Original source · versioned page text
Appendix G - Bushfire Hazard Assessment
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
19 & 20 Trading Post Road Cooroy QLD March 2018 Bushfire Hazard Assessment Report 6.0 SUMMARY CONCLUSION The subject site is located within a designated bushfire prone area. Bushfire overlay mapping includes areas that have been broadly cleared as part of Palm Lake Resort development that adjoins the subject site, and within the impact area. Ground truthing and a site specific bushfire hazard assessment has identified refinements to the Bushfire Hazard overlay, to reflect the current conditions at the site and surrounds. The site specific Bushfire hazard Assessment is undertaken in accordance with updated methodology of natural hazard assessment per SPP 2017, considered to have greater accuracy than the superseded SPP 1/03. Classified wet eucalypt forest vegetation with High Potential Bushfire Hazard is identified north-east of the site, at the periphery of the impact assessment area for the site. The vegetation is separated from the site by an established broad clearing at the electricity lines easement. This forms an effective existing Building Protection Zone. No further Bushfire Protection Zones are required for the site. Other areas mapped in the Bushfire Hazard Overlay are found to be cleared land areas. Access and egress to the site is via roadways connecting to existing sealed roads. Connections to other parts of Palm Lake Resort increase the ease of access to the site for emergency services vehicles, with broad turn-out areas in the surrounds of the club house facilities. The site specific Bushfire Hazard Assessment finds Site 229 and Site 230 are located within a Potential Impact Buffer Area for bushfire. The predicted radiant heat exposure at these sites is less than 12.5kW/m2 or BAL-12.5. The primary risk to structures is ember attack. Construction per AS 3959-2009 is required for deemed to satisfy provisions of the Building Code of Australia. This will provide increased resilience of the structures to bushfire attack. All other proposed sites (Sites 221 to 228 inclusive) are in Low Hazard parts of the site. They are located beyond 100m from classified forest vegetation. In accordance with AS 3959-2009, Construction of buildings in bushfire prone areas, the risk is considered very low and does not warrant any special construction requirements. Entrapment and risk to life from bushfire is not a foreseen event at any of the proposed dwelling sites. Taking into account the site specific conditions, the proposed more vulnerable resident group and the low level of risk, the proposal is recommended to be supported without the requirement for further Bushfire Management Zones. 20 Page Brisbane Bushfire Consulting Pty. Ltd. Bushfire Consultant, Architect BOAQ ARBV P.O. Box 219, Point Lookout Qld 4183 [email protected] brisbanebushfire.com.au Mob 0490 494 111
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.