RFI - Attachment 3 - Stormwater Management Plan
Original PDF page 46, section 1. The text section number identifies this passage in the reader.
Pre-Post Peak Flow Comparison
Project number: 21020 Calculations: B. Parry
Street Address: 55 Carpenters Road
Locality: Cooroy, Noosa Council Date: 27/07/2022
55 Carpenters Rd
A.E.P Qchange (%)
Qexisting (m³/s) Qproposed (m³/s) Qchange (m³/s)
1EY 0.411 0.472 0.061 15%
50% 0.481 0.59 0.109 23%
0.2 EY 0.75 0.94 0.19 25%
10% 0.936 1.11 0.174 19%
5% 1.1 1.29 0.19 17%
2% 1.28 1.53 0.25 20%
1% 1.42 1.72 0.3 21%