Council archive · source document
Decision Notice - 010.2007.00002450.001 [As Published] · 142007.2450
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 8
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency.
2. Implement the landscape construction in accordance with horticultural industry best practices.
3. All native plant species located in group plantings shall not be subjected to any hedging maintenance
regimes.
4. All internal trees and street trees 45 litre and greater must be securely tied and staked to assist their
growth during the establishment period.
5. The density of planting must achieve the set out requirements as detailed on the approved landscape
plan.
6. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
service meters within the site.
7. All trees must be located a minimum of 1.0 metres from all services to prevent root/service conflict and to
provide future ease of maintenance requirements.
8. The site is to be landscaped in accordance with Council’s Policy on Landscaping
Guidelines and the approved plan of Development. The approved plans and documentation are Planting
Plan No. 2007-04 Revision 04 Plans 1 & 2, Surfaces Plan Drawing No. 2007-04 Revision 04 Plan 1,
Furniture Plan Drawing No. 2007-04 Revision 04 Plans 1 & 2 prepared by Shaun Walsh Landscape
Architect dated 23 November 2007 and as may be amended by these conditions and annotations detailed
on the approved plan.
9. Two additional trees of a minimum pot size of 45 litres shall be included within the landscape bed near
Kingfisher Parade.
10. This Development Permit lapses if the development has not happened by 30 November 2009, unless
application to extend the currency is approved by Council.
Frontage Works, Access, Car Parking, Stormwater Disposal, Sediment & Erosion Controls and Filling of the Site.
11. The development shall be carried out in accordance with Engineering drawings No.
15406-EW1 dated July 2006 by SCG Consulting Engineers
or as modified herein.
12. These works do not include any centre median works in David Low Way, these works shall be part of
Council’s works program for David Low Way.
13. Should Queensland Fire Service (QFS) require it, a break shall be provided in the handrail on Kingfisher
Drive frontage, together with informal steps across the landscape area, to provide QFS direct access to
the booster pump.
5. A footpath 2.0 metres wide shall be constructed across the full frontage of the development. The footpath
shall have a slip resistant surface. The alignment, of which, shall be determined on site with Council’s
Construction Technical Officer. The expansion joints in any bikeway/footpath shall be “sawcut” not trowel
jointed.
6. The total required pavement thickness shall be based on the Department of Transport’s Pavement Design
Manual using soaked CBR tests of the subgrade.
MSOffice c:\docume~1\sshaw\locals~1\temp\bcl technologies\easypdf 5\@bcl@480f3b85\@[email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00002450.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
No other editions are linked here.