Original Application Part 6 - Stormwater Plan [As Published] · 132008.1787
Plans and drawings: the text below has words only, no drawings.
NOGALES AT 9-19 HASTINGS ST NOOSA HEADS FOR SEAHAVEN DEVELOPMENT PTY. GENERAL NOTES Water Supply and Sanitary Drainage has been designed and shall be constructed in accordance with the Q’ld Standard Sewerage Law, Q’ld Standard Water Supply Law, the National Plumbing and Drainage Code AS 3500., all relevant Australian Standards, and the requirements of the Local Authority. These Drawings are diagrammatic only and shall be read in conjunction with all Architectural and other consultants drawings and specifications and other written instructions that may be issued during the course of the contract. Any discrepancies shall be referred to the supervising officer for decision before proceeding with the work. Contractor shall verify all fixture locations, invert levels, surface levels, and cover to pipes are correct and obtainable prior to commencement of the work. The exact location of existing, and proposed services, shall be ve i the relevant Authority, or other trades as applicable. Fire stop collars to be used on all plastic pipework penetrating fire resistant construction. SANITARY DRAINAGE Underground pipework shall be 100 dia. PVC DWV, min grade 1:60 U.N.O. Suspended Pipework shall be PVC class DWV. Trade waste pipework to grease trap suspended shall be "Coesprene” or HDPE. Underground shall be vitreous clay or HDPE. Trade waste pipework to oil separator shall be HDPE, or Vitreous clay with Nitrile” rubber rings. Cleanouts or inspection openings brought to surface in paved or concrete areas, or n buildings to have brass caps. STORMWATER DRAINAGE Underground pipework shall be 100 dia PVC class SW min grade 1:100 U.N.O. Downpipes shall be 100 Dia PVC class SW. Rainwater outlets (RWO) and planter outlets (PO) shall be ”Gatic Wade” or similar, with membrane clamp where required. WATER SUPPLY Pipework shall be according to AS4020 for example ABS (acrylonitrite stytrene), PP (Poly propylene) or PE (Polyethylene) or copper UNO. Water supply pipework shall be 20 dia UNO. Exception: one fitting only may be 15 dia. max. length 3000 mm. Hot water pipework shall be lagged. Hot water recirculating lines to be insulated with 20mm "Armaflex” or similar. Provide tempering valves on hot water to personal hygiene ‘tures. Underground copper pipework shall be "Kemlagged” or otherwise protected. Underground pipework not under concrete slab may be polypipe class PN20. one size larger than shown Exposed pipework in amenities areas, shall be chrome plated. Where water meters are installed within tennancies, provide remote readout adjacent to Electrical meters, or in a position as indicated by the Architect. relevant BACKFLOW PREVENTION Provide hose connection vacuum breakers to all Provide RPZD to any irrigation connections. COVERS & FRAMES Covers subject to vehicular traffic to be 535 dia, cast iron, medium duty UNO. Covers in grassed or conc. areas to be 535 dia. cast iron, concrete in light duty. Covers in paved areas to be 600 sq. Infill to match paving pattern. Covers in tiled areas to be as for paved areas with brass edging. Concrete infill covers to be stamped ”SWD” or ”SEW’ as appropriate. Covers & Frames to be ”Faston” or equal approved. GRATINGS Gratings for storm water to be "faston, Gatic” or approved equal. Duty to match manufacturers recommendations for loading cond Trench grate to be transverse bar. Floor waste grates to be chrome plated brass hose cocks LEGEND @ Diameter Existing water C.0.S. Cleanout to surface S Existing sewer CJ Capped junction Existing storm water cv Conrol valve —_ Existing house drain cs cisaners sink j i cw ‘0. ater ~- vont Poe 9 DAP Duct access panel Cold Water DCV Double check valve Een Eccentric Enlarger a ~~ Hot water . Elev Dge Evevated Drainage Storm Water Drainage Enl Enlarger - -— FC False ceiling Agi Drain FH Fire Hydrant FHR Fire hose reel FFL shed floor level ()— Rain Water Riser FU Fixture units . GIT Grease Interceptor trap 4} Cold Water Riser GP Gully pit @)— Down Pipe GMH Gully Man Hole ) o Stack gv Gate valve HW Hot water = Vent Pipe HCB House connection branch HD House drain @)=~ ° Group vent HL High level @®)- Educt vent IC Inspection Chamber IL Invert Level = Induct vent io Inspection opening (x?) Hot water riser ios Inspection Opening to Surface . K&C Kerb & Channel QS. Fire Dropper MH Manhole (§)— e Riser NRV Non return valve PB Path box PLV Pressure limiting valve | water meter PO Planter outlet ee Vv Valve RPB Real Property Boundary RPD Real Property description — he Hose Cock RPZD Reduce pressure Zone device i RWO Rain water outlet een Eccentric enlarger RWH Rain water head en Enlarger SD Sanitary Drainage SL Surface Level . Si Square QO ORG Overflow Relief Gully s/t Safe Tray SWD Storm water drain [jo we Roter t/td Trapped Tun TG Test gate FOS sk Sink td Tundish Tay Trench grate transverse bar LT TG( Trench grate longitudinal bar Laundry tub T.M.V. Thermostatic mixing valve Washin TV Tempering valve wm Machine we Underground u/s Under slab 8 FWG juny Waste u.n.o Unless noted otherwise . WS. Water supply S Bn Basin GPT Gross pollutant trap OSD On site detention tank Bth Bath Et FHR Fire Hose Reel <a ME Water Meter Shr Shower HWS Hot water system cs Cleaners Sk Flow (litres/sec) LTD. N Tq 08001 4g ouoMoW, Ne & Gor ° 32 Lo. so 2 PROPOSED DEVELOPMENT Stormwater Hydrograph for OSD whole site. 160 > [ | [ WHOLE SITE WEST EAST 8 140 aq = ===No Detention [_ITank Volume SITE 4722 3148 1574 F100 * With Detention] Require: 24,000Ltr ® 80 pa IMPERVIOUS 3606 2404 1202 = 60 — ~ 40+-—_# ~ = 2 x ROOF. 1310 874 437 o 20 S rm 041 CATCHMENT TABLE 0 2 4 6 8 10 12 #14 «2416 + «18 ~~ 20 Time (mins) Stormwater Hydrograph for OSD #1 West Slow leak Orifice: 9100 Stormwater Hydrograph for OSD #2 East Slow leak Orifice: 965. . . 35 70 so I | [ l l 3 30 ===No Detention |__| 60: g Va oO evention Tank Volume 50. o~ -——No Detention [__|Tank Volume LQ = — With Detention! require: 8,000Ltr 40 2 Sef ——With Detention] |Require: 18,000Ltr 8 “eT , 30: ¢ a z “J 20: ay a = = 105. < & ~ 0 2 4 6 8 10 12 14 16 18 20 6 8 10 12 14 16 18 20 Time (mins) Time (mins) HYDROGRAPHS FOR PEAK FLOW MITIGATION Q100 (refer _stormwater calculations) 6.0 = Pose 2.0 EXISTING SERVICES & SITE PLAN Tempering valve max 50°C Heater >60°C HC LOT 4 & 53 ON RP893438, 12 ON RP9YO8660 & LOT LOT 28 ON SP10560/7 DRAWING SCHEDULE 1997-1 Shr Sk Rainhead with remote water Check Val eek waive level indicator Dual Note: Provide mosquito safe overflow and inflow screening Switch Over Control Box or frog flaps Roof water le - STORMWATER MANAGEMENT PLAN & PEAK FLOW MITIGATION 1997-2 - STORMWATER MANAGEMENT PLAN & OPERATIONAL WORKS | fo Roof Water ‘af screen and mosquito \_ screen if applicable -—— i ! (—_|- —— Pool top up | WM WC Harvesting zone mark ” RAINWATER’ NRV et a sludge zone water Irrigation He meter — Max 500kPa pressure limiting valve within Frogflap path box GP CITT Stormwater a | System RPB Towns STORMWATER HARVESTING STRATEGY main (NOT TO SCALE) [Amd Description Date Issue Notes Date For Development Approval] X 18-09-08 For Building Approval For Tender For Construction As Constructed Gonstruciton riyaranute Building Service Engineers VY 1. To be responsibility of Management 2. To list all in flow filtering devices like leaf eaters at DP’s and other filters YY | NOTE: Do not scale frome these drawings. Do not rely on these drawings for alignment and levels of all existing infrastructure. It is the obligation of the contractor and/or plumbing contractor to survey all existing services prior to construction. NOTE: All kitchen, laundry & bathroom fitings and toilets shall comply with the minimum WELS Water Rating Level 3star (former AAA water conservation rating as per AS/NZ6400). Provide flow restrictor valves to taps and shower roses where required. The flow shall not exceed a maximum of 9L/min. a . contact: Reinhold Koenning MigAust RPEQ No 7023 3. To keep and maintain a log of cleaning PO Box 1176 4. To clean devices such as gutters and gully pits Buddina QLD 4575 -as to manufactures specification [email protected] PH: 5444 8645 we + . www.conhyd.com FX: 5444 8224 —minimum quarterly, but monthly in rainy season CLIENT -after each major rainfall event SEAHAVEN DEVELOPMENT PTY. LTD. 5. To inspect and clean tanks minimum once yearly 6. To install and maintain pump and fixtures for ARCHITECT reuse/watering/irrigation as to manufactures specification WODDS BAGOT & FOSTER DESIGN (PROJECT: ”SEAHAVEN” YY 9-19 HASTINGS ST. NOOSA HEADS DRAWING TITLE: STORMWATER MANAGEMENT PLAN PEAK FLOW MITIGATION Design] Hae | Checked | | Date 18-09-08 | Dwg. No. AMD. \_ sow: 1: 400 onaruno| tof 3 | 1997-1 J RPD:— REFER TO COVER SHEET ON 1997-1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Original Application Part 6 - Stormwater Plan [As Published]Related documentApplication case desk ↗
About this file
- File size
- 635 KB (small file)
- File type
No other editions are linked here.