RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 28, section 1. The text section number identifies this passage in the reader.
Figure 5.2 – DRAINS Post-development catchments
Modelling of the pre and post development conditions for peak flow conditions under the 1% A.E.P storm event has
found that the development will increase run-off rates as shown below in Table 5.1 Existing and proposed site peak
discharge rates.
Table 5.1 Existing and proposed site peak discharge rates
55 Carpenters Rd
A.E.P Qchange (%)
Qexisting (m³/s) Qproposed (m³/s) Qchange (m³/s)
1EY 0.411 0.472 0.061 15%
50% 0.481 0.59 0.109 23%
0.2 EY 0.75 0.94 0.19 25%
10% 0.936 1.11 0.174 19%
5% 1.1 1.29 0.19 17%
2% 1.28 1.53 0.25 20%
1% 1.42 1.72 0.3 21%
The site will discharge these run-off volumes into the downstream drainage feature, which conveys an upstream
catchment of approximately 1.2km². The results of the flood modelling for this existing catchment under peak 1%
AEP existing flow conditions have been assessed to determine the impacts of the proposed increase in flow rates
from the development.
From the results, the total flow across the flooded width of approximately 55m downstream of the discharge point
from the site was determined as a baseline. Taking the product of the vector velocity and flow depth grid results
across a section through the channel finds a total flow rate of 22.4m³/s is carried. An increase of 0.3m³/s under the
1% 2100 AEP flood conditions represents a change of 1.3% to the existing flow rate, and an increase in flow depth
of approximately 5mm over the width of the channel.
Relative to the existing catchment and flows being carried, attenuating the proposed development site would offer
insignificant benefits relative to the total existing quantities, and the increased flows are unlikely to result in
worsening to downstream conditions that would post risk or hazard compared to the existing flow rates. It is therefore
proposed that attenuation is not required for the subject development.
Project number 21020 Page 28 of 36
File RECOR Concept Stormwater Management Report - 21020.docx, 2022-09-05
Revision 0
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.