Original source · versioned page text
RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 37, section 1. The text section number identifies this passage in the reader.
N
3
11
105
108
LEGEND
PERVIOUS GROUND
IMPERVIOUS GROUND
DRIVEWAY SURFACE
110
IMPERVIOUS ROOF
S
W
S
W
S
W
S
W
S
W
W
S
W
S
S
W
S
W
W
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
PROPOSED SOCIAL HOUSING DEVELOPMENT
S
TITLE: STATUS:
W
W
55 CARPENTERS ROAD STORMWATER CATCHMENT FOR APPROVAL - NOT FOR
© ABN 89 647 469 707
COOROY, QLD, 4563 JARO BAULEKA LAYOUT PLAN CONSTRUCTION
RPEQ: 20693
S
75 NOOSA DRIVE
W
01 05/09/22 FOR APPROVAL ISSUE JAC MVP JB SCALE:
NOOSA HEADS, QLD 4567 CPEng
1:500
W
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
DATE: 05/09/22 SIZE:
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK
040 21020 A1 01
W
S
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (RFI - Attachment 3 - Stormwater Management Plan.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.