Skip to the record
For the highest quality transcripts.

Original source · versioned page text

RFI - Attachment 3 - Stormwater Management Plan

of 87

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 26, section 1. The text section number identifies this passage in the reader.

Documentation of these defects is to be carried out, recording the date the defect was identified, a description of
the defect, the cause of the defect and measures that can be implemented to reduce the likelihood of the defect
occurring in the future. Once the device has been repaired, the date of repair and the solution implemented
should also be recorded in the documentation. A record of all inspections and maintenance carried out on the
erosion and sediment control devices is to be maintained on site all times during construction.




Project number 21020                                                                                    Page 26 of 36
File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05
Revision 0


P +61 7 5211 1003                 A 75 Noosa Drive, Noosa Heads Qld 4567   E [email protected]    recorconsulting.com

Log in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.