Council archive · source document
Decision Notice - 010.2007.00002450.001 [As Published] · 142007.2450
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/2450 Date of Decision: 30 November 2007
1. APPLICANT DETAILS
Name: Raphill Pty Ltd
Postal address: PO Box 186
PEREGIAN BEACH QLD 4573
Phone no: 5471 3401 Fax no:
2. PROPERTY DESCRIPTION
Street address: 224 David Low Way Peregian Beach
Real property Lot 3 SP 194337
description:
3. OWNER DETAILS
Name: Raphill Pty Ltd
Postal address: PO Box 186
PEREGIAN BEACH QLD 4573
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Operational Works Landscaping, External Civil Works, No Yes
Frontage Works & Sediment and
Erosion Controls
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.
8. SUBMISSIONS
Not Applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 8 9. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Nil 11. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 12. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: 4/12/07 MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 8
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency.
2. Implement the landscape construction in accordance with horticultural industry best practices.
3. All native plant species located in group plantings shall not be subjected to any hedging maintenance
regimes.
4. All internal trees and street trees 45 litre and greater must be securely tied and staked to assist their
growth during the establishment period.
5. The density of planting must achieve the set out requirements as detailed on the approved landscape
plan.
6. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
service meters within the site.
7. All trees must be located a minimum of 1.0 metres from all services to prevent root/service conflict and to
provide future ease of maintenance requirements.
8. The site is to be landscaped in accordance with Council’s Policy on Landscaping
Guidelines and the approved plan of Development. The approved plans and documentation are Planting
Plan No. 2007-04 Revision 04 Plans 1 & 2, Surfaces Plan Drawing No. 2007-04 Revision 04 Plan 1,
Furniture Plan Drawing No. 2007-04 Revision 04 Plans 1 & 2 prepared by Shaun Walsh Landscape
Architect dated 23 November 2007 and as may be amended by these conditions and annotations detailed
on the approved plan.
9. Two additional trees of a minimum pot size of 45 litres shall be included within the landscape bed near
Kingfisher Parade.
10. This Development Permit lapses if the development has not happened by 30 November 2009, unless
application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and Filling of the Site.
11. The development shall be carried out in accordance with Engineering drawings No.
15406-EW1 dated July 2006 by SCG Consulting Engineers
or as modified herein.
12. These works do not include any centre median works in David Low Way, these works shall be part of
Council’s works program for David Low Way.
13. Should Queensland Fire Service (QFS) require it, a break shall be provided in the handrail on Kingfisher
Drive frontage, together with informal steps across the landscape area, to provide QFS direct access to
the booster pump.
5. A footpath 2.0 metres wide shall be constructed across the full frontage of the development. The footpath
shall have a slip resistant surface. The alignment, of which, shall be determined on site with Council’s
Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut” not trowel
jointed.
6. The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
Manual using soaked CBR tests of the subgrade.
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 8
The design pavement thickness, together with CBR test results shall be submitted to Council’s Manager -
Land Development for approval prior to placement of pavement material.
7. The finished level of all mulch in garden beds and landscaped medians is to be a minimum of 50mm
below the level of the adjacent top of kerb. All landscaping is to be constructed in accordance with
Council’s Planning Scheme Policy PSP03 Landscaping Plants and Guidelines.
8. The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.
9. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections, with
Council’s Construction Technical Officer or nominated staff. Council’s Construction Technical Officer shall
provide an inspection form for signing off by the Engineer at appropriate stages of construction, during on-
site meetings. Construction Technical Officer will also sign the form at each stage when conditions
required have been satisfied. The works will be accepted “On Maintenance” after this form, signed by the
inspector for each stage is complete, together with a letter from the Engineer requesting that the works go
“On Maintenance”.
10. Council standards shall apply to these works unless otherwise modified herein.
11. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
12. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
13. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
14. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
15. Safe pedestrian access on David Low Way, Heron Street, Kingfisher Drive shall be maintained at all
times. Should footpath / road closures be necessary to carry out construction works, Council’s
Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
16. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved, Council’s
Manager – Land Development may request further controls to be installed should approved measures be
inefficient.
17. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
satisfactory “As Constructed” records shall be submitted to Council.
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 8
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
services and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
18. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
19. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
completed.
20. These works are also to be in compliance with the relevant conditions of Development Permit No.
2005/1917.
21. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 8
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. Should any changes or modifications to the approved plans be required as a result of construction
constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be
made. Amended plans clearly indicating the changes must be lodged with this application along with the
appropriate fees.
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 8
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 8
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
Used in these records
Decision Notice - 010.2007.00002450.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
No other editions are linked here.