Documentation of these defects is to be carried out, recording the date the defect was identified, a description of the defect, the cause of the defect and measures that can be implemented to reduce the likelihood of the defect occurring in the future. Once the device has been repaired, the date of repair and the solution implemented should also be recorded in the documentation. A record of all inspections and maintenance carried out on the erosion and sediment control devices is to be maintained on site all times during construction. Project number 21020 Page 26 of 36 File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05 Revision 0 P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.