Original source · versioned page text
2020-04-30 Ordinary Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING MINUTES 30 APRIL 2020
Electricity and Telecommunication Services
17. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre
technology telecommunications.
Easements
18. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
19. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a
service authority, the easement documentation must be in accordance with
the Grantee’s standard easement terms. Draft easement documentation
must be submitted to Council for endorsement.
20. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Damage to Services and Assets
21. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
a. where the damage would cause a hazard to pedestrian or vehicle
safety, immediately; or
b. where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
B. Find the following are sufficient grounds to justify the decision despite the conflict
with the Planning Scheme:
1. Some sport and recreational uses are accepted in the Industry zone given
the limited potential impacts of sport and recreation uses;
2. The fitness centre is of a similar size and scale to other approved gyms within
the Noosaville Industrial area; and
3. The proposed gym is consistent with the outcomes sought for the Venture
Drive Enterprise Precinct under the draft planning scheme.
C. Note the report is provided in accordance with Section 63(5) of the Planning Act
2016.
Amendment
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That item 11 be amended to read:
11. This development approval lapses 1 year after the commencement of the use,
unless further extended by Council in writing. On commencement of the use written
notification must be given to Council advising of the commencement day.
For: Crs. Stockwell and Finzel.
Against: Crs. Stewart, Lorentson, Jurisevic, Wegener and Wilkie.
Lost.
Page 6 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.