Original source · versioned page text
MCU15/0034 - Approved Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Client:
Client:
ERICSSON
Client:
Project:
-
APPROVED PLANS NATIONAL BROADBAND
MCU15/0034 NETWORK
NOOSA COUNCIL
30 JULY 2015 SCHREIBERS
Rev Date Revision Details
Aurecon Australia Pty Ltd ABN 54 005 139 873
DESIGNER: JR
CHECKED: MR
APPROVED: LS
Drawing Title:
Drawing No. Revision
02
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 6 pages
Page 2
Client:
SITE LOCATION
Client:
ERICSSON
Client:
http://www.openstreetmap.org
http://creativecommons.org/licences/by-sa/2.0/
Use of this image is subject to the terms and conditions of the Creative Commons Attribution-ShareAlike 2.0
licence, the full licence of which can be accessed at http://creativecommons.org/licenses/by-sa/2.0/legalcode
Project:
NATIONAL BROADBAND
NETWORK
SITE CO-ORDINATES SCHREIBERS
MONOPOLE LOCATION
Rev Date Revision Details
APPROVED PLANS
MCU15/0034 Aurecon Australia Pty Ltd ABN 54 005 139 873
NOOSA COUNCIL
30 JULY 2015 DESIGNER: JR
CHECKED: MR
APPROVED: LS
Drawing Title:
Drawing No. Revision
02
Page 3
Client:
Client:
ERICSSON
Client:
Project:
NATIONAL BROADBAND
NETWORK
SCHREIBERS
Rev Date Revision Details
APPROVED PLANS Aurecon Australia Pty Ltd ABN 54 005 139 873
MCU15/0034
NOOSA COUNCIL DESIGNER: JR
30 JULY 2015 CHECKED: MR
APPROVED: LS
Drawing Title:
Drawing No. Revision
03
Page 4
Client:
Client:
ERICSSON
Client:
APPROVED PLANS
MCU15/0034 Project:
NOOSA COUNCIL NATIONAL BROADBAND
30 JULY 2015 NETWORK
SCHREIBERS
Rev Date Revision Details
Aurecon Australia Pty Ltd ABN 54 005 139 873
DESIGNER: JR
CHECKED: MR
APPROVED: LS
Drawing Title:
Drawing No. Revision
03
Page 5
I |
EASEMENT A
RP136904
2 EXISTING ENERGEX
LOT 23 one Pate
*RP187357? CHRE BER
t wor _ Qo“ 5 “0 Om
CEXISTING DRIVEWAY: a ¢ od 5 LOT 2
© EXISTING HOUSE -© . RP807386
©. (TYP) 5 LOT 11 A \=— G
®,5 © OXKRP883248) LOT 27
Q 6 o | ° So 6 6 RP215098
oe To | © © v
| EXISTING GATES el 2 o a,
QO OO Q 2
28 n° ” 6 ° @ S08 e®
© NEW ENERGEX 03 63KVA =< © BWP fo ©
: ° oO
C TRANSFORMER POLE oc eo 8
9 Io ~ 6 ° NBN ACCESS TRACK } & © 8%
© | NBN PROPERTY POLE WITH APPROX. OS ag _
©} METER PANEL So © oO] Bo ot O%
oO 7 Me oe <¢. 2
ies Gee TERS
Rese og pe ZF 20,0, 80
Se NBN SUBMAIN (APPROX. © Se =a OO MLS® go NEW NBN ON
600m) LOT 219 20S aq O COMPOUND 30
© ‘IRS Se 2 @"O°*5 LOCATION REFER? ©
Gg LOTS OP SSE (P837978 Pag oO 30
© so SP264695 (P.O Sg’ % . BN Gg @ Q PLANBELOW. 30.0
Oo ~u ww] OS OQo oe 08 LBaa aad 2 29
LOCATION PLAN
&
&
[ PLANT SCHEDULE
CODE |BOTANICAL NAME NO |SIZE HEIGHT STAKING / | HEIGHT
AT TIME GUYING AT MATURITY
OF
PLANTING (INDICATIVE
ONLY)
ACA lei |ACACIA leiocalyx 4 | 75mm | 250mm - to 6m
CAL DR_ |CALLISTEMON ‘Dawson River' 4 | 140mm |} 300mm - to 6m
ELA ret |ELAEOCARPUS reticulatus 4 | 75mm | 250mm - to 10m
LOM hys |LOMANDRA hystrix 3 | 140mm |} 300mm - to 1.3m
LOP con |LOPHOSTEMON confertus 3 25L =| 3000mm S to 20m
TN MEL qui |MELALEUCA quinquenervia 4] 25L |2000mm S to 25m
NOS _ a OTE: All Plants marked with a + are
tose planted a minimum of 3.0m from
the compound fence line as indicated
10m WIDE BUFFER 2 C on the plan
PLANTING AS SPEC.
Provide a 1m dia. Mulch
ring to each plant AS SPEC.
EXISTING VEGETATIO
To remain & be protecte
during site works Refer
Drawing LP3.01 for Tree
Retention Plan.
DASHED LINES
SHOWN FOR SETOUT
PURPOSES ONLY.
4 MEL qui x
4 ACA ee A
+
4 CAL DR
3 LOM hys
NEW STOCK
FENCE WITH
GATE ACCESS
5 AS SPEC:
Bs
3.0m WIDE
ACCESS GATE TO
COMPOUND
EXISTING VEGETATION
To remain & be protected during
site works Refer Drawing LP3.01 (y
for Tree Retention Plan.
wv
3.0m WIDE NBN
ACCESS TRACK.
2.4m HIGH CHAINWIRE
SECURITY FENCE TO
COMPOUND BY OTHERS.
\
[ EXISTING FENCE
- St \
_—
NS =
_—
_—
EXISTING VEGETATION [
To remain & be protected
during site works Refer Drawing
LP3.01 for a
ot
LEGEND
SX EXISTING VEGETATION
f \ To be retained.
\ Refer LP3.01 for Tree
Retention Plan
PLANTING
AS SPEC
7c
2.4m HIGH CHAINWIRE SECURITY
FENCE TO COMPOUND.
NEW STOCK FENCE
[—X——X—_ AS SPEC.
NOTE: REFER LP2.01 FOR SPECIFICATION
NOTES & DETAILS.
APPROVED PLANS
MCU15/0034
NOOSA COUNCIL
28 AUG 2015
B 18-08-2015 | APPROVAL
A 17-08-2015 | APPROVAL
PI 13-08-2015} PRELIMINARY
AMENDMENT:
FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE.
VERIFY AND CHECK ALL DIMENSIONS ON SITE.
Copyright by Jeremy Ferrier Landscape Architects. This drawing —
may not be reproduced for any purpose without the consent of
JEREMY FERRIER
LANDSCAPE ARCHITECT
72 Vulture Street,
West End QLD 4101
Telephone: (07) 3844 0700
Facsimile: (07) 3844 0722
Email: [email protected]
CLIENT:
NBN Co. Ltd.
PROJECT:
NATIONAL BROADBAND NETWORK
249 SCHREIBERS RD, COORAN
SITE No: 4GYM-51-32-SCHR
DRAWING:
LANDSCAPE PLAN
SITE:
249 SCHREIBERS RD,COORAN
QLD 4569
DATE: AUGUST 2015
™
SOs _--
PLAN
1:100 @At
SCALE: A.S
DRAWN: CW APPROVED: JF
PROJECT NO: DWG NO: ISSUE:
2015.087 LP1.01 B
Page 6
LANDSCAPE SPECIFICATION NOTES: EARTH WORKS CLEARING: Clear areas indicated on the drawings of trees, stumps, shrubs, slab foundations, paving and other surface debris. EXCAVATION: Excavate or fill areas to dimensions as shown on the drawings. All debris and material not suitable for backfill shall be removed from the site. Ensure caution when excavating near services. Consolidate areas of fill. TREE PROTECTION: Refer LP2.01 for Tree Retention Plan. All Existing Trees shown on the drawings & located within 50m distance of the NBN compound are to be retained as follows; MARKING: Mark all trees to be retained with a zincanneal tag, painted yellow. Secure the tag to the tree with a loose galvanised steel wire band. At the end of the Contract, the Superintendent will check and remove the tags. TREE PROTECTION ZONES: Trees to be retained are to be protected within tree protection zones (TPZs) as follows - - The perimeter of TPZs must be outside the existing canopy of the vegetation or as specified by the Arboricultural Consultant. - All TPZs are to be fenced with Temporary Fencing Panels (TFP) or Arboricultural Consultant approved alternative. - No person, vehicles or machinery are to enter the TPZs except with the written consent of Council - Any underground service installations must be bored and utility authorities must utilise a common trench where possible. -No fuel, oil dumps or chemicals are allowed to be used or stored within TPZs and the servicing and re-fueling of equipment and vehicles must be carried out away from the root zones. - No storage of material, equipment or temporary building is to take place within the TPZs. - Nothing whatsoever is to be attached to any tree including temporary services wires, nails, screws or any other fixing device. -TPZ fencing is not to be relocated without specific approval from the Consulting Arboriculturist and the Ecologist or Landscape Architect. EXCAVATION: Do not remove topsoil from within the drip line of trees to be retained unless otherwise specified. If it is necessary to excavate within the drip line, use hand methods such that root systems are preserved intact and undamaged. Open up excavations under tree canopies for as short a period as possible. Do not place spoil from excavations against tree trunks, even for short periods. All care shall be taken to avoid damage to the bark of trees. TREE ROOT TREATMENT: Do not cut tree roots exceeding 50 mm diameter unless permitted by the Superintendent. Where it is necessary to cut tree roots, use a chain saw or similar means such that the setting does not unduly disturb or rock the remaining root system. Immediately after cutting, apply an approved fungicidal sealant to the cut surface. BACKFILL to excavation around tree roots with an imported topsoil mixture as specified. Add fertilizer at the rate of 0.5kg/m3 as specified in PLANTING. Place the backfill in layers, each of 150 mm maximum depth, solidly compacted to eliminate voids. Do not backfill around tree trunk to a height greater than 150 mm above the original ground surface. WATERING: Immediately after backfilling, thoroughly water the root zone surrounding the tree. DECOMPACTION: If the ground under the tree canopies has been unduly compacted during the work under the Contract, for example by the operations of heavy constructional plant, loosen the soil to a depth of 150 mm. STOCKPILES: Do not stockpile materials near trees to be retained. RETAINED TREES are to be assessed by a qualified arborist to identify necessary pruning and tree surgery works. Where pruning of retained trees iS required it is to be undertaken in accordance with AS4373/96 and the "three-cut' method is to be utilised. DAMAGE TO EXISTING TREES: Should any tree be damaged during the work under the Contract, and if the Superintendent permits repair work to be done, such repair work should be performed by an approved tree surgeon at no extra cost. REMOVAL: If repair work is considered impracticable, or is attempted and fails, if so directed, remove the tree and root system, make good as necessary, and either replace the tree or pay damages, as determined by the Superintendent. REPLACEMENT: Provide, plant and establish as part of the works, at no extra cost to the Principal, a replacement tree of the same species and similar size or as approved by the Superintendent. DAMAGE ASSESSMENT: If replacement as part of the works is not approved, pay for any tree removed pursuant to the above, damages assessed by the Superintendent as the cost of replacement by others or to a maximum cost of $3,000 unless otherwise specified. CULTIVATION Cultivate all new planting areas to a minimum depth of 200mm. TOPSOIL & MULCHING TOPSOILING TYPE : Imported topsoil from an approved supplier to AS 4419 2003. Ensure soil is free of stones, weeds, sticks, roots and other deleterious material toxic to plant growth. DEPTH Planting Areas: 150mm SPREADING: Spread topsoil to the depths indicated and lightly compact so that the surface is smooth, free from hollows and has even grade falls. Spread the soil flush with any abutting surfaces generally, but allow for the depth of mulch as necessary. MULCHING Place a mulch ring to each plant at time of planting. TYPE: 25mm Forest Litter mulch to a depth of 75mm to all plants indicated on the drawings. The mulch must be free from soil, weed growth and other deleterious material harmful to the plants and finished 25mm below the final surface levels of adjacent surfaces. PLANTING PLANT MATERIAL: Only use vigorous, well established plants of local provenance with large healthy root systems that show no evidence of having been restricted or damaged. Plants must be free from any pests and disease, well hardened off and of a good form consistent with their species or variety. PLANT SIZES: Where a minimum plant height is specified in the "PLANT SCHEDULE" the height shall be the vertical distance between the top of the pot and the natural top of the plant whilst standing vertically in the pot. SUBSTITUTIONS: Make no substitutions unless provided in writing. Substitutions will not be approved if plants have not been made available for inspection at the Nursery within 30 days of the Contract being awarded. REPLACEMENTS: Replace, with plants of the same specified type, quality and size, any plants which fail or are damaged during the work under the Contract. WARRANTY: Furnish a warranty from the supplier attesting that the plants are true to the specified species and type, and free from diseases, pests, weeds and the like. STORAGE: Wherever possible, plants shall be planted immediately after delivery to the site. If this is not possible, keep them in good condition by appropriate storage methods, or as may be directed. Prevent theft, drying out or damage from any cause including frost, wind, sun, vermin, animals and the like. Provide an on_site nursery for holding plant stock on site for more than 48 hours, of sufficient size, with provision for watering. POTTING ON: If directed, pot plants into larger soil-filled containers to prevent them becoming root bound if there is an unforeseen delay. The Contractor shall bear the cost of potting on. Do not carry out potting on unless authorised. POT SIZES: Supply plants in weed-free containers of the sizes specified in the "PLANT SCHEDULE" shown on the drawings. PLANT TYPES: Refer Plant Schedule PLANTING: Water the plant and the planting areas thoroughly before planting begins. The planting holes should be large enough to allow the placement of the plant without damaging its root system. Remove plants carefully from container ensuring minimum soil loss and root disturbance. Root prune any root bound plants. Place plants centrally in their holes and so that the top of the soil level in the pot is 20mm below the finished surrounding soil level. Fertilize with a slow release tablet form of fertilizer. Backfill all holes using imported topsoil as specified. Water plants thoroughly. Tree Planting & Staking: Refer DETAIL LDO1. SPADE EDGING: To each plant shown on the landscape plan provide a spade cut edge as per detail LD02. STOCK PROOF FENCING: in the locations shown on the drawing, install stock proof fencing to DETAIL LDO3. Provide Timber Edging to the base of fence and an 800mm wide gate for Maintenance Access. ESTABLISHMENT & MAINTENANCE General Landscaped areas shall be maintained by the Contractor from the time of installation until the end of the Landscape Establishment Period. The Landscape Establishment Period shall be 12 months, with two (2) weekly visits for the first three (3) months, then monthly for remaining of nine (9) month period. Maintenance shall include watering, fertilizing, mowing, weeding, pruning, pest and disease management, plant replacement, site drainage and general tidying of the treated areas. WATERING watering shall be carried out at sufficient frequency to ensure establishment of the plants and to achieve the specified acceptance criteria. notwithstanding this requirement, watering shall be carried out at the minimum frequency stated in table 1 below. the stated rate of watering shall include any rainfall. One watering shall be defined as the application of - (a) for hydraulic seeding and mulching and grass seeding, 5l/m2 of water in not less than one hour; (b) for turfing, 101/m2 of water in not less than one hour; (c) for planting, in accordance with table 2. Watering of seeded and turfed areas shall be applied using a fine spray. Watering of such areas in weeks 8 and 12 shall occur immediately after fertilizing. Watering of plants shall be directed at the base of the plant to thoroughly water the root ball. Watering shall not cause erosion or displacement of treated areas. No water shall be allowed to spray onto, flow across or pond on paved areas including roadways, bikeways and footpaths. Pruning Plants shall be pruned as necessary to promote vigorous new growth. Pest and Disease Management Plants shall be monitored for pest and disease incidence on a weekly basis. Acceptable plant protection techniques shall be employed to manage any infestations. Site Drainage All landscape areas shall be maintained with sound drainage principles and the avoidance of runoff from the Site shall be enforced. Each irrigation of the Site shall be over a period of time that allows water infiltration (percolation) via the soil and does not produce run-off water. Tidying All landscaped areas shall be kept in a neat and tidy condition during the Landscape Establishment Period. Tidying shall include but not be limited to: the collection and removal of litter, plant prunings and dead plants; removal of mulch from roads and pathways; checking and adjusting plant support stakes and ties; and making good any disturbance to the surface of mulches. Plant Replacement Replace at no extra cost, any plant which dies from the cause whatsoever during the Establishment period. Plant replacements shall be of the same size and species and equal to size and similar plants at the time of death. 75mm min. mulch over edge. W Seeding or turfing as per approved Landscape Plan. FSL eeeeee eee / LDO2 SPADE CUT EDGE 300 mm Topsoil to AS4419 150 mm cultivated subgrade. Scale 1:10 @ Al; 1:20 @ A3 LEGEND NOTES TABLE GUIDE « STAKING TO BE CARRIED OUT PRIOR TO BACKFILLING PLANTING HOLE ANT SIZE| STAKE SIZE) . posiTION STAKES AWAY FROM ROOTBALL 50 - 600 900x25x25 STAKES TO BE ROUGH SAWN HWD TO SIZES AS 600 - 900 1200x25x25 900-1200 | 1500x25x2 SPECIFIED 1300 1500 teobeoeene + TIES SHALL BE NON-ABRASIVE, HEAVY DUTY POLYTHENE - 25x STRIPS LOOSELY TIED AROQND STEM IN A FIGURE EIGHT 1500-1800 | 2100x38x38 1800-2400 | 2400x38x38 CONFIGURATION : 38x * TIES SHALL BE ATTACHED TO STAKES WITH GALV. WIRE STAPLES. DO NOT PLACE HARDWOODS STAKES THROUGH ROOTBALL. SECURE STAKE FIRMLY INTO NATURAL GROUND. SECURE TREE WITH TIES BY LOOPING TIES INA FIGURE EIGHT PATTERN MULCH AS SPECIFIED. PULL AWAY FROM BASE OF PLANT . LDO1 TOPSOIL AS SPECIFIED FERTILISER TABLETS. PLACE SLOW RELEASE FERTILISER AT THE DEPTH OF THE ROOTBALL. DO NOT ALLOW TABLETS TO COME INTO CONTACT WITH ROOTS. REFER SUBGRADE TREE PLANTING & STAKING Scale NTS APPROVED PLANS MCU15/0034 NOOSA COUNCIL 28 AUG 2015 7 SCALE 1:10 @ A1; 1:20 @ A3 POSTS @ 3m CTR TYP (4m CTR MAX.) NOTES 1. THIS FENCE REPRESENTS THE MINIMUM STANDARD FOR FENCING. IT IS NOT FOR AREAS WHERE FLOOD DEBRIS MAY BE SIGNIFICANT. THIS FENCE APPLIES TO: - RURAL ENVIRONMENT - TEMPORARY FENCING - FLOODPLAINS - VEGETATION AREAS 2. RAILS AND POSTS TO BE 150 Dia. PREFERABLE TREATED PINE OR DURABLE HARDWOOD (NOT IRONBARK) ALL WIRES TO BE STAPLES TO TIMBER POSTS. WIRES TO BE JOINED ONLY AT POSTS. WIRE SHALL BE HIGH TENSILE FLEXIBLE WITH APPROPRIATE LONG LIFE PROTECTION (GALVANISING OR BETTER SURFACE TREATMENT). PLAIN WIRE SHALL BE 2.5Dia. MIN. 6. FOR FENCES IN AREAS WHERE THE OVERTURNING RESISTANCE IS LOW, AN EXTRA DEPTH OF UP TO 1200mm WILL BE REQUIRED. REFER TO SITE SPECIFIC DWG'S FOR DETAILS. 7. THE TYPE OF FENCE CONSTRUCTED MAY ONLY BE VARIES ako UPON AGREEMENT WITH THE PROPERTY OWNER AND VISIONSTREAM. 8. REFER SITE SPECIFIC DWG'S FOR FENCE / LANDSCAPE LAYOUT. + 4 1800mm TYPICAL TIMBER POSTS @ 150mm Dia. (1200MM ABOVE GROUND LEVEL) s CONTINUOUS 38 x 200mm 3 — TREATED PINE EDGE ° 75mm BACKFILL TANBARK OR TIMBER MULCH ——_ WEED MATT GL i IY 2 Lif Loe CEE KERR YY SSS 2. No. 10g 75mm LONG INS NS 'WISSS GALVANISED SCREWS ZAR QQ PRO PRIORI 80x80x450mM TREATED PINE ASNSSIKSY SSSR _ PEGS OR 450mm LONG GAL STAR RORY KKK PICKETS @ 1m CTR, POSITIONED RO RY <I CRORCRORCE 20mm BELOW LEVEL OF TIMBER IN NY SSPOHMHOYHY EDGE CYL CRQOEQROOR}RQq MSNA SKS SES KBMSSSSS TYPICAL POST AND EDGE DETAIL ISSN (REFER SITE SPECIFIC DWG'S IF TIMBER EDGE & TANBARK INFILL APPLICABLE) OICCX<€CO—<Q0?0v; POSTS @ 3m CTR TYP (4m CTR MAX.) 125 dia. TO 150mm dia. + TIMBER RAIL AT CORNERS 150mm dia. TIMBER POST STEEL SPIKE 250mm LONG, + ao 4 No. GALVANISED PLAIN WIRES @ EQUAL SPACING TO OUTSIDE OF FENCE 2 No. R10 DIAGONAL STRAINER WIRES AT 1200 CORNERS GL OQ wo — N A MOY) YOY YY ROLL RL LL RL RL SEXKGAKM TIMBER EDGE DETAIL 50mm ABOVE GROUND LEVEL. REFER TO SITE SPECIFIC DRAWINGS FOR REQUIREMENTS PY LDO3 NBN STOCK PR DOORS 2 SYS i MI TYPICAL POST AND STRAINER ASSEMBLY YY PORIRIRERO, SISISIGLY_T_ (5 (AT GATE OPENINGS, END POSTS & 200m CENTRES) SCALE 1:25 @ A1; 1:50 @ A3 OOF FENCE mY ORR (a wy PN K ZY K 600 TYPICAL POST SCALE 1:25 @ A1; 1:50 @ A3 B 18-08-2015 | APPROVAL A 17-08-2015 | APPROVAL P1 | 13-08-2015} PRELIMINARY FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE. VERIFY AND CHECK ALL DIMENSIONS ON SITE. Copyright by Jeremy Ferrier Landscape Architects. This drawing may not be reproduced for any purpose without the consent of Jeremy Ferrier Landscape Architects JEREMY FERRIER LANDSCAPE ARCHITECT 72 Vulture Street, West End QLD 4101 Telephone: (07) 3844 0700 Facsimile: (07) 3844 0722 Email: [email protected] CLIENT: NBN Co. Ltd. PROJECT: NATIONAL BROADBAND NETWORK 249 SCHREIBERS RD, COORAN SITE No: 4GYM-51-32-SCHR DRAWING: LANDSCAPE SPECIFICATION NOTES & DETAILS SITE: 249 SCHREIBERS RD,COORAN QLD 4569 DATE: AUGUST 2015 SCALE: A.S DRAWN: CW APPROVED: JF PROJECT NO: DWG NO: ISSUE: 2015.087 LP2.01 B
Page 7
LOT 23 * RP187357 ? - vor CEXISTING DRIVEWAY ~SAn © EXISTING HOUSE ~ OQ. (TYP) 9 ° 08 / Oo oO 2 EXISTING GATES oO o © NEW ENERGEX 3 63KVA = © TRANSFORMER POLE BD Ilo” NOR o ° © NBN PROPERTY POLE WITH ©] METER PANEL So ? “ee RE ET KC O¢ ae “ INE LOT 12 og o 1S RAS RP 83248 8 90° / 64 : T ° O60 L@NEWNBN COMPOUND CONBN SUBMAIN (APPROX: aa oO DSS O¢ 1 © boon 7p 5 LOT 219. 20°5) 25 GLOCATION REFER DWG : Lg LoTS OS SE cps37978 Ps oe 104 3 os pwr * ) @® LO Qo Oo © QO $P264695 [P.O Pa"! 5 Mga BY [o® ga8 ~u “~/] © OQo a Baa aa 2 I | EASEMENT A RP 136904 EXISTING ENERGEX POWER POLE SCHREIBER. | D - Qo g od o ‘Lot 1 SX CRP 8B3248) Wa 6 oo ° © ° e NBN ACCESS TRACK ) & APPROX. 750m LONG © % LOT 2 RP807386 VT LOT 27 RP215098 © o eo 9 LEGEND 6 EXISTING VEGETATION r To be retained. 7 NEW BUFFER PLANTING /}| REFER LP1.01. — — 50m OFFSET FROM COMPOUND LOCATION PLAN N.T.S APPROVED PLANS MCU15/0034 NOOSA COUNCIL 28 AUG 2015 NOTE:ALL TREES WITHIN 50M DISTANCE OF THE COMPOUND ARE TO BE RETAINED & PROTECTED AS SPEC. B 18-08-2015} APPROVAL A 17-08-2015} APPROVAL P1 | 13-08-2015 | PRELIMINARY FIGURED DIMENSIONS TAKE PREFERENCE TO SCALE VERIFY AND CHECK ALL DIMENSIONS ON SITE may not be reproduced for any purpose without the consent of Jeremy Ferrier Landscape Architects. JEREMY FERRIER LANDSCAPE ARCHITECT 72 Vulture Street, West End QLD 4101 Telephone: (07) 3844 0700 Facsimile: (07) 3844 0722 Email: [email protected] CLIENT: NBN Co. Ltd. PROJECT: NATIONAL BROADBAND NETWORK 249 SCHREIBERS RD, COORAN SITE No: 4GYM-51-32-SCHR DRAWING: TREE RETENTION PLAN SITE: 249 SCHREIBERS RD,COORAN QLD 4569 DATE: AUGUST 2015 SCALE: 1:500 @ A1; 1:1000 @ A3 DRAWN: CW APPROVED: JF PROJECT NO: DWG NO: ISSUE: 2015.087 LP3.01 B