubs and Groundcovers - 732m²
Code GENUS species - Common Name Quantity
Code Item Product / Description Specifications, Size, Finish, Colour Dealer, Manufacturer
Trees - 1/5m², all from Tubes
Hardscape
ALPHITONIA excelsa - Red Ash 4
Garden Edge Timber Garden Edging Refer to Specifications and Detail Nominated by contractor and ARCHONTOPHOENIX cunninghamii - Picabeen Palm 4
approved by superintendent DIPLOGLOTTIS australis - Large Leaved Tamarind 4
EHRETIA acuminata - Kodad 4
Root Barrier Root Barrier for Street Trees Model: RSB600 Arborgreen Landscape Products ELAEOCARPUS obovatus - Hard Quandong 4
Size: RootStop Recycled Root Barrier 600mm Deep x 30m Roll Phone 1300 760 642 ELAEOCARPUS reticulatus - Blueberry Ash (White) 4
Install as per Detail and manufacturer's specifications. FLINDERSIA schottiana - Bumpy Ash 4
GLOCHIDION ferdinand - Cheese Tree 4
Softscape GLOCHIDION sumatran - Umbrella Cheese Tree 4
HOMALANTHUS nutans - Bleeding Heart 4
Topsoil Ameliorated site topsoil as per soil testing results or Excavate gardenbed areas 300mm deep and turf areas 150mm deep into existing ground. Cultivate subgrade 150mm. Nominated by contractor and HYMENOSPORUM flavum - Native Frangipani 4
import MRTS 16 topsoil for garden bed and new turf Backfill turf areas 150mm deep and garden areas 300mm - mounding in center with MRTS 16 topsoil. Refer to details. approved by superintendent. JAGERA pseudorhus - Foam Bark 4
areas. Provide soil testing results for topsoil and MRTS-16 Toposil available from; LITSEA leefeana - Northern Bolly Gum 4
certification to landscape architect. Hortus Group - contact LIVISTONA australis - Cabbage Palm 4
Aaron Ashlin 0448 007 350 LOPHOSTEMON confertus - Brushbox 6
MACADAMIA integrifolia - Queensland Nut 4
Organic Mulch Mulched Gardens Install 100mm deep settled, 25mm+Ø Hoop Pine organic mulch to all gardens keeping mulch 50mm clear of plant Nominated by contractor and MACARANGA tanarius - Macaranga 6
stems. On batters steeper than 1:4, install pinned open weave jute netting over mulch. approved by superintendent MALLOTUS philippensis - Red Kamala 4
MELIA azedarach - White Cedar 4
Bio-media Mulch Mulched Filter Media Install 100mm deep settled, weed and seed free Sugar Cane Mulch under pinned open weave jute netting keeping Nominated by contractor and MELICOPE elleryana - Pink Euodia 4
mulch 50mm clear of plant stems. approved by superintendent MISCHARYTERA lautereriana - Corduroy Tamarind 4
NEOLITSEA dealbata - White Bolly Gum 4
Road Reserve Turf Turf Refer to Plant Schedule and Detail Nominated by contractor and OLEA paniculata - Native Olive 4
approved by superintendent POLYSCIAS elegans - Celery Wood 6
RHODOSPHAERA rhodanthema - Deep Yellow-wood 4
Bio-basin Turf Temporary - Turf Refer to Plant Schedule and Detail Nominated by contractor and STENOCARPUS sinuatus - Wheel of Fire Tree 6
approved by superintendent
Shrubs - 1/2m², all from Tubes
ACACIA melanoxylon - Blackwood 17
BACKHOUSIA myrtifolia - Grey Myrtle 17
Planting Schedules Revegetation - Shrubs and Groundcovers - 956m² CRYPTOCARYA glaucescens - Jackwood
DODONAEA triquetra - Hop Bush
17
17
GREVILLEA hilliana - White Yiel Yiel 17
Road Reserves Code GENUS species - Common Name Quantity
HIBISUCS heterophylla - Native Hibiscus 17
Shrubs - 1/2m², all from Tubes HOVEA acutifolia - Purple Pea Bush 17
Code GENUS species - Common Name Size Quantity Notes
LEPTOSPERMUM polygalifolium - Pacific Beauty 17
ACACIA melanoxylon - Blackwood 60 PAVETTA australiensis - Butterfly Bush 17
Trees
BACKHOUSIA myrtifolia - Grey Myrtle 50 PITTOSPORUM revolutum - Rough Fruited Pittosporum 17
CRYPTOCARYA glaucescens - Jackwood 50 PITTOSPORUM rhombifolium - White Holly 17
BAC cit BACKHOUSIA citriodora - Lemon Scented Myrtle 45 L 1
DODONAEA triquetra - Hop Bush 50 SYZYGIUM luehmannii - Small Leaved Lilly Pilly 17
ELA pin ELAEOCARPUS reticulatus 'Prima Donna' (Pink) 45 L 3
HIBISUCS heterophylla - Native Hibiscus 50 SYZYGIUM oleosum - Blue Leaved Lilly Pilly 17
ELA whi ELAEOCARPUS reticulatus - Blueberry Ash (White) 45 L 3
POL ele POLYSCIAS elegans - Celery Wood 45 L 4 HOVEA acutifolia - Purple Pea Bush 50
*LEPTOSPERMUM liversidgei - Olive Tea Tree 50 Groundcovers - 2.3/m², all from Tubes
STE sin STENOCARPUS sinuatus - Wheel of Fire Tree 45 L 2
XAN chr XANTHOSTEMON chrysanthus - Golden Penda 45 L 2 *LEPTOSPERMUM petersonii - Lemon Scented Tea Tree 50
LEPTOSPERMUM polygalifolium - Pacific Beauty 50 ALPINIA caerulea - Native Ginger 20
*MELASTOMA affine - Blue Tongue 50 AUSTROMYRTUS dulcis - Midyim 50
Groundcovers
*MELALEUCA thymifolia - Thyme Honey Myrtle 50 BLECHNUM catilagineum - Gristle Fern (moist areas) 50
PAVETTA australiensis - Butterfly Bush 50 CORDYLINE petiolaris - Broad Leaved Palm Lilly 30
TURF CYNODON dactylon - Evergreen Couchgrass (Bermuda) Rolls
PITTOSPORUM rhombifolium - White Holly 80 CORDYLINE 'Rubra' - Red Fruited Palm Lilly 20
'A' Grade, healthy, weed and pest free
*FICINIA nodosa - Knobby Club Rush 100
Groundcovers - 2.3/m², all from Tubes GAHNIA clarkei - Tall Sawsedge 70
JUNCUS usitatus - Common Rush 100
Bio-Basin Plantings - all from tubes AUSTROMYRTUS dulcis - Midyim 140 LOMANDRA hystrix - Mat Rush 350
BLECHNUM catilagineum - Gristle Fern (moist areas) 100 PARARISTOLOCHIA praevenosa -
Basin A Basin B Basin C Basin D Basin E GAHNIA clarkei - Tall Sawsedge 100 Birdwing Butterfly Vine 30
Code GENUS species - Common Name Quantity Quantity Quantity Quantity Quantity *FICINIA nodosa - Knobby Club Rush 250 SCLERIA sphacelata - Razor Grass 50
JUNCUS usitatus - Common Rush 250 THEMEDA australis - Kangaroo Grass 50
WbD Bio-area Media Grasses - 8/m² (Basin A - 11.8m², Basin B - 11.5m², Basin C - 19.3m², Basin D - 11m², Basin E - 66.4m²) LOMANDRA hystrix - Mat Rush 500
SCLERIA sphacelata - Razor Grass 100 Selections from Site Pre-clear Ecosystems 12.9-10.1 and 12.9 - 10.16
GAHNIA clarkei - Tall Sawsedge - - - - 30 THEMEDA australis - Kangaroo Grass 100 * Non-ecosystem plant selection
FICINIA nodosa - Knobby Club Rush 25 25 40 20 125
JUNCUS usitatus - Common Rush 20 20 40 20 125 Selections from Site Pre-clear Ecosystems 12.9-10.1 and 12.9 - 10.16 NOTES:
LOMANDRA hystrix - Mat Rush 50 50 75 50 250 * Non-ecosystem plant selection · Existing vegetation to remain to be identified, protected and retained.
· All to be revegetation plants to be planted from 50mm Tubestock.
* Install CYNODON dactylon - Evergreen Couchgrass, 'A' Grade, healthy, weed and pest free from rolls temporary to media until NOTES: · Plant tubes as best suited to preferred hydrological and shade conditions per
approved quantum of homes are built. · Existing vegetation to remain to be identified, protected and retained. species odd numbered in random patterns within prescribed areas.
· All to be revegetation plants to be planted from 50mm Tubestock.
· Plant tubes as best suited to preferred hydrological and shade conditions per
species odd numbered in random patterns within prescribed areas.
Detention Basin Plantings (flat or bottom portion of basin) - all from tubes
Code GENUS species - Common Name
WbD Bio-basin Grasses - 2.3 plants / m² (Detention Basin flat/bottom area = 326m² )
GAHNIA clarkei - Tall Sawsedge 70
FICINIA nodosa - Knobby Club Rush 165
JUNCUS usitatus - Common Rush 165
LOMANDRA hystrix - Mat Rush 350
Drainage Channel Bottom Plantings - all from tubes
Code GENUS species - Common Name
WbD Bio-basin Grasses - 1 plant / m² (Drainage Channel bottom areas = 157m² )
GAHNIA clarkei - Tall Sawsedge 17
FICINIA nodosa - Knobby Club Rush 30
JUNCUS usitatus - Common Rush 30
LOMANDRA hystrix - Mat Rush 80
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
M: +614 7705 5222
19.08.21 B For Application BB BB
LD3 Finishes and Planting Schedules E: [email protected]
17.08.21 A For Application BB BB
Sheet Title Sheet 3 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 4
STREET TREE PLANTING DETAIL PLAN
50mm x 150mm H4 F14 hardwood timber
Topsoil with mulch edge, refer detail, typical
above - mulch to back
1800
of kerb, typical
Rootball
Fix edging with 3x F14 hardwood
Street tree,
50mm x 25mm x 450mm stakes, with 2x
refer detail below
galvanised nails to fix stakes to edging, typical
'Figure 8' hessian tree tie, typical
Rootbarrier,
see notes below Hardwood stakes (2), see section set parallel
KERB INVERT
to road, typical
ROAD
2x hot dipped galvanised triple grip screw to fix
mitred timber edging together, typical
Determining the Radius of the TPZ (Tree Protection Zone) NOTES:
· DBH (Diameter at Breast Height) - nominal trunk diameter at 1.4m above ground level Extent of tree pit excavation to be 1800mm x 1800mm in area, minimum (subject to footpath location). Remove all excavated fill off-site.
· TPZ should not be less than 2m nor greater than 15m (except where crown protection is required) Centre tree, 900mm from back of kerb, or between kerb and footpath as applicable.
· TPZ = DBH X 12 Garden areas to extend from back kerb to footpath, typ.
· TPZ of palms, other monocots, cycads and tree ferns should not be less than 1m Edging to extend to footpaths where applicable with street tree centrally located within garden (allowing for services setbacks), refer to
· Variations and encroachments to the TPZ in accordance with AS 4970-2009. plans for path locations.
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
3x Tube Ø
1800
Full and even crown, typical Tubestock plant as specified
2 - 50mm x 50mm x 2400mm F14 hardwood
centrally pointed non-treated stakes (shown
Fluorescent orange 5.5k.g perpendicular to kerb for graphic clarity only)
barrier fencing mesh secured 50mm wide hessian tree ties to be driven vertically into ground outside of the Form shallow saucer shaped depression
wrapped loosely around trunk, rootball and shall have a finished height lower around plant base
/ tied 100mm below top of star
Measurement then a figure 8 and secured to than the tree's lower lateral limbs
pickets at 300mm centres
taken for DBH stake with galvanised nails or Form shallow saucer shaped depression
Yellow plastic capped staples. Position tree tie between 100mm deep organic as specified, minimum
Fencing around base of plant and keep mulch 50mm
star pickets 1/3 to 1/2 overall height of tree. 50mm clear of plant stem
from trunk base
Vegetation to 1200mm painted yellow
1.4m
4m L root barrier panels as
be protected 100mm deep organic mulch as specified. Ameliorated site topsoil as specified, avoid
specified, centred at trunk with
Ground line Mound mulch at edge of plant pit to collect compaction, typical
DBH root deflecting ribs (or equal)
Crown water to fall down edges of plant pit.
600mm facing tree, installed per
TPZ manufacturer's instructions Turf as specified
150mm deep cultivated subgrade, typical
Timber Edge Detail 1 - LD3
NOTES:
· Protective fencing to be installed around the TPZ to the commencement of any site works.
Slow release fertiliser as specified. Use
Protective fencing identifying the TPZ, to be visibly signed within the development site. Lettering to comply with AS1319.
600
· phosphorus free tablets for Banksia,
Tree pit to be excavated to nominal depth of
· Fence posts and supports to have a diameter greater than 20mm, located clear of roots
600mm. Backfill hole with 100% friable Callistemon and Grevillea species.
· Where tree protection fencing cannot be installed, trunk, branch and ground protection as specified by the project
ameliorated site topsoil firming progressively.
Arborist in accordance with AS4970-2009
All excavated fill to be removed off site. Scarify
· Within TPZ, mulch to a depth of 50-100mm only for disturbed land Slow release fertilizer Subgrade
all sides of plant pit, typical.
· Maintenance of TPZ includes regular monitoring of soil moisture levels and weed removal by hand and controlled by as specified
appropriate use of herbicide 150mm cultivated subgrade 100mm deep uniform gravel layer. Provide
· TPZs to be monitored, inspected and certified by the project Arborist and pit walls clean connection to road drainage as advised
· Removal of tree protection measures at practical completion or as indicated by the project Arborist. on site by civil engineer.
1 Tree and Vegetation Protection Detail N.T.S. 3 Street Tree Planting - Timber Edges 1:30 5 Tubestock Planting N.T.S.
LD3 Typical Detail LD3 Typical Section Detail LD3 Typical Section
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Timber Specification:
Unseasoned hardwood, Class 1 Select Grade F17, ACQ or Tanalith E minimum H4 treatment, Full and even crown, typical
with one coat of timber coating.
2 - 50mm x 50mm x 2400mm F14 hardwood
Galvanised timber centrally pointed non-treated stakes to be
fixing screws, typ. driven vertically into ground outside of the
50mm wide hessian tree ties rootball and shall have a finished height lower
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
ELEVATION
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
1200mm, maximum refer
Turf as specified Plans
PLAN
150mm x 50 mm timber edging 50mm x 25mm x 450mm Tree pit to be excavated to nominal depth of
hardwood peg 600mm. Backfill hole with 100% friable
20mm @1200mm centres Slow release fertilizer ameliorated site topsoil firming progressively.
Turf as specified as specified All excavated fill to be removed off site. Scarify
Mulch as specified
all sides of plant pit, typical.
2x hot dipped galvanised
triple grip screw to fix mitred
100mm deep uniform gravel layer. Provide
timber edging together,
clean connection to road drainage as advised
typical.
on site by civil engineer. Road
SECTION Back of kerb or hardstand Turf Roll, typical
2 Hardwood Treated Garden Edge N.T.S. 4 Tree Planting - in Garden or Turf 1:30 6 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
dimensions in millimetres unless noted otherwise. M: +614 7705 5222
19.08.21 B For Application BB BB
LD4 Details E: [email protected]
17.08.21 A For Application BB BB
Sheet Title Sheet 4 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD
Page 5
Planting Plan Legend Detail
Electric Service
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
NBN Service / Conduit
OF
Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
ADJOINS LP2
Existing Vegetation / Tree to Remain 1
Refer to Detail
LD3
1 Tree Protection Fencing 1
FT Refer to Specifications, Detail LD3
ad
ADJOINS LP1
Ro
Vegetation Retention and Management Area 1, 5
Refer to Specifications, Details LD3
ns
rso
Timber Garden Edge 2
Pea
TE Refer to Specifications, Detail
LD3
Street Trees 2-3
Refer to Specifications, Plant Schedule, Detail(s) LD3
Trees 4
Refer to Specifications, Plant Schedule, Detail(s)
LD3
Turf 6
Refer to Specifications, Plant Schedule, Detail LD3
Bio-basin Media Planting 5
Refer to Specifications, Plant Schedule, Detail LD3
Detention Basin Bottom Planting 5
Refer to Specifications, Plant Schedule, Detail LD3
Revegetation Drainage Channel - Grasses 5
Refer to Specifications, Schedule, Detail LD3
16
5
Revegetation - Shrubs and Groundcovers
Refer to Specifications, Schedule, Detail LD3
Single Storey
House
5
Revegetation - Trees, Shrubs,Groundcovers
Refer to Specifications, Schedule, Detail LD3
8
BM: PM24974
RL: 110.614
BUILDER NOTE
ADJOINS LP2
ADJOINS LP1
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
Scale in metres
PLAN NOTES:
0 1 2 5 10 See Sheet LD2 for Schedules
Contour Interval: 200mm
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:200 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
1:400 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services dimensions in millimetres unless noted otherwise. M: +614 7705 5222
19.08.21 B For Application BB BB
(underground and overhead) from the responsible authority LP1 Planting Plan E: [email protected]
17.08.21 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 5 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 6
Planting Plan Legend Detail
Electric Service
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
BM: Pin
RL: 109.315 NBN Service / Conduit
OF
Refer to plans by others to confirm locations and
locate on-site prior to commencing works
BM: Pin
RL: 107.32 Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Water Service
W Refer to plans by others to confirm locations and
locate on-site prior to commencing works
ADJOINS LP1
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
ADJOINS LP3
ADJOINS LP2
12 Existing Vegetation / Tree to Remain 1
Refer to Detail
LD3
11 1 Tree Protection Fencing 1
FT Refer to Specifications, Detail LD3
13
Vegetation Retention and Management Area 1, 5
Refer to Specifications, Details LD3
14 15
Timber Garden Edge 2
TE Refer to Specifications, Detail
LD3
10
TE
WM Street Trees 2-3
TE
WM
TE
TE
TE
Refer to Specifications, Plant Schedule, Detail(s) LD3
Basin E
TE
TE
TE
WM
TE
Basin D Trees 4
Blue Wren Place TE
TE Refer to Specifications, Plant Schedule, Detail(s)
LD3
TE
TE
Extension
TE
Turf 6
Refer to Specifications, Plant Schedule, Detail LD3
Basin C 1 POL ele 1 BAC cit
TE
TE
TE
TE
TE
TE
TE
9 TE
TE
TE
TE
TE TE TE TE
Basin B
Bio-basin Media Planting
Refer to Specifications, Plant Schedule, Detail
5
LD3
TE
TE
TE
TE
TE
TE
TE
TE
TE
2 ELA whi 1 ELA pin
TE
5
TE
Basin A Detention Basin Bottom Planting
Refer to Specifications, Plant Schedule, Detail LD3
TE
TE
TE
TE
TE
TE
TE
TE
TE
Revegetation Drainage Channel - Grasses 5
Refer to Specifications, Schedule, Detail LD3
7 Revegetation - Shrubs and Groundcovers
5
LD3
6 5 Refer to Specifications, Schedule, Detail
5
Revegetation - Trees, Shrubs,Groundcovers
3 Refer to Specifications, Schedule, Detail LD3
4
BM: Pin
RL: 107.76
ADJOINS LP2
ADJOINS LP1
Timber R
etaining
Wall
Timber R
etaining
Wall
ADJOINS LP3
BUILDER NOTE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
Timber R
etaining trees during construction.
Wall
Scale in metres PLAN NOTES:
See Sheet LD2 for Schedules
0 1 2 5 10 Contour Interval: 200mm
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:200 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
1:400 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services dimensions in millimetres unless noted otherwise. M: +614 7705 5222
19.08.21 B For Application BB BB
(underground and overhead) from the responsible authority LP2 Planting Plan E: [email protected]
17.08.21 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 6 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North
Page 7
W
D
PE
AP
M Planting Plan Legend Detail
Electric Service
E Refer to plans by others to confirm locations and
locate on-site prior to commencing works
NBN Service / Conduit
OF
Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Sewer Service
S Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Telecom Service
T Refer to plans by others to confirm locations and
locate on-site prior to commencing works
Lot 99 RP881300
ADJOINS LP3
ADJOINS LP2
Water Service
W Refer to plans by others to confirm locations and
Park locate on-site prior to commencing works
Stormwater
SW
Refer to plans, confirm existing locations and
locate on-site prior to commencing works
Existing Vegetation / Tree to Remain 1
Refer to Detail
LD3
1 Tree Protection Fencing 1
FT Refer to Specifications, Detail LD3
Detention Basin Vegetation Retention and Management Area 1, 5
Refer to Specifications, Details LD3
Timber Garden Edge 2
TE Refer to Specifications, Detail
LD3
Street Trees 2-3
Refer to Specifications, Plant Schedule, Detail(s) LD3
Lot 100
Trees 4
Park Refer to Specifications, Plant Schedule, Detail(s)
LD3
Blue Wre
n Place Turf 6
Extension Refer to Specifications, Plant Schedule, Detail LD3
1 XAN chr
Bio-basin Media Planting 5
TE
Refer to Specifications, Plant Schedule, Detail
TE
TE
LD3
Detention Basin Bottom Planting 5
TE
Refer to Specifications, Plant Schedule, Detail LD3
TE
1 XAN chr
Revegetation Drainage Channel - Grasses 5
TE
1 STE sin
Refer to Specifications, Schedule, Detail LD3
5
2 TE
Revegetation - Shrubs and Groundcovers
Refer to Specifications, Schedule, Detail LD3
TE
TE
5
TE
Revegetation - Trees, Shrubs,Groundcovers
Refer to Specifications, Schedule, Detail LD3
1
TE
TE
TE
TE
TE
1 ELA pin
TE
TE
TE
TE
TE
ADJOINS LP2
ADJOINS LP3
TE
TE
1 ELA whi
TE
TE
TE
TE
3 POL ele
TE
1 ELA pin TE
TE
BUILDER NOTE
TE
Builder to review services plans by others to ensure that
none are aligned and / or installed within 1m of proposed
trees during construction.
Scale in metres TE
1 STE sin
TE
0 1 2 5 10 PLAN NOTES:
TE
See Sheet LD2 for Schedules
Contour Interval: 200mm
NOT FOR TENDER OR CONSTRUCTION
WARNING Scale:
1:200 @ A1 NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works and Project: BIRD LANDSCAPE DESIGN
1:400 @ A3
The locations of existing and proposed Telstra, telcoms, NBN,
electricity, sewerage, gas (if any), water and stormwater pipes Any reproduction or unauthorized use without written consent from Ecological Rehabilitation Plan Package Proposed Subdivision Landscape Architecture, Urban Design, Land Planning
have been furnished and require confirmation. Prior to and Bird Landscape Design is strictly prohibited. Do not scale from PDF plans. All Job No: 2157 2 Pearsons Road, Cooroy, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
during construction obtain the location of all services dimensions in millimetres unless noted otherwise. M: +614 7705 5222
19.08.21 B For Application BB BB
(underground and overhead) from the responsible authority LP3 Planting Plan E: [email protected]
17.08.21 A For Application BB BB and designer responsible for the service shown. Adjust
Sheet Title Sheet 7 of 7 Client: Vantralia Pty Ltd W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD landscape design as required to accommodate all services. North